| 1 | Earth work in all kinds of soilintial led and 1.5m intial lead and 1.5 m intial lift including rough dressing and breaking clods to 5cm 7cmand laying in layers not exceeding0.3 m depth as per spection approved by department etc. complete as desired by the Engineer-in-charge. |
| 2 | Supplying, filling in foundation and plinth with sand including watering ramming cost conveyance, royalties and taxes of all materials and cost of labour with T&P required for the work etc. complete (measurement will be taken on finished compacted section only)including cost, conveyance, taxes,cess, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge |
| 3 | Cement concrete (1:3:6)usingblack hard crusher broken granite chips of approved quality and from approved quarry watering and curring etc.complete including side shuttering cost conveyance taxes and royalities of all materials and labour with T&P required for the work etc.complete in all respect. |
| 4 | Fly ash brick .brick using 9” size masonry in cement mortar (1:6) in foundations, plinth & basement and for ornamental flower beds Plinth moulding and similar such type of works with all necessary projections, cutting moulding, corbelling, champering, watering and curing etc .including cost conveyance royalties and taxes of all materials and cost of all labour with (T&P) required for the work etc. complete. |
| 5 | Fly ash brick .brick using 9” size masonry in cement mortar (1:6) inSuper structure and similar such type of works with all necessary projections, cutting moulding, corbelling, champering, watering and curing etc .including cost conveyance royalties and taxes of all materials and cost of all labour with (T&P) required for the work etc. complete. |
| 6 | R.C.C. work of grade M-20) in coloum,footing, in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 & I.S. 516 using 12mmof approved quality and from approved quarry including hoisting, lowering laying and compacting concrete watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessary including cost, conveyance and royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S. rods or Tor steel and binding wires and labour charges for bending binding and tying the grills. |
| 7 | R.C.C. work of grade M-20) in Plinth beam, in 15cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 & I.S. 516 using 12mmof approved quality and from approved quarry including hoisting, lowering laying and compacting concrete watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beads where ever necessary including cost, conveyance and royalties and taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of M.S. rods or Tor steel and binding wires and labour charges for bending binding and tying the grills. |
| 8 | Cutting, straightening coiled or bent up HYSDbar rainforcementl bending binding welding and joining if necessary and laying the grills and placing in position as required for R.C.C work and for providing Fan hooks hoisting lowering and laying including cost, conveyance and taxes of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work for bending binding and tying the grills in all floors (payment will be made on weight of M.S. rods andtowards the weight of binding wires). |
| 9 | 12mm.(1/2”)thick cement plaster (1:6 )with neat cement punning in dados & skirting in all floors finished smoothincluding watering & curing complete with cost conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc. complete. |