| 1 | Rising main - Providing and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 /14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i. e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.90 mm dia 6kg/cm2 |
| 2 | Providing and supplying ISI standard PVC specials & fittings including cost of all labours and materialsandtransportation to stores / site, loading , unloading including all taxes , etc. complete. |
| 3 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift0.00 to 1.50 M. |
| 4 | Excavation for foundation / pipe trenches in hard murumincluding removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift0.00 to 1.50 M. |
| 5 | Excavation for foundation / pipe trenches in aodtrock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift0.00 to 1.50 M. |
| 6 | Excavation for foundation / pipe trenches in hardrock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift0.00 to 1.50 M. |
| 7 | Filling in plinth and floors / trenches with contractor’s murum for bedding in 15cm to 20cm layers including watering and compaction complete. |
| 8 | Lowering, Laying and Jointing PVCpipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II 140 mm dia. HDPE (PE100) 8Kg/sqcm |
| 9 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm.layers with all leads and lifts including consolidation,surcharging,etc.complete |
| 10 | Elevated Stotage Reservior 25000 Ltr - Designing (aesthetically), and constructing RCC elevated service reservoirs of following capacity with RCC staging consisting of columns, internal and external bracings spaced vertically not more than 4.5 meters centre to centre for E.S.R. having capacity 500 m3 & not more than 6 m c/cfor E.S.R.having capacity above 500 m3 including excavation in all types of strata, foundation concret, cement plaster with water proofing compound to the inside face of the container including refilling disposing of the surplus stuff within a lead of 50 meters, all labour and material chargesincluding lowering, laying, erecting, hoisting and jointing of pipe assembly of inlet, outlet, washout, overflow and bypass arrangements as per departmental design. 12 Mtrs. Staging height and SBC 10MT |
| 11 | Providing and supplying ISI standard welded DI double flanged pipe excluding GST levied by GOI & GOM in all respect but including railway freight, insurance, unloading from railway wagon, loading into truck transport to store, unloading, stacking etc. complete as directed by Engineer -in- charge. (for 2.75 m bare pipe)Providing D.I D/F pipes |
| 12 | Providing and supplying double flange sluice valves confirming for IS 2906/14846 including warn gear arrangement as per test pressure stainless steel spindle caps including all taxes transportation etc complete. |
| 13 | Providing and supplying ISI Std C.I.D/F.Specials upto 300 mm dia. |
| 14 | Distribution System - Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985 / 1988 excluding GST levied by GOI and GOM in all respect, including transportation, freight charges, inspection charges,oading, unloading, conveyance to the departmental stores and stacking the same in closed shed duly protected from sun rays and rains including cost of jointing material i.e. solvent cement, etc. complete (selffit type to be jointed with cement solvent). 90 mm dia. PVC pipe 4Kg/sqcm |
| 15 | 75 mm dia. PVC pipe 4Kg/sqcm |
| 16 | Providing and supplying ISI standard CIDF specials & fittings including cost of all labours and materialsandtransportation to stores / site, loading , unloading including all taxes , etc. complete. |
| 17 | Providing and supplying ISI mark CIDF sluice valves of following dia including all taxes (Central and local ) railway freight inspection charges ,unloading from railway wagon, loading into truck transportation upto departmental stores/sitesunloading stacking etc. complete. 65 mm dia. |
| 18 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift0.00 to 1.50 M. |
| 19 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift0.00 to 1.50 M. |
| 20 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift0.00 to 1.50 M. |
| 21 | Excavation for foundation / pipe trenches in hard rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift0.00 to 1.50 M. |
| 22 | Lowering, laying and jointing with P.V.C. pipes and specials of following class and diameter including cost of conveyance from stores to site of works including cost of all labour, material, except cement solvent, rubber ring, as per IS code, etc. complete (with cement solvent joint / ring fit joint). 90 mm dia. PVC pipe 4Kg/sqcm |
| 23 | 75 mm dia. PVC pipe 4Kg/sqcm |
| 24 | Lowering, laying and jointing in position following C.I. D/F Sluice valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc.complete. (Rate for all class of valves.) 165 mm dia. Sluice valve |
| 25 | Providing and fixing C.I. road box including loading, unloading and carting to site of work including all necessary excavation in all types of strata and fixing in murum packing, etc. complete.225 mm x 300 mm (40 kg) |
| 26 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |