|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removingthe excavatedmaterialuptoadistanceof50m.beyondthebuildingareaand stackingandspreadingas directed,dewatering,preparingthebedforthefoundationand necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means |
| 2 | Providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc) |
| 3 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneissmetalforbedblocks,foundationblocksand suchotheritems includingbailing outwater, Steelcentering, formwork,laying/pumping,compacting, rougheningthemifspecialfinish is to be provided, finishing uneven and honeycombedsurfaceandcuringetc.complete.TheCement Mortar 1:3plaster is consideredfor rendering unevenandhoneycombedsurface only. Newly laid concrete shallbe coveredby gunnybag,plastic, tarpaulin etc. (Wooden centeringwill not beallowed.), with fullyautomaticmicro processor based PLC withSCADA enabledreversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 4 | ProvidingandlayingCastinsitu/ReadyMixcementconcreteM-20oftrap/granite/ quartzite/ gneiss metalforR.C.C. slabsand landings as perdetailed designsand drawingsincludingsteelcentering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic microprocessorbasedPLCwithSCADAenabledreversibleDrum Typemixer/concreteBatchmixplant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 5 | Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels,chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings andschedules.including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. |
| 6 | Providing and fixing cautionary / warning sign board of size 60 cm. having shape of equilateral triangle with apexpointupwards.preparedon16gaugeM.S.sheetincludingpaintingwithonecoatofzinccromate stovingprimerandtwocoatseachofwhitebackground,redborderandbacksidegraystoveenamelled, bonded with cut out of Retro reflective sheet Engineering grade, symbol / letters / numerals / border / arrow, coatedwithnonpealablecrystalclearprotectivetransparentcoatretaining100%reflectionincludingone number of M.S. Angle iron post of size 50 x 50 x 5 mm of 3.65 m. long inflated at bottom drilled on top in one piece without joint painted with white and black bands of 30 cm. fixing board and post with 2 Nos. high strengthG.I.boltsandnutsofsize10mm dia.and20mm longincludingalltaxes,conveying,fixingin groundwithcement concrete 1:4:8block of60 cm x 60cm x75 cm size etc.complete.60 cm.equilateral triangle M.S. sheet with Engineering grade, |
| 7 | ROYALTY CHARGES :- Supply of Rubble, Murum, Soil, 60mm./40mm. metal (Hand broken), royalty charges are not included in the rates.[As per Govt. of Maharashtra, Revenue and Forest Departments Gazette No.67 Dt.15 May,2015. States that the royalty charges ofRs.141.34/Cu.M. ) are considered. The surcharge levied on Royalty shall also be payable to the contractor.ROYALTY CHARGES FOR SAND |
| 8 | Laboratory testing charges are not considered in the Rate Abstracts. Where ever required separate item shall be taken in the estimate for material testing charges, on the basis of testing frequency and charges fixed by Vigilance & Quality Control Circle, for the current year and shall form part of tender.testing of material by Quality control and certified quality must be use by contractor. CONCRETE Compressive Strength of C. C. Cube (Set of 3 Cubes) |
| 9 | PART II- ADD 12% GST |
| 10 | 1% FOR LABOUR INSURANCE |