| 1 | Dismantling and removingcement concrete includingstacking the use full materials for re use and removing the derbies within 50mt lead as per the direction of E-I-C. |
| 2 | Earth work in excavationin hard soil or gravelly soilincluding rough dressing & levelling the bed within 50mtr initial lead& 1.50Mtr initial lift including all labour T&P sundries etc.complete as per direction of EIC. |
| 3 | Conveyance of excavated materials such as rough stone, metal, khoa ,chips ,sand, surkhi quarry rubbish, moorum, laterite stone, washed gravel ,flyash and earth away from the work site by mechanical means including loading and unloading and depositing the same within 5km truck lead as per the direction of Engineer-in-chrage |
| 4 | Providing & filling manually with selected sand in layers not exceeding 150mm. thick including watering and compacting with all leads and lifts including cost, carriage royalty etc as per the direction of the engineer in charge. |
| 5 | Cement concrete in prop. (1:3:6) in foundationusing 4 cm size CBHG metal of quality from approved quarry washed and cleaned including hoisting, lowering, laying concrete, ramming, watering, curing etc lincluding cost, conveyance, royalties and taxes of all materials, with cost of all labours, sundries and T & P such as concrete mixer, concrete vibrator required for the work etc, complete as per specificationand direction of EIC |
| 6 | R.C.C. work of M25 grade with Crusher granite coarse aggregate of size 20 mm down graded chips mixed with concrete mixer with all leads lifts and delifts including all cost, conveyance, royalty & taxes etc.compete of all materialsas per specification and direction of Engineer-in-charge. |
| 7 | Cement Concrete M20 grade with crushed granite coarse aggregate of size 20mm down graded mixed with concrete mixer with all leads, lifts and delifts including cost, coveyance, royalty & taxes etc. of all materials, all labour charges, T&P, hire & running charges of all machinaries & equipment as required, watering & curing etc. complete as per direction of Engineer-in-charge. |
| 8 | Supplying fitting & placing uncoated HYSDbar reinforcementcomplete as per drawing and technicalspecification with all cost and conveyance etc. completedas per thedirection of the E-I-C. |
| 9 | Rigid smooth centering and suttering for RCC works including false works and dismantilling them after casting including cost of materials complete in G.F. (A) RCC walls and fins etc. |
| 10 | Rigid smooth centering and suttering for RCC works including false works and dismantilling them after casting including cost of materials complete in G.F. (B) For slabs & fins etc. |
| 11 | Labour for lifting of rcc precast cover slab from casting yard and placing them at its position after curing is over as per the direction of EIC. |
| 12 | Cost of transperency display board with coloring and lettering including all cost, conveyance laboure charges etc and other foreseen item if any. |