Construction Of Link Road From Dadpeth To Kuchan By Way Of Construction Of Semi Pucca Edge Wall In Km 5Th Rd ( 50-100 ) , ( 150-250 ) , R / Wall Rd ( 500-600 ) And Constt. Of B / Wall In Km 5Th Rd ( 240-325 ) , Rd ( 500-575 ) ( Under District Plan
Tender Overview
Project Description
Construction Of Link Road From Dadpeth To Kuchan By Way Of Construction Of Semi Pucca Edge Wall In Km 5Th Rd ( 50-100 ) , ( 150-250 ) , R / Wall Rd ( 500-600 ) And Constt. Of B / Wall In Km 5Th Rd ( 240-325 ) , Rd ( 500-575 ) ( Under District Plan ) Plz Refer Boq
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres:.All kinds of soil |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone.nallah stone |
| 5 | Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) nallah |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 8 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 9 | Dumping stone excluding cost of stones.in Horizontal on level |
| 10 | Carriage of Stone av distance 05 km By MT |
| 11 | Carriage of sand/Crusher bajree by MT 13 kms |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender