Construction Of Lanes / R Walls At Different Spots In Ddc Constituancy Surisyar 1.Const Of P Bund Near H / O Ali Kalas To H / O Gh Kalas And Others At Jabbad2. Const Of P Bund Near H / O Ab Aziz Sheikh Showket Ahmad And Others At Pethyar 3.Const Of R / W
Tender Overview
Project Description
Construction Of Lanes / R Walls At Different Spots In Ddc Constituancy Surisyar 1.Const Of P Bund Near H / O Ali Kalas To H / O Gh Kalas And Others At Jabbad2. Const Of P Bund Near H / O Ab Aziz Sheikh Showket Ahmad And Others At Pethyar 3.Const Of R / Wall Near H / O Gull Jehra Bashir Jehra And Others At Jadden 4. Const Of R / Wall Near Jahra Graveyard At Gogipathri B 5. Const Of R / Wall Near Masjid Sheriff Choudry Mohalla Brenwar6. Development Of Kamal Sheikh Astan Sheriff B / W Of R / Wall At Neegu
BOQ
| Sl. No. | Item Description |
| 1 | Road |
| 2 | CONST OF P BUND NEAR H/O ALI KALAS TO H/O GH KALAS AND OTHERS AT JABBAD Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 3 | Providing and laying of dry stone soling hand packed in foundations (2.10+ plum 3.68) |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 7 | Carriage of Aggrigatefor 20 Kms average lead and 200 mter head load from Source to site of work |
| 8 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 9 | Add provision for ,signboards,and photographs & unforseen items |
| 10 | CONST OF P BUND near h/o Ab Aziz Sheikh showket ahmad and others at PethyarEarth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 11 | Providing and laying of dry stone soling hand packed in foundations (2.10+ plum 3.68) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 13 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 14 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 15 | Carriage of Aggrigatefor 20 Kms average lead and 200 mter head load from Source to site of work |
| 16 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 17 | Add provision for ,signboards,and photographs & unforseen items |
| 18 | CONST OF R/wall near H/o Gull jehra Bashir Jehra and others at JaddenEarth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 19 | Providing and laying of dry stone soling hand packed in foundations (1.59+ plum 4.59) |
| 20 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 21 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 22 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 23 | Carriage of Aggrigatefor 30 Kms average lead and 200 mter head load from Source to site of work |
| 24 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 25 | Add provision for ,signboards,and photographs & unforseen items |
| 26 | CONST OF R/wall near jahra Graveyard at Gogipathri B Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 27 | Providing and laying of dry stone soling hand packed in foundations (2.38+ plum 6.9) |
| 28 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 29 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 30 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 31 | Carriage of Aggrigatefor 30 Kms average lead and 200 mter head load from Source to site of work |
| 32 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 33 | Add provision for ,signboards,and photographs & unforseen items |
| 34 | CONST OF R/wall near Masjid sheriff Choudry mohalla Brenwar Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 35 | Providing and laying of dry stone soling hand packed in foundations (1.05+ plum 2.97) |
| 36 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 37 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 38 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 39 | Carriage of Aggrigatefor 30 Kms average lead and 200 mter head load from Source to site of work |
| 40 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 41 | Add provision for ,signboards,and photographs & unforseen items |
| 42 | Development of Kamal Sheikh Astan sheriff b/w of r/ wall at Neegu Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: All kinds of soil : |
| 43 | Providing and laying of dry stone soling hand packed in foundations (0.78+ plum 1.42) |
| 44 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete |
| 45 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 46 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 47 | Carriage of Aggrigatefor 30 Kms average lead and 200 mter head load from Source to site of work |
| 48 | Carriage ofSoling ,plumfor 20 Kms average lead from Source to site of work |
| 49 | Add provision for ,signboards,and photographs & unforseen items |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents