Urban Development Department-UDD has published Plantation Works ( With Gabion ) And Fixing And Fitting Of Paver Block From Dhansar More Towards Bit Chowk To Sindri And Sharpura Under 15Th Finance Dmc, Dhanbad Plantation Works ( With Gabion ) And Fixing And Fitting Of Paver Block From Dhansar More. Submission Date for this Tender is 24-11-2021. Plantation Work Tenders in DHANBAD Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | First Year :- Fencing Work Bamboo stalks - 04 nos. each @ 80.00 including freight |
2 | Construction of Bamboo trellis |
3 | Painting bamboo stalks with coal tar/black japan/black paint |
4 | Painting trelli units with green and red paint |
5 | Soil levelling for gabion installation. Digging 04 pits for each unit with size 1"x1"x1"-6", alongwith accumulation of the excavated soil. |
6 | Installation of stalks alongwith trellis - 04 stalks - 29 stalks per manday |
7 | For trellis :-1. wire - 100 gm (Rs. 67 per kg) |
8 | 2. nails - 300 gm (Rs. 69 per kg) |
9 | Earth work : Digging of pits 2"x2"x2" alongwith accumulation of excavated soil |
10 | Plant cost with provision of 20% extra plants for replacement of dead plants alongwith carriage/unloading of plants |
11 | sign board and gabion numbering |
12 | GPS photograph |
13 | Maintainance/plantation works 2nd year :- Procuring sand/manure with mixture preparation(sand and vermicompost) for pit filling |
14 | Plantation (DAP - 50 gm and insecticide - 4 gm) |
15 | 3 times Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide) Roger spray in leaves, replacement of dead plants |
16 | Watering ( through rickshaw/trolley) |
17 | Watching and Guarding |
18 | GPS photograph |
19 | Maintenance (3rd year):- Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide) |
20 | Watering ( through rickshaw/trolley) |
21 | Watch and Ward/repairing of gabions |
22 | GPS photograph |
23 | Add Contractor Profit 10% |
24 | 5.1.1 Earth work in excavation in foundation trenches in ordinary soil Ivide classification of soil item A) and disposal of excavated earth a obtained to distance up to 50 mm including all lifts with levelling, ramming the foundation trenches removing roots of trees shrubs all complete as per approved design and per building specification and direction of E/I. |
25 | 4.2 (i) NH Granular Sub-Base with Coarse Graded Material (Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (i) for grading- IMaterial |
26 | 16.91.2Providing and laying factory made coloured chamfered edge cement concrete paver block of required strength , thickness and size/shape, made by vibratory method using PU mould laid in required colour & pattern over 80 mm thick compacted bed of fine sand ,compacting and proper embedding /laying of inter locking paver blocks in to the sand bedding layer through vibratory compaction by using plate vibrator , filling the joints with sand and cutting the paver blocks as per required size and pattern ,finishing and sweeping extra sand in footpath parks, lawns, drive ways or light traffic parking etc. complete as per manufacturer"s specifications and direction of E/I. 80 mm thick C.C. paver block of M-35 grade with approved colour, design and pattern. |
27 | 5.3.1.2 Providing and layingin position cement concrete of specified gradeexcluding the cost of centering, shuttering, finishing and reinforcement all work up to plinth level 1:2:4 (1 Cement:2Coarse (Zone III: 4 graded stone)aggregate 20mm nominal size. |
28 | Carriage of Materials Stone chips 17.0 km Qty |
29 | Stone Metal 23.0 km Qty |
30 | Sand lead 35.0 km Qty |
31 | Cementlead 3.0 km Qty |
32 | CC Paver Blocklead 11.0 km Qty |
33 | Disposal of Curtred Earth lead 1 km |
34 | Provision for Sign board & Photography |
35 | Add 12% GST |
36 | Add 1% Labour Cess |