Assistance To Maintenance Of Equipments In Sms And Overhauling Cleaning Of Vacuum System In Sms.-1. Work Schedule 1: Breakdown And Preventive Maintenance Of Vad 1&2, Vod And 70T Eaf: I ) . Repair And Fitting Of Hydraulic Power Pack, Cleaning And Changing Of Filter Unit, Checking And Making Of Oil Level, Hydraulic And Pneumatic Cylinders, Pilot Valve, Pump Motors Along With Complete Assembly. Cleaning / Repair / Fitting Of Copper Insert, Bus Tube, Insulation Change, Tightening Of Bolt Of All The Water Cooled Cable, Water Leakage / Blockage Rectification, Roof / Water Cooled Panels Testing / Repair & Changing Work And Other Mechanical And Hydraulic Maintenance Related Work Of Vad 1&2, Vod & 70T Eaf. Ii ) . Repair / Maintenance Of Plc Controlled Dc Drive / Thyristor Control System, Resistance Box, Winch Motors, Limit Switch, Mcc And Control Desk. Repair / Maintenance Of 33Kv / 11 Kv Substn., 400Sq Mm / 300Sq Mm Xlpe Cable, Making Of Transformer Oil Level, Heat Exchanger Cleaning, Maint. Of Furnace Transformer, Riser, Water Cooled Cable Repair / Change And Other Allied Maintenance Work Of Ht And Lt Power / Control System Of Vad 1&2, Vod & 70T Eaf. Iii ) . Repair / Maintenance Of Temperature Measuring Instruments, Temperature And Pressure Gauge, Making / Repair Of Lance And Other Allied Electronic 769 Nos. Of Heat Rs. ___________ Per Heat Nit No: Ff:21:Msm:Rv:Wc:01:047, Dated:-28.10.2021 Name Of Work: Assistance To Maintenance Of Equipment’S In Sms & Overhauling / Cleaning Of Vacuum System In Sms. P A G E 21 | 24 Instrumentation Work Of Vad 1&2, Vod & 70T Eaf. Note: 1. For Efficient Preventive And Breakdown Maintenance Of Equipments, Minimum 06 Nos. & Maximum Of 8 Nos. Of Skilled Mandays To Be Engaged Per Day ( Ie. In A & B Shift ) . 2. Work Schedule 2: Preventive Maintenance On Sunday / Holidays And “C” Shift: Preventive Maintenance Work All Mechanical, Hydraulic, Electrical And Electronics Part Of Vad-1 & 2. Note: 1. For Efficient Preventive Maintenance On Sunday / Holidays And “C” Shift, Minimum 3 Nos. & Maximum 5 Nos. Of Skilled Mandays To Be Engaged Per Sunday / Holidays / “C” Shift. 72 Nos. Of Preventive Maintenanc E Rs. ___________ Per Preventive Maintenanc E 3. Work Schedule 3: Breakdown And Preventive Maintenance Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boilers Electrical Maint. Ladle Pre Heater And Other Allied Equipments In Sms: I ) . Repair And Fitting Of Hydraulic Power Pack, Cleaning And Changing Of Filter Unit, Checking And Making Of Oil Level, Hydraulic And Pneumatic Cylinders, Pilot Valve, Pump Motors Along With Complete Assembly. Cleaning / Repair / Fitting Of Copper Insert, Bus Tube, Insulation Change, Tightening Of Bolt Of All The Water Cooled Cable, Water Leakage / Blockage Rectification, Roof / Water Cooled Panels Testing / Repair & Changing Work And Other Mechanical And Hydraulic Maintenance Related Work Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boilers Electrical Maint., Ladle Pre Heater And Other Allied Equipment In Sms Sms. P A G E 22 | 24 Ii ) . Repair / Maintenance Of Plc Controlled Dc Drive / Thyristor Control System, Resistance Box, Winch Motors, Limit Switch, Mcc And Control Desk. Repair / Maintenance Of 33Kv / 11 Kv Substn., 400Sq Mm / 300Sq Mm Xlpe Cable, Making Of Transformer Oil Level, Heat Exchanger Cleaning, Maint. Of Furnace Transformer, Riser, Water Cooled Cable Repair / Change And Other Allied Maintenance Work Of Ht And Lt Power / Control System Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boilers Electrical Maint. Ladle Pre Heater And Other Allied Equipment In Sms. Iii ) . Repair / Maintenance Of Temperature Measuring Instruments, Temperature And Pressure Gauge, Making / Repair Of Lance And Other Allied Electronic Instrumentation Work Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boilers Electrical Maint. Ladle Pre Heater And Other Allied Equipment In Sms. Note: 1. For Efficient Preventive And Breakdown Maintenance Of Equipments, Minimum 04 Nos. & Maximum Of 06 Nos. Of Skilled Mandays & Minimum 1 & Maximum 3 Nos. Of Unskilled Mandays To Be Engaged Per Day ( Ie. In A & B Shift ) . 4. Work Schedule 4: Preventive Maintenance On Sunday / Holidays / “C” Shift: Preventive Maintenance Work All Mechanical, Hydraulic, Electrical And Electronics Part Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boiler Electrical Mint. Ladle Pre Heater And Other Allied Equipments In Sms. Note: 1. For Efficient Preventive And Breakdown Maintenance Of 10T, 30T Eaf, Slide Gate Power Packs, Vd Unit, Boiler Electrical Mint. Etc