| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 80% Qty. in A.k.S.& 20% Qty. in ordinary rock including all leads, lifts and carriage complete |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lifts and carriage complete |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all leads, lifts and carriage complete |
| 4 | Dumping of Stones including cost of stones including all leads, lifts and carriage complete |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all leads, lifts and carriage complete |
| 7 | Centering and shuttering including strutting, propping etc and removal of the formwork. Foundation Footing,Base of Columns etcincluding all leads, lifts and carriage complete |
| 8 | Centering and shuttering including strutting, propping etc and removal of the formwork. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.including all leads, lifts and carriage complete |
| 9 | Centering and shuttering including strutting, propping etc and removal of the formwork Suspended Floor, Roofs ,Landing,etcincluding all leads, lifts and carriage complete |
| 10 | Centring and shuttering including strutting, propping etc and removal of the formworkEdges of slab including all leads, lifts and carriage complete |
| 11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 mincluding all leads, lifts and carriage complete |