Urban Development Department-UDD has published Plantation Work With Gabion And Fencing In Various Locations And Footpaths Under J. N.A.C. Jamshedpur Distt. East. Singhbhum. . Submission Date for this Tender is 30-11-2021. Footpath Work Tenders in Jamshedpur Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | First Year :- Fencing Work Bamboo stalks - 04 nos. each @ 80.00 including freight |
2 | Construction of Bamboo trellis |
3 | Painting bamboo stalks with coal tar/black japan/black paint |
4 | Painting trelli units with green and red paint |
5 | Soil levelling for gabion installation. Digging 04 pits for each unit with size 1"x1"x1"-6", alongwith accumulation of the excavated soil. |
6 | Installation of stalks alongwith trellis - 04 stalks - 29 stalks per manday |
7 | For trellis :-1. wire - 100 gm (Rs. 67 per kg) |
8 | 2. nails - 300 gm (Rs. 69 per kg) |
9 | Earth work : Digging of pits 2"x2"x2" alongwith accumulation of excavated soil |
10 | Plant cost with provision of 20% extra plants for replacement of dead plants alongwith carriage/unloading of plants |
11 | sign board and gabion numbering |
12 | GPS photograph |
13 | Maintainance/plantation works 2nd year :- Procuring sand/manure with mixture preparation(sand and vermicompost) for pit filling |
14 | Plantation (DAP - 50 gm and insecticide - 4 gm) |
15 | 3 times Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide) Roger spray in leaves, replacement of dead plants |
16 | Watering ( through rickshaw/trolley) |
17 | Watch and Ward |
18 | GPS photograph |
19 | Maintenance (3rd year):- Weeding and hoeing (1st - 5 gm urea, 5 gm inseticide; 2nd - 10 gm urea, 5 gm insecticide; 3rd - 5 gm urea, 5 gm insecticide) |
20 | Watering ( through rickshaw/trolley) |
21 | Watch and Ward/repairing of gabions |
22 | GPS photograph |
23 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item - A) and disposal ofexcavated earth as obtained to a distance upto 50 M. including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design building specification and direction of E/I. |
24 | Providing coarse clean local sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per buiding specification and direction of E/I.(Mode of measurement compacted volume) |
25 | Providing designation 75 B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/l. 1:2:4 (1 cement : 2 coarse sand (zone-lll) :4 gradde stone aggregate 40 mm nominal size) |
26 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 cement :1.5 coarse sand (zone-lll) :3 gradde stone aggregate 20 mm nominal size) |
27 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. |
28 | Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire |
29 | Labour for fitting and fixing barbed wire fencing in four rows horizontal upto a height of 1.85M. and two diagonals including fixing of post in cement concrete at 2.5M centres including cost of staples (but excluding the cost of cement concrete angle iron post, its cutting and making holes, nuts and bolts) all complete as per building specifications and direction of E/l. |
30 | Carriage Cost of Cement |
31 | Carriage Cost of Sand |
32 | Carriage Cost of Stone Chips |
33 | Carriage Cost of Bricks |
34 | Total |
35 | Add GST @ 12% |
36 | Total |
37 | Add Labour Cess @ 1% |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy