Water Resources and Irrigation Boards / Undertakings / PSU Closing in 0 days TDR #29989695

Providing House Sewer Connections To Apartments And Individual Houses To Sewer Network At Zone Iii Part Iii Of Calangute Baga Sewerage Scheme

Issued by Boards / Undertakings / PSU · SIDCGL Office Panaji, Goa
Tender Value
2.36 Crore
Estimated cost
Bid Submission
29 Nov 2021
0 days left
EMD
4.72 Lakhs
Bank guarantee accepted
Document Fee
15000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
SIDCGL Office Panaji → Goa
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Providing House Sewer Connections To Apartments And Individual Houses To Sewer Network At Zone Iii Part Iii Of Calangute Baga Sewerage Scheme

BOQ

Name of Work:Providing house sewer connections to Apartments and Individual Houses to sewer network at Zone III part III of Calangute Baga Sewerage Scheme
Sl. No. Item Description
1Providing,Laying and jointing of unplasticised non-pressure PVC pipes for using underground drainage and sewerage system confirming to IS : 15328 - 2003 stifness class SN-8 (8 KN/m2,SDR -34) including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) in all types of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km andRefilling the pipeline trenches with available earth and disposal of surplus earth as directed by the Engineer in charge including excavation, cutting and reinstating ofroad and storm water drain, encasing with PCC 1:2:4 as per IS:4127, rubble packing and refilling after completion of work in different areas. a)160mmOD
2Extra depth for Providing,Laying and jointing of unplasticised non-pressure PVC pipes for using underground drainage and sewerage system confirming to IS : 15328 - 2003 stifness class SN-8 (8 KN/m2,SDR -34) including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) in all types of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km andRefilling the pipeline trenches with plum cement concrete 1:3:6and disposal of surplus earth as directed by the Engineer in charge including excavation,and refilling after completion of work in different areas. a)160mmOD
3Providing,Laying and jointing of unplasticised non-pressure PVC pipes for using underground drainage and sewerage system confirming to IS : 15328 - 2003 stifness class SN-8 (8 KN/m2,SDR -34) including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) in all types of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km including Bed concrete 1:2:4(1 cement:2 coarse sand:4 graded granitic a basaltic stone aggregate 20mm nominal size) including rubble packing andRefilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in charge. a)160mm OD
4Extra for additional depth for Providing,Laying and jointing of unplasticised non-pressure PVC pipes for using underground drainage and sewerage system confirming to IS : 15328 - 2003 stifness class SN-8 (8 KN/m2,SDR -34) including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) in all types of soil including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km including Bed concrete 1:2:4(1 cement:2 coarse sand:4 graded granitic a basaltic stone aggregate 20mm nominal size) including Refilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in charge. a)160mm OD
5Construction of manhole rectangular in shape including cement concrete 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) foundation thickness of concrete 20cms and offset 10cms on both sides and first class brick work with bricks class designation 100kg/cm2 in cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including fixing in man-hole at 30cm c / c in 20x 20x10cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) and 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement and making channel in cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20m nominal size) neatly finished complete as per standard designincluding Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) including dressing of sides and ramming of bottoms,lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km. andRefilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in charge.Inside size 0.90 x 0.60m and 1.00m deep ( with precast RCC slab covers of concrete grade M25 30T capacity) including fixing with cement concrete 1:2:4 ( 1 cement : 2 coarse sand: 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar.) including Supplying & fixing of S.W. intercepting trap of 6\" dia inside the inspection chamber with Making connection of drain or sewer line with existing manhole including breaking and making good the walls, floors with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) 12mm thick cement plaster on both sides with cement mortar 1:3 (1 cement:3 coarse sand) finished with a floating coat of neat cement and making necessary channels for drains etc. for connecting to HSC manhole including rubble packing etc. complete.
6Extra / Additional depth of above square/ rectangular manholes at above item no in fractions with bricks class designation 100kg/cm2 in cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement neatly finished complete as per standard design.Inside size 0.90x0.60m including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km. andRefilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in charge
7Construction of manhole rectangular in shape including cement concrete 1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) foundation thickness of concrete 20cms and offset 10cms on both sides and first class brick work with bricks class designation 100kg/cm2 in cement mortar 1:3 (1 cement : 3 coarse sand) 23cms thick including providing & fixing CI footrests confirming to IS 5445/69 or revised and whose weight shall not be less than 5.30kgs including fixing in man-hole at 30cm c / c in 20x 20x10cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) and 12mm thick plaster inside and outside with cement mortar 1:3 (1 cement : 3 coarse sand) including adding waterproofing compound of approved brand in cement mortar with a floating coat of neat cement and making channel in cement concrete 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 20m nominal size) neatly finished complete as per standard design.Inside size 0.60x0.60m and 0.60m deep (with precast RCC slab covers of concrete grade M25 12T capacity) including fixing with cement concrete 1:2:4 ( 1 cement :2 coarse sand: 4 graded stone aggregate 20mm nominal size and applying the frame & cover with coal tar.including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of5km. andRefilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5km and all lifts and disposal of surplus earth as directed by the Engineer in chargeincluding rubble packing etc complete.
8Extra/Additional depth of above square/ rectangular manholes at above item no in fractions with 100kg/cm2 brickwork in cement morter 1:3 (1cement:3coarse sand) 23cm thick including providing and fixing CI footrests not weighing less than 5.30kgs incl. fixing in manholes @ 30cmc/c staggered in 20x20x10cm cement concrete blocks 1:3:6(1cement:3coarse sand :6graded stone aggregate 20mm nominal size) 12mm thick plaster inside and outside with cement morter 1:3 (1cement :3coarse sand)including adding water proofing compound of approved brand with a floating coat of neat cement for 0.60 x 0.60m Manholes. including Earthwork in excavation by manual means in foundation pipeline trenches drain (not exceeding 1.5m in widthor 10 sq. m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directedwithin a lead of 5km.andRefilling the pipeline trenches with available excavated earth in layers not exceeding 20cm depth consolidating each layer ramming and watering lead upto 5kM and all lifts and disposal of surplus earth as directed by the Engineer in charge..
9Dismantling of Chequered tiles flooring including PCC bed and reinstating with Chequered tile Flooring Wherever required in side apartment premises and house premises as required for providing House sewer connectionsincluding rubble packing , cement concrete 1:2:4 & disposal of surplus material to lead upto 5km
10Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50m lead.
11Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
12Centering and shuttering including strutting, propping etc. and removal of formwork for:
13a) Foundations footings, bases for columns and mass concrete.
14Providing and laying cement concrete 1:2:4(1 cement:2 coarse sand:4 graded granitic a basaltic stone aggregate 20mm nominal size) excluding cost of centering, shuttering and finishing in
15Raising of buried manholes to the required level wherever required by demolishing reconstruction of taper portion and restoration of road/ground surface to its original condition as per standard specifications and directions and as perstandard drawing.
16A) For 1.20m dia.manhole raised by 25cms.
17B) For 1.50m dia.manhole raised by 25cms.
18Core cutting 160mm dia holes in concrete structure with diamond headed core cutter so as to pass house sewer connection pipe including all material labour cost and machinery Charges ,water charges, power supply etc. complete in all respects as per the direction of the Engineer -in- charge.
19a)For sewerpipe of dia 150mm-200mm

AI Tender Summary

OUR REF NO 29989695
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 2.36 Crore
LAST DATE 29-11-2021
Authority
Authority Name Sewerage And Infrastructural Development Corporation Of Goa Limited
Work Description Providing House Sewer Connections To Apartments And Individual Houses To Sewer Network At Zone Iii Part Iii Of Calangute Baga Sewerage Scheme
Basic Detail
Tender No SIDCL/Admn-7/F.No.TN- 12 / 909 /21-22 / 3
Bidding Type Tender
Location
City SIDCGL Office Panaji
State Goa
Key Dates
Publish Date 22 Nov 2021
Submission Date 29 Nov 2021
Open Date 02 Dec 2021
Finance
Tender Value 2.36 Crore
Tender Fee 15000
EMD 4.72 Lakhs
Exemption Not Available
Document List
Tendernotice_2.pdf
Tendernotice_3.pdf
150b08a9-62f9-4823-acfc-0db8a341df90.html
BOQ_1445.xls
Tendernotice_1.pdf
Tendernotice_4.pdf
Tendernotice_5.pdf
Tendernotice_6.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 22, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 29, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 02, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf

html

150b08a9-62f9-4823-acfc-0db8a341df90.html

xls

BOQ_1445.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_4.pdf

pdf

Tendernotice_5.pdf

pdf

Tendernotice_6.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders