Bellary Supply And Eandc Of Side Beam For Wt 4And5 Bellary Supply And Eandc Of Side Beam For Wt 4And5 , Supply : Comprising Of Design, Engineering, Manufacture, Fabrication, Assembly, Inspection & Testing At Vendors Works, Painting, Lubricants & Consumables, Forwarding, Proper Packing, Shipment And Delivery At Site For Project For The Total Scope Defined As Per Bhel Nit & Tender Technical Specification, Amendment & Agreements Till Placement Of Order. , Supply Of New Main ( Side ) Beam: Beam Will Be Fabricated Out Of Minimum 16 Mm Thick, Is: 2062 Plates ( Outer Box ) With Designed Internal Stiffeners. , Installation Services: Installation Servicesas Per Scope Defined In Nit Specification Comprising Of Receipt, Unloading, Handling, Transportation & Storage At Site, Lifting / Shifting, In-Site Transportation, Security Till Completion Of Work, Dismantling , Assembly, Complete Erection, Alignment, Carrying Out Pre-Commissioning, Commissioning, Trial Run At Site, Touch- Up Painting At Site After Erection And Assisting Performance Guarantee Tests. , Dismantling Services For Existing Beam Comprising Following Activities: A. Dismantling Of Hydraulic Pipes, Manifolds On The Beam And Covering With Dummy Plates B. Dismantling Of Movable Side Beam And Its Brackets C. Dismantling Of Wagon Clamps D. Dismantling Of Hydraulic Cylinders Of Clamps And Movable Side Beam E .Arresting End Rings In Their Aligned Positions F. Splice Plate Bolts Removal And Making Ready For Beam Dismantling G. Existing Damaged Beam Dismantling , Erection Services For New Beam Comprising Following Activities: A. Alignment Of New Beam With End Rings B. Beam And End Ring Splice Plate Bolts Torque Tightening C. Erection Of Wagon Clamps D. Erection Of Wagon Clamps Cylinders E. Erection Of Movable Side Beam Cylinders F.Erection Of Movable Side Beam G. Installation Of Hydraulic Pipes And Manifolds H. Re-Erected Pipe Lines Flushing , Specialised Commissioning Services As Per Bhel Site Requirement: Expert Commissioning Services For Specialized Job Of Plc, Hydraulic System. , Plc Expert ( From M / S. Honeywell ) , Hydraulic System Expert ( From M / S. Rexroth ) , Each Man-Visits Cost For Expert Visit , Expert Supervision For Post-Commissioning And Assisting In Pg Testing Of The Machine, Protocols Of Pg Test As Per Bhel Site Requirement , Cost Of Man-Days , Cost Of Each Man-Visits , Manpower Foroperating The Machine & Miscellaneous Services As Per Bhel Requirement For Site Deputation Basis , Mechanical Supervisor, Diploma With Min. 3 Years’ Experience In Wt Erection & Commissioning , Electrical / Instrumentation Supervisor, Diploma With Min. 3 Years’ Experience , Electrician, Iti With Min. 2 Years’ Experience , Fitter, Iti With Min. 2 Years’ Experience , Un-Skilled Worker / Helper , Touch-Up Painting Of The Machine Surface As Per Bhel Requirement - Two ( 2 ) Finish Coats ( Having Dft Of Min. 50 Microns Per Coat ) Of Pu Golden Yellow Paint Shall Be Applied To The Steel Structure At Site = 100 Microns Total Dft Of Primer And Paint ( Including All Coats ) Shall Be Min. 240 Microns. , Vetting Of Design & Fem Model Analysis Of The New Side Beam By Third Party Like Iit / Iisc Or Other Technical Institution Of Repute Or Any Consultant Connected To Coal Handling Plant Who Has Held A Senior Positon At A Reputed Consulting Firm .