|
| 1 | Item Description 1..Cleaning grassand removal of rubbish upto a distance of 50 meters outside the preriphery of the area etc. complete. |
| 2 | Item Description2-Excavation for catch/ side water gutter in sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff a directed all sorts of soils Mechanical Means P.No.29/SSR it No. 2.18(MORTH-309) |
| 3 | Item Description 3.. Providing pick and roll surface by picking the old WBM surface to the required standarad ,adding 30 % of 40mm size metal and required quantity of murum including laying sectioning ,watering ,compacting with static roller with thin layer of mururm blindage on carriageway ,watering and compacting by static roller including cost of matreials ,loading unloading stacking and labour etc complete |
| 4 | Item Description 4-.Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyser and V-Net attachment to requireddensity(G-II) |
| 5 | Item Description 5:-Providing and constructing 50 mm thick modified penetration macadam (MPM) road surfaceincludingall materials,preparing the existing road surface , spreading 40mm stone metal layers 30% crusher broken metal + 70 % hand broken (by breing rubble obtained by blasting)heating and spraying bitumen of VG 30 grade at the rate of 1.75 Kg /100 sq.mt. spreading 12mm size chips compacting with static roller,etc |
| 6 | Item Description6-.Providing and applying tack coat on the prepared surface heating by fames in boiler and spraying bitumen sea footed in bitumen boiler on B.T.surface3.0 kg/10 sqm VG 30 bulk bitumen. |
| 7 | Item Description 7-.Open graded premix surfacing-providing and laying OGC 20mm thickness composed of 13.2mm to 5.6mm aggregates premixed with bituminuous binder transported to site with VTS laid over a previously prepared surface,finished to the required grade,level,alignment and rolling to achieve the desired compaction VG-30 Bitumen,including providing and laying sealcot sealing voids in a bituminous surface. |
| 8 | Item Description 8--.Providing bituminous Type A liquid seal coat onbituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface,heating and applying bitumen@ 0.98 kg sqm. By mechanical means ,spreading chips and rolling by static roller having weight 8 to 1010 MT etc complete. |
| 9 | Item Description 9-.Supplying hard murum/kankar at the road site,including conveying and stacking complete…………. |
| 10 | Item Description 10-Spreading hard murum for side width complete……………… |
| 11 | Item Description 11-Compacting the Hard Murum Blanketing and side widths including laying in layerson each side with power roller including artificial etc. |
| 12 | Item Description 12-.Providing and fixing board displaying information,such as Name of Contractor,Work completion and liability period etc having rectangular shape of 1.2*0.9m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of zinc chromecromate stoving primer and two coatsof enamel paint on front side andgray stove enamell on back side and border/messages/symblos etc with approved colour shade paint complete on M.S. angle of size 35mm*35mm*3mm frame with properly cross braced M.S. angles of size 35mm*35mm*3mm duly painted including two M.S.angle iron posts of size 65mm*65mm*6mm 3.65m long painted with alternate black and white bands of 25cm width including all fixtures etc and fiixng the boards in 1:4:8 concrete block of size 60cm*60cm*75cm including excavation,refilling,transportation and labour etc complete.As directed by Engineer-in-charge etc. complete. . |
| 13 | Royalty Charges for Hard murum/Metal |
| 14 | Soil/Mururm- Sieve Analysis |
| 15 | Soil/Mururm- Liquid limit/plastic limit |
| 16 | Basic Test ofAggregate -Sieve analysis Metal |
| 17 | Basic Test ofAggregate -Water absorption Test/impact value/crushing value |
| 18 | Bitumen-Extraction (Binder contect) for OGC |
| 19 | Bitumen/Penetration .Softening Point, Flash & Fire Point |