}

Complete Overhauling And Commissioning Of Vertical Turbine Pump No.07 Of Kirloskar Make Bhr 50 A Under Maintenance Of Salauli Water Works. , XELPEM-Goa

Public Works Department-PWD has published Complete Overhauling And Commissioning Of Vertical Turbine Pump No.07 Of Kirloskar Make Bhr 50 A Under Maintenance Of Salauli Water Works. . Submission Date for this Tender is 04-12-2021. Pump repair and Maintenance Tenders in XELPEM Goa. Bidders can get complete Tender details and download the document.




Tender Notice

30034185
Corrigendum : Complete Overhauling And Commissioning Of Vertical Turbine Pump No.07 Of Kirloskar Make Bhr 50 A Under Maintenance Of Salauli Water Works.
Open Tender
Indian
Goa
XELPEM
04-12-2021

Tender Details

Complete Overhauling And Commissioning Of Vertical Turbine Pump No.07 Of Kirloskar Make Bhr 50 A Under Maintenance Of Salauli Water Works.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 29-Nov-2021 TENDER NOTICE Technical Bid 04-12-2021

Key Value

Document Fees
INR 3000 /-
EMD
INR 25715.0 /-
Tender Value
INR 12.85 Lakhs /-

BOQ Items

Name of Work:Complete overhauling and commissioning of vertical turbine Pump No.07 of Kirloskar make BHR 50 A under maintenance of Salauli Water Works
Sl. No. Item Description
1Complete overhauling and commissioning of BHR 50A vertical turbine pump. Work includes dismantling of motor from the pump, keeping it safe aside with removal of all electrical connections. Then the vertical turbine pump has to be removed without creating major damage to the components of the pump. the straightening of the shafts should be done by agency. Only spare parts including bowl assembly will be supplied by the department. whereas facility of welding, gas cutting, drilling and all machining has to be done by the agency at their own cost. Also consumable items such as oil, grease, lastners, rubber packings, paint for column pipe, water deflector, hose pipe, cotton waste, cleaning materials has to got by agency. After the overhauling the pump has to be refitted at the same position with motor and proper alignment has to be done, all electrical connections and proper alignment of pump and motor by an expert. The entire overhaulng including removal, dismantling, rectifications, replacing the damged components, refitting and commissioning has to be completed within 8 days.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail