| 1 | Providing and laying Well Gravel to the specified thick including cost and conveyance ofWellgravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH |
| 2 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. |
| 3 | Providing and laying WMM (Wet Mix Mecadam) of 250 mm compacted thickness in two layers of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORTH 406 |
| 4 | Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI)per10 sqm for preparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 |
| 5 | Providing and laying Prime Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1)per10 sqm for preparatory to another bituminous construction over it, including cost of material,labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 |
| 6 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumenfor premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 |
| 7 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of9.50-2.36mm and 0.26 cum of2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumenand 4.02 kg plasticfor premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading themix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M,Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 |
| 8 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 BTNDSS No. 23 & 24 V,VI,S2 |
| 9 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2)(S5A) VII |
| 10 | Supplying and errecting centering to sides and soffits including supports and struttingfor drainage sides andculvert body wall sidesusing M.S Sheets of size90cm x 60cm and B.G 10stifenedwith welded mild steel angles of size 25mm x 25mm x 3mm for boardinglaid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.90(S3),86,86A,V,VI,(S3),VII (For Drain,Deck slab & Retainingwall) |
| 11 | For Drain Sides |
| 12 | For culvert bottom |
| 13 | Vaibrating Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using20mm ISShard broken granite metal including cost and conveyance of all materials to work site and all labour charges etc., for mixing laying , consolidating,levelling and curring etc., complete Complying with Standard Specification as per TNDSS No.30,V,VI,S2,(SSA),VII |
| 14 | Supplying, Fabricating and placing in position mild steel or deformed steel bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc.Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers |
| 15 | Providing and Laying Reinforced cement concrete of mix 1:1 1/2 :3 (one cement, one and half sand, three aggregate) using machine crushed hard broken granite stone jelly 20 mm gauge forRCC works in all types of foundation footings rafts, columns floor, beams, slabs of all shapes (excluding cost of providing centering and fabrication of reinforcements which shall be measured and paid under separate items but including curing etc. and including fixing fan clamps or hooks, after laying of Electrical conduct pipes, junction boxes wherever required etc. complete complying with standard specifications and drawings and as directed by departmental Engineers. |
| 16 | Finishing the top of flooring with Granothatic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., |
| 17 | Providing and laying of hot applied thermoplastic compound f2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification NO.803 |