| 1 | Providing & fixing M.S. Door of required pattern with angle iron frames (50x50x6)mm size graded with Sq. bars 16mm size 10 cm c/c and provision for hinges and locking arrangement and nut bolts including cutting fabricating welding and applying a priming coat of approved steel primer using structural steel as required etc. complete. (Rate Including G.S.T.) |
| 2 | Supply and fixing red sand stone DASA having floral designed on exposed surface fine dressed and set in composite lime mortar 1:1:1 ( 1 Lime: 1 Surkhi : 1 C. Sand) mixed with composite materials including taking out old decayed red sand stone dasa for fixing new dasa supply of allrequired materials labour T&P etc. required for proper completion of work.(Rate Including G.S.T.) |
| 3 | Red sand stone work in plain fine dressed in string coarse as Choukhat, Slab, Beam, Dab, Quid, Pillar & Steps set in composite lime mortar 1:1:1 (1 Lime : 1 Surkhi : 1 C. sand ) mixed with composite materials and steel dowels including pointing with same mortar with and admixture of pigment matching to the stone shade and including taking out old decayed and broken red sand stone by chiseling bit by bit very carefully without disturbing to the adjoining stones.(Rate Including G.S.T.) |
| 4 | Provision for engagement of unskilled labour for day to day maintenance and proper up keep of the monument for the year 2021-22 (Rate Including Minimum Wages Rate+E.P.F.+E.S.I.+G.S.T.) |
| 5 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.(Rate Including G.S.T.) |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-incharge.(Rate Including G.S.T.) |
| 7 | Providing and laying cement (1cement, 2 Coarse Sand & 4 graded stone aggregate 20mm gauge in column piers abutment pillars posts and struts upto floor two level etc. excluding the cost of centering & shuttering.(Rate Including G.S.T.) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, base of columns, etc. for mass concrete.(Rate Including G.S.T.) |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.(Rate Including G.S.T.) |
| 10 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.(Rate Including G.S.T.) |
| 11 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge :In cement mortar.(Rate Including G.S.T.) |
| 12 | Stone Masonry in super structure above plinth level and upto floor two level & in square & rectangular pillars in cement mortar 1:6 (1cement 6 C. sand) including leveling up with cement concrete and 1:6:12 (1cement 6 C. sand & 12 graded stone aggregate 20mm size).(Rate Including G.S.T.) |
| 13 | Pdg. 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 (1 cement : 5 C.sand) and a top layer 6mm thick cement plaster 1:3 (1cement : 3 C.sand) finished rough with sponge.(Rate Including G.S.T.) |
| 14 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.(Rate Including G.S.T.) |
| 15 | Recessed Pointing with composite lime mortar 1:1:1 ratio (1Lime :1 C. sand: 1 Surkhi) mixed with colour pigment including racking out joints etc. and supply of all materials labour, scaffolding, T&P etc required for proper completion of work.(Rate Including G.S.T.) |
| 16 | Providing and fixing of red sand stone benches having 4 legs of size (0.26x0.26x0.45)m with simple moldings and 8cm thick red sand stone top size 1.50x0.60 m as per design and matching to the existing pattern at site.(Rate Including G.S.T.) |