| 1 | Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. |
| 2 | Const. of R/wall, Scupper, Causeway |
| 3 | Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 4 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets, scupper etc. Including supply of all materials,labour, t & p & royality etc,required for proper complition of work. (As per PWD Uttarakhand specifications) |
| 5 | Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As perPWD Uttarakhand specifications) |
| 6 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, inbreast walls, retaining walls, parapets, scuppers, etc. includingsupply of al labour, T&P and royaltiies etc. complete as per drawing andtechnical specifications Clauses 702, 704, 1202 & 1203 of MORDSpecifiction |
| 7 | Providing concrete for plain/ reinforced concrete in open foundations complete as perdrawings and technical specifications Clause 802, 803, 1202 & 1203Nominal mix 1:3:6 |
| 8 | Providing Nominal mix 1:2:4 (Hand mixed) concrete forplain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C. grade M 20 |
| 9 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers asper clause no. 2011.3.1 of MORD specifications (First revision\"2014) and IS1786:2008 clause no. 1.6) |
| 10 | Plain/reinforced cement concrete in substructure complete as per drawings andtechnical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204R.C.C grade M 20(For height upto 5 m) |
| 11 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 |
| 12 | Plain/reinforced cement concrete in substructure complete as per drawings andtechnical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204(For height upto 5 m)P.C.C. grade M 20 |
| 13 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers asper clause no. 2011.3.1 of MORD specifications (First revision\"2014) and IS1786:2008 clause no. 1.6) Causeway |
| 14 | C/O Longitudinal Drain Pacca, Parapets |
| 15 | Construction of hill side drain in accordance with the requirement of specifications true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 1606.1 |
| 16 | Constriction of parapet as per detailed drawing attached including all material, labour and T&P etc. complete in all respect. |