Construction Of Baluster, Concrete Sit Out, Wall Painting And Ornamental Works In Kalpalam Bridge In Ward No. 82 Construction Of Baluster, Concrete Sit Out, Wall Painting And Ornamental Works In Kalpalam Bridge In Ward No. 82
Tender Overview
Project Description
Construction Of Baluster, Concrete Sit Out, Wall Painting And Ornamental Works In Kalpalam Bridge In Ward No. 82 Construction Of Baluster, Concrete Sit Out, Wall Painting And Ornamental Works In Kalpalam Bridge In Ward No. 82
BOQ
| Sl. No. | Item Description |
| 1 | Dismantaling theExesting RCC Concrete for Foundation of Baluster including All Charges etc completed as per standard sepcification. |
| 2 | Supplying and erecting shuttering with necessary suppot for paint surface such as R.C.C Boxing side slab and Smilar R.C.C slap with all cross bracing ect. Complete in all floors of any height. The retrieved materials should be taken back by the contractor) the payment for centering shall be given after the concrete is laid (vertical portion) |
| 3 | Plain Cemet Concrete 1:3:6 (one cement, three fine aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification. |
| 4 | Providing and laying in position standardized Concrete Mix M-20 Grade in accordance with IS 456-2000using 20mm and downgrade hard borken granaite stone jelly for all RCC of works with minimum cement concrete of 325 kb/m³amd maximum water cement ratio of 0.55 including admixture (Plaster / super Plasticizer) in recomended proportions as per IS : 9103 to accelerate, retard setting of concrete improve workability without imagining strength and durability with about (5.0cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cum) 5156 kg of 10-12mm Machine crushed stone jelly and with about (4.79 cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering and also including laying vibrating with mechanical vibratorsfinishing curing etc. And providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necassry without claiming extra, etc., Complete complying with standard specification and as directed by the department officers the coarse and fine aggregates to be used should amply with the requirments of IS Standard .(No Seperate paymen will be made by the Deparment for the excess usage of materials). |
| 5 | Suppling and Fabricating and placing in position MS (or) R.T.S bar for reinforcement to all RCC wroks as per the desing given including cost of steel and binding wire also in all floors. |
| 6 | Supplying and laying in flooring with fully polished Sinthetic Grey colour, Granite stone of 20mm thick (average) of 4\" X 2\" in size laid over base,layer of cementmortar 1:3 (one cement and three sand)- 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed bythe deparmental officers |
| 7 | Supplying & Laying of MS Pipe & Specials including all labour & material charges etc completed as per standard specification a) 25mm Dia\"B\" Class M.S Pipe |
| 8 | b) 25mm Dia M.S Length Coupler |
| 9 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming cout including the cost all materials etc,complete, in all floors. |
| 10 | Providing two legged scaffolding using suitable sizes of casurina posts of (1.50cm over all length 3m height + 0,50 lup) The distance between the twO rows being 2m and the spacing of posts being 2m in both rows with two horizontal posts with 0,50m.over lap on either side and braces at 2m CIC including longitudinal and transwere middle of 40mm thick and Im width ete.in complete shape using coir and nails and as directed by the Departmental Offices. |
| 11 | Surface preparation on old painted surface Removing old pinted surface mechanically using serapping machine, removing the dust and dirt by washing using mild detergent solution and rubbing down the surface with abrasion paper including touching up patches appeared on the surface with a coat of primer paint when dry conditíon prevails and rubbing down the painted patch lightly after surface get dried excluding cost of scaffolding and including cost tools and plants and cost of all other materíials ete complete, as per standard speeification. |
| 12 | Surface preparation on unpainted surface Rubbing down the surface using wire birush sand paper/wall putty blade as surface condition requires and cleaníng dust, loose particles so as to make the surface totally clean dried excluding cost of seaffolding andincluding cost tools and plants and cost of all other materíals ete complete. as per standard specification. |
| 13 | Providing two coats of damp proof putty over the wall surface to levelling the undulation in the walls of approved make. The rate including cot of puty, sand paper and labour charges for smoothening the surface ete. complete, |
| 14 | Painting wall surface with two coat of Synthetic Enamal paint approved quality and colour over a priming coat, including thorough serapping, clean removal of dirt, ete complete and including necessary plaster of paris, putty, wherever required cte, complete as per standard specification. |
| 15 | GST 18% |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender