| 1 | Package-1 Cleaning, tightning of screws, packing of panel for rodent etc |
| 2 | DCS, PLC panels and other |
| 3 | Computer/Workstation |
| 4 | ACDB / UPS |
| 5 | LIE/LIR panel |
| 6 | Package-2Servicing of Boiler FSSS field SystemWork includes:- Removal, cleaning, checking, replacement, Refitting and trialand as per site requirement |
| 7 | Ignitor Guide pipe Assembly |
| 8 | Scanner Guide pipe Assembley |
| 9 | Flame scanners |
| 10 | Servicing of GFC sensors/Coal flow |
| 11 | Drum level EWLI system |
| 12 | HEA advanced retractor mechanism |
| 13 | Overhauling of HONV, LONV, Corner skid oil valve |
| 14 | Package-3 Overhauling of boiler primary instruments/JB installed in field Work includes:- Removal, cleaning, checking, replacement, Refitting and trial |
| 15 | Transmitters |
| 16 | Thermocouple / RTD |
| 17 | Switches/Gauges |
| 18 | Solenoid valves |
| 19 | JB/TB, Limit switches |
| 20 | Cleaning of Air filter Regulators |
| 21 | Servicing of FSSS Actuator (Mill seal air valve/damper, Emergency damper) |
| 22 | Package-4 |
| 23 | Servicing and re-commissioning of various power cylinders and dynodrive of coal mill, |
| 24 | Package-5 |
| 25 | Servicing of SADC system |
| 26 | Package-6 |
| 27 | Overhauling, refitting and recommissining of valves and damper pneumaticactuators. |
| 28 | Package-7 |
| 29 | Overhauling, refitting and recommissioning of valves and damper electrical actuators |
| 30 | Package-8 |
| 31 | Servicing of power cylinders Hot air damper & Cold Air Damper FD, ID, PA |
| 32 | Package-9 |
| 33 | Lifting, Shifting and assistance in repairing and re-installation of LPBP Actuator |
| 34 | Package-10 |
| 35 | Lifting, Shifting and Assistance inRepairing and re installation of HPBP Actuator |
| 36 | Package-11 |
| 37 | Assistance in Repairing , re- installation and Lifting, Shifting of CRH NRV, Yuken make OSU and Samson make DPR with actuator |
| 38 | Package-12 Overhauling of TG primary instruments/JB installed in field |
| 39 | Transmitters |
| 40 | Thermocouple / RTD |
| 41 | Switches/Gauges |
| 42 | DCS, PLC panels screw tightening |
| 43 | LIE/LIR panel |
| 44 | Package-13 |
| 45 | Removal and reinstallation of Instruments/Sensor and shifting of cable tray, JB etc as per requirement from BFP |
| 46 | Removal and reinstallation of Instruments/Sensor and shifting of cable tray, JB etc as per requirement from CEP,CW |
| 47 | Package-14 |
| 48 | Overhauling of Mill Instruments |
| 49 | Package-15 Overhauling of Instruments |
| 50 | Transmitters |
| 51 | Thermocouple / RTD |
| 52 | Switches/Gauges |
| 53 | Overhauling of UCP panel and instruments |
| 54 | Cleaning of Annunciation panel |