|
| 1 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 4000A, ONE & HALF CIRCUIT BREAKER SCHEME -GIS BUS BAR MODULE |
| 2 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, GIS TRANSFORMER FEEDER BAY |
| 3 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, GIS BUS REACTOR FEEDER BAY |
| 4 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, GIS TIE BAY WITHOUT PIR |
| 5 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, GIS LINE FEEDER BAY WITHOUT PIR |
| 6 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3000A, SINGLE PHASE GAS INSULATED BUS DUCT |
| 7 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, SINGLE PHASE SF6 TO AIR BUSHING |
| 8 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, SINGLE PHASE SF6 TO OIL BUSHING/ CONNECTION SUITABLE FOR TRANSFORMER |
| 9 | SUPPLY- GIS : 400KV, 63KA FOR 1S, 3150A, SINGLE PHASE SF6 TO OIL BUSHING/ CONNECTION SUITABLE FOR REACTOR |
| 10 | SUPPLY- GIS : 336KV, 20KA GIS SURGE ARRESTER INCLUDING SURGE COUNTER |
| 11 | SUPPLY- GIS : 400KV, LOCAL CONTROL CUBICLE |
| 12 | SUPPLY- GIS : 400KV, INTERFACE MODULE FOR FUTURE EXTENSION OF GIS |
| 13 | SUPPLY- GIS : 400KV, CONTROLLED SWITCHING DEVICE (CSD) FOR GIS CB |
| 14 | SUPPLY- GIS : 400KV, SPECIAL CABLES OTHER THAN POWER & CONTROL CABLES REQUIRED FOR CSD FOR INTERFACING WITH CB AND RELAY PANEL |
| 15 | SUPPLY- GIS : TOOLS AND TACKLES |
| 16 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 3000A, TWO MAIN BUS BAR SCHEME- GIS BUS BAR MODULE |
| 17 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 3000A, GIS BUS COUPLER BAY |
| 18 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 1600A, GIS TRANSFORMER FEEDER BAY |
| 19 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 1600A, GIS LINE FEEDER BAY |
| 20 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 1600A, THREE PHASE GAS INSULATED BUS DUCT |
| 21 | SUPPLY- GIS : 132KV, 40KA FOR 1S, 1600A, THREE PHASE SF6 TO AIR BUSHING |
| 22 | SUPPLY- GIS : 132KV, 40KA FOR 1S, SF6 TO EHV CABLE CONNECTION MODULE |
| 23 | SUPPLY- GIS : 132KV, LOCAL CONTROL CUBICLE |
| 24 | SUPPLY- GIS : 132KV, INTERFACE MODULE FOR FUTURE EXTENSION OF GIS |
| 25 | SUPPLY- GIS : MANDATORY MAINTENANCE EQUIPMENT SUITABLE FOR GIS - SF6 GAS ANALYZER |
| 26 | SUPPLY- GIS : MANDATORY MAINTENANCE EQUIPMENT SUITABLE FOR GIS - SF6 GAS LEAKAGE DETECTOR |
| 27 | SUPPLY- GIS : MANDATORY MAINTENANCE EQUIPMENT SUITABLE FOR GIS - OFFLINE PARTIAL DISCHARGE MONITORING SYSTEM |
| 28 | SUPPLY- GIS : 400KV, MANDATORY MAINTENANCE EQUIPMENT SUITABLE FOR GIS - SF6 GAS FILLING, EVACUATING, FILTERING, DRYING, PUMPING & STORAGE PLANT |
| 29 | SUPPLY- GIS : 132KV, MANDATORY MAINTENANCE EQUIPMENT SUITABLE FOR GIS - SF6 GAS FILLING, EVACUATING, FILTERING, DRYING, PUMPING & STORAGE PLANT |
| 30 | SPARES- GIS : 400KV, MANDATORY SPARES AS PER TECHNICAL SPECIFICATION |
| 31 | SPARES- GIS : 132KV, MANDATORY SPARES AS PER TECHNICAL SPECIFICATION |
| 32 | SPARES- GIS : 400KV, 63KA FOR 1S, 4000A, SINGLE PHASE BUS BAR |
| 33 | SPARES- GIS : 400KV, GIS METALLIC ENCLOSURE |
| 34 | SPARES- GIS : 400KV, EXPANSION BELLOWS/ JOINTS |
| 35 | SPARES- GIS : 400KV, TEE BEND |
| 36 | SPARES- GIS : 400KV, ANGLE BEND (135°) |
| 37 | SPARES- GIS : 400KV, L-BEND |
| 38 | SPARES- GIS : 132KV, 40KA FOR 1S, 3000A, THREE PHASE BUS BAR |
| 39 | SPARES- GIS : 132KV, GIS METALLIC ENCLOSURE |
| 40 | SPARES- GIS : 132KV, EXPANSION BELLOWS/ JOINTS |
| 41 | SPARES- GIS : 132KV, TEE BEND |
| 42 | SPARES- GIS : 132KV, ANGLE BEND (135°) |
| 43 | SPARES- GIS : 132KV, L-BEND |
| 44 | SERVICES- GIS : 400KV, SUPERVISION OF ERECTION OF GIS |
| 45 | SERVICES- GIS : 400KV, SUPERVISION OF ERECTION OF GAS INSULATED BUS DUCT |
| 46 | SERVICES- GIS : 400KV, SUPERVISION OF ERECTION OF SF6 TO AIR BUSHING |
| 47 | SERVICES- GIS : 400KV, SUPERVISION OF ERECTION OF CSD COMPLETE IN ALL RESPECT |
| 48 | SERVICES- GIS : 400KV, TESTING & COMMISSIONING OF GIS |
| 49 | SERVICES- GIS : 400KV, TESTING & COMMISSIONING OF GAS INSULATED BUS DUCT |
| 50 | SERVICES- GIS : 400KV, TESTING & COMMISSIONING OF SF6 TO AIR BUSHING |
| 51 | SERVICES- GIS : 400KV, TESTING & COMMISSIONING OF CSD |
| 52 | SERVICES- GIS : 400KV, FINAL SUCCESSFUL HV/ POWER FREQUENCY TESTING OF GIS INCLUDING ARRANGING OF HV TEST KIT ALONG WITH OPERATOR |
| 53 | SERVICES- GIS : 132KV, SUPERVISION OF ERECTION OF GIS |
| 54 | SERVICES- GIS : 132KV, SUPERVISION OF ERECTION OF GAS INSULATED BUS DUCT |
| 55 | SERVICES- GIS : 132KV, SUPERVISION OF ERECTION OF SF6 TO AIR BUSHING |
| 56 | SERVICES- GIS : 132KV, TESTING & COMMISSIONING OF GIS |
| 57 | SERVICES- GIS : 132KV, TESTING & COMMISSIONING OF GAS INSULATED BUS DUCT |
| 58 | SERVICES- GIS : 132KV, TESTING & COMMISSIONING OF SF6 TO AIR BUSHING |
| 59 | SERVICES- GIS : 132KV, FINAL SUCCESSFUL HV/ POWER FREQUENCY TESTING OF GIS INCLUDING ARRANGING OF HV TEST KIT ALONG WITH OPERATOR |
| 60 | SERVICES- GIS : INSULATION CO-ORDINATION STUDIES FOR GIS SYSTEM |
| 61 | SERVICES- GIS : TRAINING FOR GIS AT SITE |
| 62 | SERVICES- GIS : TRAINING FOR GIS AT MANUFACTURER’S WORKS |
| 63 | SERVICES- GIS : 400KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR SUPERVISION OF ERECTION OF GIS |
| 64 | SERVICES- GIS : 400KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR TESTING & COMMISSIONING OF GIS |
| 65 | SERVICES- GIS : 400KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - HIRING CHARGES OF HV TEST KIT WITH OPERATOR |
| 66 | SERVICES- GIS : 132KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR SUPERVISION OF ERECTION OF GIS |
| 67 | SERVICES- GIS : 132KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - SERVICES FOR TESTING & COMMISSIONING OF GIS |
| 68 | SERVICES- GIS : 132KV, REF. UNIT PRICE OF GIS INDIVIDUAL ITEM/ EQUIPMENT - HIRING CHARGES OF HV TEST KIT WITH OPERATOR |