}

Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking Simulator At Ins Garuda And Routine Maintenance Of Vrf Ac In Crl, Asr, Diving School At Naval Base Kochi Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking , KOCHI-Kerala

Military Engineer Services-MES has published Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking Simulator At Ins Garuda And Routine Maintenance Of Vrf Ac In Crl, Asr, Diving School At Naval Base Kochi Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking . Submission Date for this Tender is 18-11-2021. Dehumidifiers Tenders in KOCHI Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

29686167
Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking Simulator At Ins Garuda And Routine Maintenance Of Vrf Ac In Crl, Asr, Diving School At Naval Base Kochi Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking
Open Tender
Indian
Kerala
KOCHI
18-11-2021

Tender Details

Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking Simulator At Ins Garuda And Routine Maintenance Of Vrf Ac In Crl, Asr, Diving School At Naval Base Kochi Preventive / Routine Maintenance Of Desiccant Dehumidifier At Seaking Simulator At Ins Garuda And Routine Maintenance Of Vrf Ac In Crl, Asr, Diving School At Naval Base Kochi

Key Value

Document Fees
INR 500 /-
EMD
INR 60000.0 /-
Tender Value
INR 30 Lakhs /-

BOQ Items

Name of Work: PREVENTIVE/ROUTINE MAINTENANCE OF DESICCANT DEHUMIDIFIER AT SEAKING SIMULATOR AT INS GARUDA AND ROUTINE MAINTENANCE OF VRF ACIN CRL, ASR, DIVING SCHOOLAT NAVAL BASE KOCHI.
Sl. No. Item Description
1Preventive maintenance and check up of Dehumidifier Installed at FATS Garuda, capacity of 4850/5000 CFM including complete accessories and controls, and the entire system to be checked and servicing by OEM or their authorised service agency for everymonth interval throughout CA durationand incase of any breakdown occurs at any time, the tenderer shall be attend the complaintand made serviceable with in time including minor spares such as fuses, wires, nut, bolts etc. for above mentionedall as specified and directed by Engineer-in-charge. (a) Dehumidifier Model No FLI 7300, Ser No. 2013-BAC-18620 Make: Bry-Air Note: - Major spare parts are measured and paid separately under relevant item in BOQ and labour charges for replacement shall be deemed to include in the quoted rate above.
2Preventive maintenance and check up of Dehumidifier Installed at FATS Garuda, capacity of 4850/5000 CFM including complete accessories and controls and the entire system to be checked and servicingby OEM or their authorised dealer for every 30 days interval throughout CA durationand incase of any breakdown occurs at any time, the tenderer shall be attend the complaintand made serviceable with in time including minor spares such as fuses, wires, nut, bolts, etc., for above mentionedall as specified and directed by Engineer-in-charge. (a) Dehumidifier Model No FLI 7300, Ser No. 2018-BAC-28982 Make: Bry-Air Note: - Major spare parts are measured and paid separately under relevant item in BOQ and labour charges for replacement shall be deemed to include in the quoted rate above.
3Supply only React filter Air inlet pre-filter all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
4Supply only SSR (Solid state relay), working capacity 90-250V AC, all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
5Supply only Thermostat 50-300 DEC all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
6Supply only Limit Switch all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
7Supply only Process filter Air inlet Pre Filter all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
8Supply only Pressure Switch all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
9Supply only Timer select 800M all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
10Supply only Bed drive motor including arrangement pulley, chain, controllers complete all as specified and directed by Engineer-in-charge.Make:- Recommended by OEM (Bry- Air)
11Supply only Idler bracket assembly suitable for Existing Dehumidifier, Model No.FLI 7300, Part No 43115, testing, all as specified and directed by Engineer-in-charge. Make:- Recommended by OEM (Bry- Air)
12Preventive maintenance and Monthly routine checkup of the VRF unit of capacity 78 HP having 05 outdoor units, 8 Ceiling Suspended AHU"S indoor units installed at Diving school on monthly basis including all kind of replacement of spare parts.Make: LG Note: contractor shall be responsible for replacement of false ceiling, if damage occurred while servicing of Ceiling suspended units.
13Material and Labour for monthly Servicing of VRF system, indoor units -05 Nos ,Each cassette typehaving capacity of 5 HP at Diving schoolBriefing room ,clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place , check the drainage water tank and cleaned ,replace the communication cables and sensor if found defective all as specified and directed.
14Material and labour for Monthly services of outdoor unit of VRF system make Blue star with capacity 12 HP at ASR complex, completely by disconnecting/ covering all electric/electronic boards and wiring and servicing condenser coils and compressor, reservoir areas completely wet servicing by using approved chemicals by OEM manufacturer and re-assembling setting all parameters by using software’s by an OEM engineer testing all included and directed by Engineer in charge.
15Material and Labour for monthly Servicing of VRF system, indoor units - 02 nos of cassette type of having capacity 12 HP, Make Blue star at ASR complex, clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place, check the drainage water tank and cleaned, replace the communication cables and sensor if found defective all as specified and directed.
16Material and labour for Monthly services of outdoor unit- 02 nos of VRF system make Voltas with capacity 24 HP at Command Ref Library bldg, completely by disconnecting/ covering all electric/electronic boards and wiring and servicing condenser coils and compressor, reservoir areas completely wet servicing by using approved chemicals by OEM manufacturer and re assembling setting all parameters by using software’s by an OEM engineer testing all included and directed by Engineer in charge.
17Material and Labour for monthly Servicing of VRF system, indoor units - 05 Nos of cassette type of having capacity of 24 HP at Command Ref Library bldg, clean with mild Air blower in the coil side and remove the inside fine filter, cleaned with Soap solution after cleaning process fix in proper place , check the drainage water tank and cleaned ,replace the communication cables and sensor if found defectivecomplete all as specified and directed. Notes for item No 12 to 17: 1.The contractor shall ensure visit ofOEM manufacturer Engineer monthly once and report/ serviceability of Outdoor units and same shall be submitted to this Office. The charges for all OEM procedures are deemed to be included in the quoted rates. The reports of OEM Engineer shall be produced before submitting RARs. 2.AC mechanic must be experienced in VRF Plants and capable for carrying out any type of maintenance or attending breakdown in above mentioned plants. 3. In case of any breakdown the additional man power if required will be arranged by the contractor without any price adjustment.
18Supply and replacement of catch all core as suitable in existing pipe line of VRF suction/discharge line all as specified and directed
19Supply and fix in replacement of VRF AC of 12 HP capacity all as specified and directed. Make: Recommended by OEM blue star/Voltas
20Taking down unserviceable Digital compressorunit of VRF AC of 6 HP/5.5TR capacity and replace with new compressor unit in the existing unserviceable sealed compressor unit with and including initial charging of gas and oil complete all as specified and directed by Engineer in charge. MODEL :ZRD72KCTFD-433 OF VOLTAS
21All As per item No. 20but capacity of outdoor unit10 to 16 HP all as specified and directed by Engineer in charge. Make: As recommended by OEM (LG)
22Taking down unserviceable fixed compressor unit of VRF ACs of 6 HP/5.5TRcapacity and replace with new compressor unit in exchange of the existing unserviceable sealed compressor unit with and including initial charging of gas and oil complete all as specified and directed by Engineer in charge. MAKE :ZR61KCTFD-420 OF VOLTAS
23All As per item No. 22 but capacity of outdoor unit 10 to 16 HP all as specified and directed by Engineer in charge. Make: As recommended by OEM (LG)
24Supply and fix in replacement of Liquid line solenoid valve for VRF system. Make: Blue star/LG
25Supply and fix in replacement of Main PCB Board for Cassette type Indoor unit at VRF system. Make: Recommended by OEM LG
26Supply and fix in replacement of remote Control for Cassette type Indoor unit at VRF system. Make: Recommended by OEM LG
27Supply and fix in replacement of Ceiling suspended AHU"s Fan Blower unit Bushes Make: Recommended by OEM LG
28Supply and fix in replacement of Fan blades suitable for existing outdoor units of capacity 10-15 HP VRF systems.
29Supply and fixing of Thermal insulation class "O" nitrile rubber insulation density 45-55 kg/m3, for suction/discharge piping of VRF pipe lines suitable size of dia as per site complete all as specified and directed.
30Supply and fixing External PCB For VRF outdoor capacity of 10 to 16 HP suitable for existing LG make out door units complete all as specified and directed.
31Supply and fixing Power PCB For VRF indoor capacity of 10 to 16 HP suitable for existing LG make out door units complete all as specified and directed.
32Supply and fix Condenser coil, for Outdoor units of VRF Unit up to capacity 12 HP including leak testing by using nitrogen all as per OEM recommendation and directed.
33Supply and fix Main PCB for four way cassette/CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
34Supply and fix Drain Pump for four way cassette/CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
35Supply and fix Blower motor for four way cassette/ CSU units indoor units of VRF Unit up to 16 HP including testing all as directed
36Supply and fix Linear expansion Valve for four way cassette/CSU units indoor units of VRFUnit up to 16 HP including testing all as directed
37Amount of Credit Schedule shall be deducted to arrive the Contract Sum.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail