| 1 | M.R. items |
| 2 | NS-1 S/E of PCC poles 9 Meter long complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 3 | NS-2 S/E of PCC poles 11 Meter long complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 4 | NS-3 Supply and erection of Stay sets 8\" long complete with MS X-Plate 460 mm angle 65x65x6 Elbow and rod Wt. 13.80 Kg complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. |
| 5 | NS-4 Pdg. & fixing of stay wire 7/8 SWG complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. |
| 6 | NS-5 Supply & erection of GSL 8 SWG conforming to ISS 280/1975 / 1963 with latest amendment complete in all respect upto the entire satisfaction of Engineer-in-Charge of the work. |
| 7 | NS-6 Providing and fixing Nut & Bolt of size as per specification of Engineer-in-Charge. |
| 8 | NS-7 Supply and erection of 11 KV pin insulator (Jayshree make) with pin with all labour and material required to complete the job included the fixing the same on existing channels upto entire satisfaction of Engineer-in-Charge of the work. |
| 9 | NS-8 S/E of Transformer platform GI complete Wt. 69 complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 10 | NS-9 S/E of 11 KV 400 Amp GO switch complete with handle , pipe an supporting channel as per DHBVN specifications for 11 Mtr pole complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 11 | NS-10 S/E of GI channel75x40x6mm (ISMC-75) 2200 mm for fuse unit Wt. 15.708 Kg complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 12 | NS-11 Supply and erection of 50mm2 SWG ACSR conductor wire with accessories including stringing and sagging of conductor of various sizes as well as jointing and biding with insulator at supports complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. |
| 13 | NS-12 S/E of G.I. Channel of 100x50x6 mm2200 sq mm Wt. 21.032 KG for H pole size using SAIL or TATA make complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 14 | NS-13 S/E of G.I. Channel of 75x40x6 mmsize using SAIL or TATA make complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 15 | NS-14 S/E of G.I. Angle of 50x50x6 mm size using SAIL or TATA make complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 16 | NS-15 S/E of G.I. Flat 50x6 mm for cantilever SAIL or TATA make complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 17 | NS-16 S/E Aluminium Thimble complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 18 | NS-17 S/E of G.I. Strip 25x6 mm 9 mtr. For earthing Wt. 10.80 Kg (TATA/SAIL) make complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 19 | NS-18 S/E of G.I. pipe 40 mm dia 6 mtr. long For earthing set B-Class complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 20 | NS-19 S/E of LT Fuse unit board complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 21 | NS-20 S/E of XLPE cable 3 C 185 mm sq complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 22 | NS-21 S/E of LT PVC Cable single Core 185 mm sq complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 23 | NS-22 S/E of LT PVC Cable single Core 300 mm sq complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 24 | NS-23 S/E of LT armoured XLPE Cable 3.5 Core 120 mm sq complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 25 | NS-24 S/E of OG 11 KV XLPE U/G Heat shrinkable Cable Box 3Cx185 mm complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 26 | NS-25 S/E of lightning arrestor 9 KV complete in all respect up to the entire satisfaction of the Engineer-in-Charge of the works. |
| 27 | NS-26 Wooden clit for hold 11 KV XLPE Cable |
| 28 | NS-27 Dismantling of 09 Mtr PCC Poles |
| 29 | NS-28 Dismantling ofH Pole structure with 2 Stay |
| 30 | NS-29 Dismantling ofACSR 20/30 mm sq |
| 31 | NS-30 Dismantling of200 KVA pole mounted T/F |
| 32 | NS-31 Dismantling of 100 KVA pole mounted T/F |
| 33 | NS-32 Dismantling of63 KVA pole mounted T/F |
| 34 | NS-33 Dismantling of 25 KVA pole mounted T/F |
| 35 | NS-34 Erection of H Pole structure with 2 Stay |
| 36 | NS-35 Erection ofRDFuse Unit |
| 37 | NS-36 Erection of 200 KVA pole mounted T/F |
| 38 | NS-37 Erection of 100 KVA pole mounted T/F |
| 39 | NS-38 Erection of 63 KVA pole mounted T/F |
| 40 | NS-39 Erection of 25 KVA pole mounted T/F |
| 41 | Special Note:- Non availability certificate from UHBVNL authority will be taken by the contractor and same shall be submitted to Electrical Division, PWD B&R Br., Rohtak before executing the work. |