| 1 | Supply of all materials and accessories to carry out the surface/concealed conduit wiring by using suitable size of PVC conduct 2 runs of 4 Sq.mm for Phases and Neutral and 1 run of 2.5 sq. mm. for Earth FR PVC insulated unsheathed copper conductor wires for AC circuit circuits through connected junction/inspection boxes along with terminations to individual AC circuit as per technical specification. |
| 2 | Wiring of above Item No.1 as per technical specification. |
| 3 | Supply of all materials and accessories to carry out the surface/concealed conduit wiring by using suitable size of PVC conduct 3 runs 2.5 Sq.mm FR PVC insulated unsheathed copper conductor wires for Phase, Neutral and Earth. lighting circuits for fans, tube lights and power circuit for 15A/5A socket etc. through connected junction/ inspection boxes along with terminations wherever necessary. The wiring from DB to switch board as per technical specification. |
| 4 | Wiring of above Item No.3 as per technical specification. |
| 5 | Supply of all other materials and accessories to carry out the surface/concealed conduit wiring by using suitable size of PVC conduct 3 runs 1.5 Sq.mm FR PVC insulated wires for Phase, Neutral and Earth. The unsheathed copper conductor wires for fans, tube lights individual point control etc, through connected junction/ inspection boxes including terminations wherever necessary from sub switch board to individual points for light fittings and fans as per technical specification. |
| 6 | Wiring of above Item No.5 as per technical specification. |
| 7 | Supply of one number 20A, DP, MCB with suitable type of FRP/PVC enclosure for AC. (C – Characteristics - MCB) for all AC units. |
| 8 | Installation of above Item No.7 for all AC units as per specification. |
| 9 | Supply of all materials and accessories to carry out with 3 Nos.5A flush modular type switch and 3 Nos. socket (as one set) outlet along with base plates including its supply along with suitable box for computer plug instead of gang boxes. |
| 10 | Installation of above Item No.9 for all computer plug as per specification. |
| 11 | Supply of all materials and accessories for 15A/5A flush modular type switch with socket (as one set) outlet along with base plates and indication including its supply along with suitable box for all units and internal wiring of wiring to the plug. The socket may be separate / combination to switch board. |
| 12 | Installation of above Item No.11 for all plug points as per specification. |
| 13 | Supply of all materials and accessories for 5 A flush modular type switch with socket (as one set) outlet along with base plates and indication including its supply along with suitable box for all units and internal wiring to the plug. The socket may be separate / combination of switch board. |
| 14 | Installation of above Item No.13 for all plug points as per specification. |
| 15 | Supply of all materials and accessories of 5 Amps switch to be mounted in the switch board itself including the supply of 5 Amps modular switch for each control of Fans and Light circuits with all other accessories as per technical specification. |
| 16 | Installation of above Item No.15 for all points as per specification. |
| 17 | Supply of 4 feet 2 x 18 LED fittings with LED Tube light with all other accessories as per technical specification.(Mirror optic type) |
| 18 | Installation of above Item No.17as per specification. |
| 19 | Supply of 400 mm sweep, polypropylene plastic blade, powder coated metal body and guards wall mounting high speed fan with speed control and all other accessories as per technical specification. |
| 20 | Installation and testing of above Item No.19as per specification. |
| 21 | Supply of 400 mm sweep, polypropylene plastic blade, powder coated metal body and guards pedestal type high speed fan with speed control and all other accessories as per technical specification. |
| 22 | Installation and testing of above Item No.21as per specification. |
| 23 | Testing and commissioning of theentire wiring system and all othercircuit breakers and produced the test certificate |
| 24 | b) Installation |