|
| 1 | Earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. |
| 2 | Filling in foundation and plinth with sand including watering, ramming cost, conveyance & taxes materials & cost of labour with T&P required for the works etc. complete. (measurement will be taken on finished completed section only) |
| 3 | Cement Concrete (1:3:6) in foundations using hard granite metal of 4cm sizehard granite metal of approved quality from approved quarry including hoisting lowering, laying concrete to required level, compacting and curing for 28 says centering, shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including watering and curing, cost, conveyance royality and taxes of all materials & cost of all labour etc complete including dewatering if required complete as per specifications and direction of the Engineer-in-Charge. |
| 4 | P.C.C. work (M-15) grade with 20mm down graded black hard granite CB chipsusing approved quarry including hosting, lowering, layingconcrete watering & curing for 28 wdays centering and shuttering and finishing the exposed surface smooth providing groves or beads wherever necessary including cost, conveyance, royalty & taxes of all materials & cost of all labour with T&P required for the work etc. complete |
| 5 | Providing, placing in position of NP3Hume Pipe of 900 mm dia NP4 Hume pipe approved quality with copper Jointed kinds cement morrar (1:3) including all cost conveyance rolaylity all taxes and all leads and girls of all materials kinds cost all labour, T&P articles required for the work etc. complete. |
| 6 | Providing, placing in position of NP3Hume Pipe of 1000 mm dia NP4 Hume pipe approved quality with copper Jointed kinds cement morrar (1:3) including all cost conveyance rolaylity all taxes and all leads and girls of all materials kinds cost all labour, T&P articles required for the work etc. complete. |
| 7 | Providing, placing in position of NP3Hume Pipe of 1200 mm dia NP4 Hume pipe approved quality with copper Jointed kinds cement morrar (1:3) including all cost conveyance rolaylity all taxes and all leads and girls of all materials kinds cost all labour, T&P articles required for the work etc. complete. |
| 8 | Dismantling brick or stone masonry in lime or cement mortar under 3M height including stacking the useful materials for reuse and removing the debris within 50m lead. |
| 9 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earth work and Dismantling of Masonary Works including T&P, sorting the dismantled material and tacking the serviceable material with all lifts and lead of 1000 metres |
| 10 | Construction of embankment with materials obtained from borrow pit with all lift and leads, transporting to site by mechanical means which a lead of 5km, spreading, grading to requirement slope and compacting to meet requirement of table 300-2 and clause 305 of MORT&H specification as per the direction of the Engineer-in-charge. |