| 1 | Pipe laying a) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. Not exceeding 1.5 mtr in width and for shafts, wells, cesspits and the like in all kinds of soil for pipe laying works |
| 2 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 1) 150mm dia(M) 100mm dia(M) |
| 3 | 100mm dia(L) |
| 4 | 80mm dia(L) |
| 5 | 65mm dia(L) |
| 6 | 50mm dia(L) |
| 7 | 40mm dia(L) |
| 8 | 32mm dia(L) |
| 9 | 25mm dia(L) |
| 10 | 20mm dia(L) |
| 11 | 15mm dia(L) |
| 12 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 13 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level andremoval of rubbish upto a distance of 50 m outside the periphery of the area cleared. |
| 14 | Carriage of pipe by Mechanical Transport including loading, unloading and stackingav. 25.00km lead |
| 15 | Carriage of pipe by Manual Labour/ Ponies including loading, unloading and stacking av. 1.00km lead |
| 16 | Fixing of Sluice valves incl accessories of appropriate P N Rating100 mm dia |
| 17 | Fixing of Sluice valves incl accessories of appropriate P N Rating80 mm dia |
| 18 | Fixing of Sluice valves incl accessories of appropriate P N Rating65 mm dia |
| 19 | Fixing ofG.M Gate Valves incl accessories of appropriate P N Rating65 mm dia |
| 20 | Fixing ofG.M Gate Valves incl accessories of appropriate P N Rating50mm dia |
| 21 | Electric Welding of Joints including cost of electrodes |
| 22 | Providing of FHTCs |
| 23 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: a) Water bound macadam road. |
| 24 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: b) Bituminous road. |
| 25 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: a) 1:3:6 or richer mix (i/c equivalent design mix) |
| 26 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 mix concrete |
| 27 | Tube well cum pump room building (Standard as per Drawing enclosed) |
| 28 | Boundary wall (Standard as per Drawing enclosed) |
| 29 | Gate |
| 30 | Construction ofof 20000 glnscapacity Sump tank (as per standarddrawing enclosed) |
| 31 | Providing , installation , testingand commissioning of 5000GPH X 150m Head SPS includingstandby , electric chain pulleyof 3.00 M.T capacity and other allied works.Providing , installation , testingand commissioning of 5000GPH X 220m Head HCP (standby) and other allied works. Design , fabrication , installation, testing and commissioning of automatic starter cum protection panel cum fault analyzer for running of Submersible motor. Design , fabrication , installation, testing and commissioning of automatic starter cum protection panel cum fault analyzer for running of induction motor. Design , fabrication , installation, testing and commissioning of 100KVA voltage stabilizer and other allied works. Earthing complete with galvanized steel with plate electrodes 600mm x 600 x6mm thick buried in the ground vertically to a depth not less than 03 meter below ground including its allied works to save the electromechanical equipments from thundering / lightening |