| 1 | A. Top soil (Not requiring Drilling), Total Quantity – 1,80,2317.45 Cum (1.80 M Cum) |
| 2 | (A1) Lead Slab:- 0-1KM,Total Quantity :- 492.43 Cum Route No. 1, Quantity- 492.43 Cum, Dump - A |
| 3 | (A2) Lead Slab:-1-2 KM, Total Quantity:- 36.02 Cum Route No. 1, Quantity- 36.02 Cum, Dump - A |
| 4 | (A3) Lead Slab: - 2-3KM, Total Quantity:- 8,59,949.00 Cum Route No. 2, Quantity- 8,59,949.00 Cum, Dump - B |
| 5 | (A4) Lead Slab: - 3-4KM, Total Quantity:- 9,41,840.00 CumRoute No. 2, Quantity- 9,41,840.00 Cum, Dump - B |
| 6 | (B) Hard Strata (Requiring Drilling in all kind of strata / OB), Total Quantity- 4,67,13,269.00 Cum (46.77 MCum) |
| 7 | (B1) Lead Slab: 0-1KM Total Quantity: 76,88,313.00 Cum Route No. 3, Quantity-76,88,313.00 Cum, Dump - C |
| 8 | (B2) Lead Slab: 1-2 KM Total Quantity: 1,61,26,489.00 Cum Route No. 3, Quantity-1,61,26,489.00 Cum, Dump – C |
| 9 | (B3) Lead Slab: 2-3 KM Total Quantity : 1,61,26,489.00 Cum Route No. 3, Quantity-1,61,26,489.00 Cum, Dump – C |
| 10 | (B4) Lead Slab: 3-4 KM Total Quantity : 67,71,978.00 CUMRoute No. 3, Quantity- 67,71,978.00 Cum, Dump – C |
| 11 | Total impact of GST for the purpose of CTC |