}

Bids Are Invited For Supply Of 120W Flp Led Light - Supply Of The Flp (Ex-D Gas Group Iia, Iib) And Wp Light Fittings Including Lamps. Lamps Should Be Supplied Along With Fittings. All Fittings Shall Be Approved By Cmri/ Peso With Numbers Embossed On The -Punjab

Ministry Of Petroleum And Natural Gas-MOPNG has published Bids Are Invited For Supply Of 120W Flp Led Light - Supply Of The Flp (Ex-D Gas Group Iia, Iib) And Wp Light Fittings Including Lamps. Lamps Should Be Supplied Along With Fittings. All Fittings Shall Be Approved By Cmri/ Peso With Numbers Embossed On The . Submission Date for this Tender is 30-11-2021. Garden Tools Tenders in Punjab. Bidders can get complete Tender details and download the document.




Tender Notice

29841268
Bids Are Invited For Supply Of 120W Flp Led Light - Supply Of The Flp (Ex-D Gas Group Iia, Iib) And Wp Light Fittings Including Lamps. Lamps Should Be Supplied Along With Fittings. All Fittings Shall Be Approved By Cmri/ Peso With Numbers Embossed On The
Open Tender
Indian
Punjab
30-11-2021

Tender Details

Bids Are Invited For Supply Of 120W Flp Led Light - Supply Of The Flp (Ex-D Gas Group Iia, Iib) And Wp Light Fittings Including Lamps. Lamps Should Be Supplied Along With Fittings. All Fittings Shall Be Approved By Cmri/ Peso With Numbers Embossed On The Equipment And Certificates Should Be Supplied Along With The Equipment. Technical Data Sheet For Flp Light Fixtures:-• Construction: Cast Aluminium Alloy Lm-6.• Type Of Enclosure: Ex’D’. Zone-1/2.• Area Classification: Gas Group Iia/Iib.• Protection: Ip-66.• Temperature Class: T-6.• Led Make: Lumiled (Philips)/Osram/Equi., Driver Make: Philips/Osram/Equi.• Transparent Part: Clear Toughened Glass Dome.• Gasket: Endless Moulded Neoprene Rubber.• Wire Guard: Ms. Duly Galvanised/Epoxy Powder Coated.• Cable Entry: 2 Nos. 3/4 Et (Female).• Earthing: 1 No. Inside & 2 Nos. Outside.• Finishing: Epoxy Coated, As Per Shade 632 Of Is-5.• Hardware: Ss. Hardware. (Earthing, Body & Glass Ring Jointing)• Hinge Arrangement: “J” Type Hook, Ms. Duly Galvanised/Epoxy Powder Coated. , Supply Of 2X2 Recess Mounting Led Downlighty 36W Square Type (False Ceiling) - Supply Of Non Flp Light Fittings. Fitting Should Be Of Recommended Brand As Per Bpcl List And Equivalent Fittings Shall Be Ordered By Vendor After Prior Approval By Engineer- In - Charge. All Fittings Are Led/ Normal Type And Lamps Should Be Included In The Item Along With Required Ballast/ Choke/ Starter/ Electronic Accessories Like Smps Supply, Constant Current Dc Supplies/ Cg Box Etc. , Supply Of 2X2 Surface Mounting Led Downlighty 36W Square Type. - Supply Of Non Flp Light Fittings. Fitting Should Be Of Recommended Brand As Per Bpcl List And Equivalent Fittings Shall Be Ordered By Vendor After Prior Approval By Engineer- In - Charge. All Fittings Are Led/ Normal Type And Lamps Should Be Included In The Item Along With Required Ballast/ Choke/ Starter/ Electronic Accessories Like Smps Supply, Constant Current Dc Supplies/ Cg Box Etc. , Supply Of 200W Flood Light - Supply Of High Mast Lumnaires Of Approved Makes And Attached Specifications. Make Shall Be Bajaj, Havells, Philips, Crompton Greaves Or Equivalent Make Approved By Bpcl 200 Watt Led Luminaires Incl. Drivers, All Complete Fitting, Housing Etc Of Ip65 Protection. , Supply Of 3 Core X2.5 Mm Sq 2Xwy. - Cables :Supplying Of 1.1 Kv Grade Cables ; Pvc/Xlpe Insulated; Pvc Sheathed; Frlsarmored Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), Is 7098 Part I & Is 1225-Latest Versionprocedure For Laying Of Lt Cables. Makes/Specifications3 Core X2.5 Mm Sq 2Xwy. , Installation Of Flp Light Fittings - Installation, Testing And Commissioning Of The Flp And Wp Light Fittings Including Lamps With Minor Grouting, Fasteners On Structures And Readymade Mounted Poles. The Job Includes Connection, Armored Cable And Supply Of All Hardware Required For The Installation Of Lighting Fixture. Cable Termination And Connection, Supply And Fixing Of Cable Glands With Lugs, Ferrules As Required Including All Materials, Labors Complete. Making Dual Earth Connections On The Light Fitting.Job Also Includes The Removal Of Existing Light Fixture And Properly Stacking It On Place As Designated By The Officer In-Charge.Use Of Sky Lift/Man Lift Or Any Other Industrial Ladder For The Installation Of The Lights Fixture Will Be In The Scope Of Vendor.Structural Steel And Poles (If Required) Would Be Paid In Other Items Of Boq (Bpcl’S Scope). , Installation Of Led Panel Light - Installation, Testing And Commissioning Of The Light Fittings Including Lamps With Minor Grouting, Fasteners On Structures And Readymade Mounted Poles. The Job Includes Connection,Cable And Supply Of All Hardware Required For The Installation Of Lighting Fixture. Cable Termination And Connection, Supply And Fixing Of Cable Glands With Lugs, Ferrules As Required Including All Materials, Labors Complete. Making Dual Earth Connections On The Light Fitting.Job Also Includes The Removal Of Existing Light Fixture And Properly Stacking It On Place As Designated By The Officer In-Charge.Use Of Sky Lift/Man Lift Or Any Other Industrial Ladder For The Installation Of The Lights Fixture Will Be In The Scope Of Vendor. , Installation Of Flood Lights - Installation, Testing And Commissioning Of The Wp Light Fittings Including Lamps With Minor Grouting, Fasteners On Structures And Readymade Mounted Poles. The Job Includes Connection, Armored Cable And Supply Of All Hardware Required For The Installation Of Lighting Fixture. Cable Termination And Connection, Supply And Fixing Of Cable Glands With Lugs, Ferrules As Required Including All Materials, Labors Complete. Job Also Includes The Removal Of Existing Light Fixture And Properly Stacking It On Place As Designated By The Officer In-Charge.Making Dual Earth Connections On The Light Fitting.Use Of Sky Lift/Man Lift Or Any Other Industrial Ladder For The Installation Of The Lights Fixture Will Be In The Scope Of Vendor.Structural Steel And Poles (If Required) Would Be Paid In Other Items Of Boq. , Laying Of 3 Core X2.5 Mm Sq 2Xwy. - Cables :Laying; Testing And Commissioning Of 1.1 Kv Grade Cables ; Pvc/Xlpe Insulated; Pvc Sheathed; Frlsarmored Copper Conductor Cables Of Following Sizes As Per Is:1554 (Part-I), Is 7098 Part I & Is 1225-Latest Versionand Sealed Properly With Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable Trays; Pull Through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beam Or Embedded Infloor Or Buried Directly Underground Or Through G. I.Pipe.Unit Rates Quoted For Installation Of Cables Shall Be Same Irrespective Of Route And Method Of Laying. The Rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables On Cable Trays, Racks, Vertical Raceways And Supply And Installation Of Saddles, Spacers And Nylon Chord For Tying As Required, Identification Tags At Strategic Points/ Every 50 Meter Intervales, Aluminium Clamps. Etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete. The Straight Through Joints/ Tying With Armour In The Cables Should Be Avoided.Procedure For Laying Of Lt Cables. Makes/Specifications3 Core X2.5 Mm Sq 2Xwy. Total Quantity : 1

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 23.82 Lakhs /-

BOQ Items

Sl. No. Item TitleItem Description
1SUPPLY OF 120W FLP LED LIGHTSupply of the FLP (Ex-d Gas Group IIA, IIB) and WP light fittings including lamps. Lamps should be supplied along with fittings. All fittings shall be approved by CMRI/ PESO with numbers embossed on the equipment and certificates should be supplied along with the equipment. TECHNICAL DATA SHEET FOR FLP LIGHT FIXTURES:- • CONSTRUCTION: CAST ALUMINIUM ALLOY LM-6. • TYPE OF ENCLOSURE: Ex’d’. ZONE-1/2. • AREA CLASSIFICATION: GAS GROUP IIA/IIB. • PROTECTION: IP-66. • TEMPERATURE CLASS: T-6. • LED MAKE: LUMILED (PHILIPS)/OSRAM/EQUI., DRIVER MAKE: PHILIPS/OSRAM/EQUI. • TRANSPARENT PART: CLEAR TOUGHENED GLASS DOME. • GASKET: ENDLESS MOULDED NEOPRENE RUBBER. • WIRE GUARD: MS. DULY GALVANISED/EPOXY POWDER COATED. • CABLE ENTRY: 2 NOS. 3/4" ET (Female). • EARTHING: 1 NO. INSIDE & 2 NOS. OUTSIDE. • FINISHING: EPOXY COATED, AS PER SHADE 632 OF IS-5. • HARDWARE: SS. HARDWARE. (EARTHING, BODY & GLASS RING JOINTING) • HINGE ARRANGEMENT: “J” TYPE HOOK, MS. DULY GALVANISED/EPOXY POWDER COATED.
2SUPPLY OF 2"X2" RECESS MOUNTING LED DOWNLIGHTY 36W SQUARE TYPE (FALSE CEILING)Supply of NON FLP light fittings. Fitting should be of recommended brand as per BPCL List and equivalent fittings shall be ordered by vendor after prior approval by Engineer- in - charge. All fittings are LED/ Normal type and lamps should be included in the item along with required ballast/ choke/ starter/ Electronic accessories like SMPS supply, constant current DC supplies/ CG box etc.
3SUPPLY OF 2"X2" SURFACE MOUNTING LED DOWNLIGHTY 36W SQUARE TYPE.Supply of NON FLP light fittings. Fitting should be of recommended brand as per BPCL List and equivalent fittings shall be ordered by vendor after prior approval by Engineer- in - charge. All fittings are LED/ Normal type and lamps should be included in the item along with required ballast/ choke/ starter/ Electronic accessories like SMPS supply, constant current DC supplies/ CG box etc.
4SUPPLY OF 200W FLOOD LIGHTSupply of High Mast LUMNAIRES of approved makes and attached specifications. Make shall be Bajaj, Havells, Philips, Crompton Greaves or equivalent make approved by BPCL 200 Watt LED luminaires incl. drivers, all complete fitting, housing etc of IP65 protection.
5SUPPLY OF 3 CORE X2.5 MM SQ 2XWY.""Cables :Supplying Of 1.1 Kv Grade Cables ; Pvc/XLPE insulated; Pvc Sheathed; FRLSArmored copper Conductor Cables of Following Sizes As Per Is:1554 (Part-I), IS 7098 Part I & IS 1225-Latest Version Procedure for laying of LT cables. MAKES/SPECIFICATIONS 3 CORE x2.5 MM SQ 2XWY."
6INSTALLATION OF FLP LIGHT FITTINGSInstallation, testing and commissioning of the FLP and WP light fittings including lamps with minor grouting, fasteners on structures and readymade mounted poles. The job includes connection, armored cable and supply of all hardware required for the installation of lighting fixture. Cable termination and connection, supply and fixing of cable glands with lugs, ferrules as required including all materials, labors complete. Making dual earth connections on the light fitting. Job also includes the removal of existing light fixture and properly stacking it on place as designated by the officer in-charge. Use of sky lift/man lift or any other industrial ladder for the installation of the lights fixture will be in the scope of vendor. Structural steel and poles (if required) would be paid in other items of BOQ (BPCL’S scope).
7INSTALLATION OF LED PANEL LIGHTInstallation, testing and commissioning of the Light fittings including lamps with minor grouting, fasteners on structures and readymade mounted poles. The job includes connection,cable and supply of all hardware required for the installation of lighting fixture. Cable termination and connection, supply and fixing of cable glands with lugs, ferrules as required including all materials, labors complete. Making dual earth connections on the light fitting. Job also includes the removal of existing light fixture and properly stacking it on place as designated by the officer in-charge. Use of sky lift/man lift or any other industrial ladder for the installation of the lights fixture will be in the scope of vendor.
8INSTALLATION OF FLOOD LIGHTSInstallation, testing and commissioning of the WP light fittings including lamps with minor grouting, fasteners on structures and readymade mounted poles. The job includes connection, armored cable and supply of all hardware required for the installation of lighting fixture. Cable termination and connection, supply and fixing of cable glands with lugs, ferrules as required including all materials, labors complete. Job also includes the removal of existing light fixture and properly stacking it on place as designated by the officer in-charge. Making dual earth connections on the light fitting. Use of sky lift/man lift or any other industrial ladder for the installation of the lights fixture will be in the scope of vendor. Structural steel and poles (if required) would be paid in other items of BOQ.
9LAYING OF 3 CORE X2.5 MM SQ 2XWY.""Cables :Laying; Testing and Commissioning Of 1.1 Kv Grade Cables ; Pvc/XLPE insulated; Pvc Sheathed; FRLSArmored copper Conductor Cables of Following Sizes As Per Is:1554 (Part-I), IS 7098 Part I & IS 1225-Latest Versionand Sealed properly with Pvc Caps In Built-Up Ready Made Trenches; Overhead Cable trays; Pull through Pipes Or Exposed On Wall .Beam/Rakes; Trusses Tie/Beam or Embedded InFloor Or buried Directly Underground Or Through G. I.Pipe.Unit Rates Quoted For Installation of Cables Shall Be Same Irrespective Of Route and Method Of Laying. The rates Shall Include Laying, Pulling Of Cables, Proper Dressing Of Cables on Cable Trays, Racks, Vertical Raceways and Supply and Installation Of saddles, Spacers and Nylon Chord For Tying As Required, Identification Tags At Strategic Points/ Every 50 Meter Intervales, aluminium Clamps. etc. Cable Identification Tags At Strategic Points/ Every 50 Meter Interval For Identification Of Cable; Etc. Complete. The Straight Through Joints/ tying with armour In The Cables Should Be avoided. Procedure for laying of LT cables. MAKES/SPECIFICATIONS 3 CORE x2.5 MM SQ 2XWY."
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail