Environmental Base Line Data Generation For One Season Non Monsoon In Respect Of Group Iii Socio Economic Study And Occupational Health Survey For 14 Projects Of Central Coalfields Limited. Environmental Base Line Data Generation For One Season N
Tender Overview
Project Description
Environmental Base Line Data Generation For One Season Non Monsoon In Respect Of Group Iii Socio Economic Study And Occupational Health Survey For 14 Projects Of Central Coalfields Limited. Environmental Base Line Data Generation For One Season Non Monsoon In Respect Of Group Iii Socio Economic Study And Occupational Health Survey For 14 Projects Of Central Coalfields Limited.
BOQ
| Sl. No. | Item Description |
| 1 | Socio-Economic Study & Occupational Health Survey |
| 2 | Conducting Socio-economic study and preparation of report covering the study area as per the instruction of Engineer-In-charge, based on the latest Census report and validated by sample household survey of 250 houses. The house hold survey data sheets should also be included in the report. The information provided in the report should include the following. a) Social Profile• Total population with breakup including male-female & SC-ST• Literacy level of both male and female separately• Household size (average)b) Economic• Occupational structure• Land use patterni. Core Zone – Land use details in core zone showing type of land (Agricultural (Irrigated / un-irrigated), forest, Govt.)ii. Buffer Zone – Land use details in buffer zone.c) Infrastructure facilities• Source of water supply• Educational Institutesd) Occupational Health Survey.e) Occurrence of any historical/archaeological sites in the core and buffer zonef) Number and names of villages falling within the study area in atabular form (i) in the Core zone, (ii) Buffer zone; a) In area covering 500m from the quarry edge of OCM, b) Township & c) remaining part ofbuffer zone (excluding a &b)g) Details of villages in the Core zone giving the following information in a tabular form (i) village name, ii) Population (Tribal and others), iii) List of villages shouldinclude amenities available to each village. h) Household survey data sheet of 250 houses. The household survey should include average annual income per family with breakup of source of income including primary, secondary and tertiary source of income.All inclusive as per direction of Engineer-In charge. |
| 3 | Total impact of GST for the purpose of CTC |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender