| 1 | Compaction of earth work & Preparation of subgrade including loosening, leveling of earth225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 ofMORT&H specifications. (In case of link roadsearth work to be done by villagers) |
| 2 | Providing and laying of Brick on end edging6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling anddisposal of surplus earth up to 50mtr complete asper Punjab PWD specifications |
| 3 | Construction of granular sub-base by providingmaterial, spreading in uniform layers with motorgrader on prepared surface, mixing by mix inplace method with rotavator at OMC, andcompacting with vibratory roller to achieve thedesired density, complete as per MORD technicalspecifications |
| 4 | Providing, laying, spreading and compactingstone aggregates of Grading I to water boundmacadam specification including spreading inuniform thickness, hand packing, rolling withsmooth wheeled roller 8-10 tonnes in stages toproper grade and camber, applying and broomingrequisite type of binding Materials to fill up theinterstices of coarse aggregate, watering andcompacting to the required density complete asper technical specifications (withoutscreening for low volume Roads/undersigned) |
| 5 | Providing, laying, spreading and compactingstone aggregates of Grading II to water boundmacadam specification including spreading inuniform thickness, hand packing, rolling withsmooth wheeled roller 8-10 tonnes in stages toproper grade and camber, applying and broomingrequisite type of binding Materials to fill up theinterstices of coarse aggregate, watering andcompacting to the required density complete asper technical specifications (withoutscreening for low volume Roads/undersignedRoads) |
| 6 | .Providing and laying surface dressing in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG-10 @ 1kg per sqm laid on prepared surface after cleaning the road surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications |
| 7 | Providing and applying tack coat with penetrationgrade bitumen VG-10 using bitumen pressuredistributor at the rate of 0.40 kg per sqm on theprepared bituminous surface/granular surfacetreated with prime coat after cleaning the surfacecomplete as per technical specifications |
| 8 | Providing, laying and compaction of open - gradedpremix surfacing of 20 mm thickness consisting ofcrushed stone aggregates of specified gradingpremixed in a Continuous type hot mix plant withbituminous binder VG-10 @ 1.46kg per sqm, laidwith Paver Finisher Mechanical and rolling with asmooth wheeled roller 8-10 tonne capacity,finished to required level and grades complete asper technical clause 510 of MORT&Hspecifications |
| 9 | Providing and laying of premix sand seal coatpremixed in Continuous type hot mix plant usingspecified fine aggregates and penetration gradebitumen VG-10 @ 0.68kg per sqm, laid to thespecified levels, grade and cross fall complete asper technical clause 511 of MORT&Hspecifications |
| 10 | Dressing of Earth work complete as per PWD Specificaitons |
| 11 | Construction of 450 mm dia Hume Pipe Culvert as per PWD Specifications |
| 12 | Reinforced cement concrete M-15 grade Km. stone of standard design for Village Roads as per IRC :8/1980 Fixing in Position including Painting & Printing etc. complete as per technical Clause 804 of MIRTH Specifications |
| 13 | Reinforced cement concrete M-15 grade village board of standard design fixing in position including painting and printing etc. complete as per PWD specifications |
| 14 | Reinforced cement concrete M-15 grade Boundary pillerof standard design for Boundary Piller as per I RC 25-1967 Fixing in Position including Painting & Printing etc. complete as per tdchnical Clause 806 of MIRTH Specifications |
| 15 | Videography of Proposed/Execute site of work of Link Roads before & after completion of work two times (stilling & video Job Work) |
| 16 | Add extra cost of Cutlural Cess @ 1% on Total costas items mentioned above on 1 to 1.15 |