| 1 | OB Removal: (A) Soft Soil(Not Requiring Drilling)& (C) RH (Not Requiring Drilling) |
| 2 | A1 Lead Slab 1-2 Km, Total Qty. 14,74,712 Cum ;Route1-DumpNo (2);Qty 14,74,712 Cum C1 Lead Slab 1-2 Km, Total Qty: 6,06,769 Cum;Route1-Dump No (2)Qty 6,06,769 Cum |
| 3 | A2 Lead Slab 2-3 Km, Total Qty. 8,51,897Cum;Route1-Dump No(2); Qty:8,51,897 Cum, |
| 4 | OB Removal:(B) Hard Soil(Requiring Drilling) |
| 5 | B1 Lead Slab 0-1 Km, Total Qty: 90,07,118 Cum: Route2-DumpNo (5);Qty:1,23,024 Cum, Route4-DumpNo(4); Qty:88,84,094 Cum, |
| 6 | B2 Lead Slab 1-2 Km, Total Qty: 1,12,23,679Cum: Route 2-Dump No (5);Qty. 99,431 Cum, Route3-DumpNo(1); Qty:12,40,112 Cum,Route4-DumpNo(4); Qty:98,84,136 Cum, |
| 7 | B3 Lead Slab2-3Km, Qty:1,16,05,987 Cum ;Route3-DumpNo(1); Qty:17,45,107 Cum, Route4-DumpNo(4); Qty:98,60,880 Cum |
| 8 | B4 Lead Slab 3-4 Km, Total Qty. 25,28,128Cum ;Route3-Dump No(1); Qty:3,41,990 Cum,Route4-Dump No(4); Qty:21,86,138 Cum |
| 9 | Total impact of GST for the purpose of CTC |