| 1 | Disconnection of existing cables from the VCB panel and Reconnection the same after completion of installation work. Dismantle old VCB panel at various substation and accessories shall be handed over to RSA yard / Power supply section by the contractor including engaging man power and transport charges. |
| 2 | Supply of 11 KV, 630A, 25KA, 3 Phase 50 HZ , C.T. 300/1/1 as Incomer VCB with panel at A, C and CB - substation as per Technical specification schedule ‘A’. |
| 3 | Installation of11 KV, 630A, 25KA, 3 Phase 50 HZ Incomer VCB with panel at A, C and CB - substation as per Technical specification schedule ‘A’ |
| 4 | Supply of 11 KV, 630A, 25KA, 3 Phase 50 HZC.T. 100/1/1 Outgoingfeeder VCB with panel at C and CB substation as per Technical specification schedule ‘A’ |
| 5 | Installation of 11 KV, 630A, 25KA, 3 Phase 50 HZ Outgoing VCB with panel at C and CB substation as per Technical specification schedule ‘A’ |
| 6 | Supply of 11 KV, 630A, 25KA, 3 Phase 50 HZ Bus coupler including suitable adopter box of VCB with panel at C and CB substation as per Technical specification schedule ‘A’. |
| 7 | Installation of 11 KV, 630A, 25KA, 3 Phase 50 HZ Bus coupler VCB with panel with adopter box at C and CB substation as per Technical specification schedule ‘A’. |
| 8 | Supply of Indoor type heat shrinkable End termination kit for H.T. 11KV, 3X185 sq. mm. XLPE UG Aluminium Cables. |
| 9 | Installation of Indoor type heat shrinkable End termination kit for H.T. 11KV, 3X185 sq. mm. XLPE UG Aluminium Cables. |
| 10 | Supply of Indoor type heat shrinkable End termination kit for H.T. 11KV, 3X240 sq. mm. XLPE UG Aluminium Cables. |
| 11 | Installation of Indoor type heat shrinkable End termination kit for H.T. 11KV, 3X240 sq. mm. XLPE UG Aluminium Cables. |
| 12 | Supply of. self-fusing11 KV H.T insulation tape |
| 13 | Supply of following electrical materials and accessories as per IER(i) 11 KV grade rubber hand gloves |
| 14 | (ii) First aid box |
| 15 | (iii) Shock treatment chart and safety rules installation with suspension clamp and front clear plastic sheet lamination. |
| 16 | Testing and commissioning of VCB panels and submitTest Report. |
| 17 | Supply of 6 mm. M.S. checker plate of suitable size as per requirements to be placed on the cable trenches at various – substationas per Technical specification schedule ‘A’. |
| 18 | Installation and Placing of 6 mm. M.S. checker plate of suitable size as per requirements to be placed on the cable trenches at various – substationas per Technical specification schedule ‘A’. |
| 19 | b) Installation |