| 1 | Supply Parts |
| 2 | Tower Accessories for ACSR Panther Conductor |
| 3 | Number board |
| 4 | Danger board |
| 5 | Phase plate |
| 6 | Bird Guard |
| 7 | Earthing Material |
| 8 | Conductor Accessories for ACSR Panther Conductor |
| 9 | Vibration damper |
| 10 | MS joint |
| 11 | Repairing sleeve and other items |
| 12 | Hardware and insulator for ACSR Panther Conductor |
| 13 | Single tension fitting |
| 14 | Double tension fitting |
| 15 | Insulator 120 K.N. |
| 16 | Following works will be carries out for the completion of construction works of 132 KV Narainpur LILO line. |
| 17 | Sorting, counting, shifting to leading point on vehicle of 01 no. complete 132 KV tower in their own risk by taking over from the substation/store from anywhere nearby within 200km from 220 KV Substation Sahupuri under and then carriage of the above tower parts to any store under ETD-III, Sahupuri and unloading of the same by sorting, counting, stacking. All cost of men, T&P, vehicle will be provided by the contractor. |
| 18 | Detailssurvey and profiling between loc no. 01 to 03, the job includes the work of peg marking of location in route length, preparation of tower schedule and plotting of towers, sag curve on good quality tracing paper. |
| 19 | Check survey and final peg marking between location no. 77 to 90 route length. |
| 20 | Cost of excavation of 132 KV tower foundation pits including all earth work, back filling and leveling etc. |
| 21 | Setting of stub including all foundation work but excluding the cost of concreting and excavation. |
| 22 | Cost of concreting for all types of 132 KV towers including cost of all material, dewatering shorting and shuttering, boring, curing, backfilling etc. R.C.C. 1:2:4. |
| 23 | Cost of reinforcement of steel bars in R.C.C. foundation including cutting and bending etc. |
| 24 | Erection of super structureof 132 KV DB+5 type tower including all work above ground level, fitting of danger plate, number plate, phase plate, bird guard etc including shifting of tower parts and accessories from store to site. |
| 25 | Tack welding of all the bolts upto the height of one section or 5 meter whichever is more of tower as per technical specification. |
| 26 | Laying, stringing, tensioning, clamping, jointing etc. ACSR panther conductor including hoisting of insulators, fittings of all necessary hardwares and all accessories on all six phase of 132 KV D.C. line including shifting of all these materials from store to site. |
| 27 | Earthing of towers including earth work for pipe type grounding including cost of all material. |