|
| 1 | Providing & Fixingof PVC Stainer (Umbrella type) for ( 07 No 5000 GPH IRP-28). |
| 2 | Unloading & Loading of Sand (Barakar) 16/32 Mesh(40 Kg Bag) for ( 7 No 5000 GPH IRP-21 +4 No 250 LPH RO 4). |
| 3 | Unloading & Loading of Gravel (Barakar) 1/2,1/4,1/8,1/16(40 Kg Bag) for ( 07 No 5000 GPH IRP-22 +4 No 250 LPH RO-4 ). |
| 4 | Unloading & Loadingof Catalytic charge media (35 Kg Bag) for (07 No 5000 GPH IRP-28 +4 No 250 LPH RO-4 ). |
| 5 | Unloading & Loadingof Anthrasite of (40 Kg Bag) for ( 07No 5000 GPH IRP-28) |
| 6 | Unloading & Loadingof MNO2 (75% manganese) of (40 kg Bag) for ( 07 No 5000 GPH IRP-21) |
| 7 | Unloading & Loadingof Activated carbon for (04 No. 250 LPH RO 80) |
| 8 | Painting (outside at the vessel) for 5000 GPH Capacity IRP with scraping ,primer & painting etc as per direction of engineer in charge. |
| 9 | Repair of the Air Compressure including starter for (07 No 5000 GPH IRP-7) if required as per direction of engineer in charge. |
| 10 | Add Fixing/Service Charge for 5000 ltr IRP if required as per direction of engineer in charge. |
| 11 | Providingof Micro candle 20’ long For (20 No 60 & 50 ltr capacity Ro + 04 No 250 ltr RO ) |
| 12 | Providing of carbon candle 20’ longUpto 60 ltr capacity RO. |
| 13 | Providing of membrane filament 75 Gpd Upto 60 ltr capacity RO. |
| 14 | Providingof Test ordour filter Upto 60 ltr capacity RO. |
| 15 | Providingof SVUpto 60 ltr capacity RO. |
| 16 | Providingof DC Motor Pump 48 V Upto 60 ltr capacity RO. |
| 17 | Providingof adapter 48 W+24wUpto 60 ltr capacity RO. |
| 18 | Providingof PVC pipe 1/4 & 3/8Upto 60 ltr capacity RO. |
| 19 | Providingof FR Upto 60 ltr capacity RO. |
| 20 | Providingof ElbowUpto 60 ltr capacity RO. |
| 21 | Providingof Tee Upto 60 ltr capacity RO. |
| 22 | Providing & Fixing 4040 membrane for (250 LPH RO-2) Make DOW, Filmtech etc. |
| 23 | Providing & Fixing 4 of UF filter for (250 LPH RO-4) Make DOW, Filmtech etc. |
| 24 | Providing & Fixing of Multyport Valve 20 NB for (250LPH RO-4) of 3 in 1 position |
| 25 | Back Washing And Visit After Overhauling twice in a month (07 No 5000 GPH IRP-21 +4 No 250 LPH RO-32+10 No 60/50 LPH RO -80 ). |
| 26 | Add Fixing/Service Charge for (For 04 No 250 LPH ROas per direction of engineer in charge. |
| 27 | Add Fixing/Servicing Charge |