|
| 1 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee :Rs. 91.25 per Cum(b) For Non-Forest area Royalty: Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .Comprising Boulder above 30kg each 60% + Boulder above 20kg each 30% + Boulder above 10kg each 10% |
| 2 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee :Rs. 91.25 per Cum(b) For Non-Forest area Royalty: Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .Boulder above 20 kg each |
| 3 | Making rectangular/circular sausage cage with 10 SWG galvanized iron wire of 150 mm.x150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG GI wire and supply of all materials and equipments including placing the sausage cage inposition, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder/lump aggregates and its carriage up to site.(Cost is excluding the cost of end pieces)a) 1.50 metre diameter |
| 4 | Supplying, fitting, fixing end pieces for rectangular/square/circular sausages at the ends, with 10 SWG/8SWG GI wire net of different mesh sizes tying & sewing the same maintaining a lap length of 150mm all around with 12 SWGGI wire complete, including the cost of supply of wire netting, fitting etc, complete as per direction of the Engineer-in-charge.a) Mesh size 150 mm X 150 mm with 10 SWG wire |
| 5 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulder in apron or within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee :Rs. 91.25 per Cum(b) For Non-Forest area Royalty: Rs. 53.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .Comprising Boulder above 30kg each 60% + Boulder above 20kg each 40% |
| 6 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge.a) Mesh size 150 mm x 150 mm with 10 SWG wire |
| 7 | Labour charges for constructing sausage crates with 8 Guage/ 10 Guage dia. G.I. wirenetting of different shapes and sizes in embankment, apron, slope etc. including binding with 12 S.W.G., G.I. wire and tied at required interval as per direction of Engineer-in-Charge (rate excludes cost of wirenet and laying of boulders but includes cost of binding wire). |