|
| 1 | Surface excavation n.exc 30cm deep & averaging 15cm deep and getting out in any type of soil complete all as specified and directed. |
| 2 | Supply good earth fit for vegetation and spreding/ leveling the same as required at site mixed with manure or sludge in the reqired ratio flooding with water dressing including removal of rubbishwith all leads and lifts to the satisfaction of Engr-in-Charge and complete all as specified and directed. Note : Cost of manure /sludge has been included in the quoted rate. Nothing Paid extra. |
| 3 | M&L for Grassing with selection No 1\" grass including watering and maintenance of the lawn till the grass form a thick layer lawn freefrom weeds and fit for moving in rows 7.5 cm apart in eitherdirection. (Note:- The rate includes for supply of grass \"selection No 1\" also) complete all as specified and directed. |
| 4 | Structural trees:-M&L for digging holes 1.0m dia and 1.0m deep and removing excavated soil to a distance n. exc 50m away and filling with good earth and cattle manures in 4:1 ratio, and mixing chloropyriphos -20% EC in the required ratio. Supply and planting of approved sapling, sapling should be healthy grown up with good root system and minimum 4 feet height from ground level, after plantation maintanance of plant flooding with water including watering, deweeding, loosening of soil fortnightly spraying of insecticid if required and cleaning of any type of vegetation in and around the plantation area for a period of one month. Plant variety will be very well established over adequately nourished and to be maintained in a specific shape and size out of the plant Cyrus/bottel/palams/Ficus/Benhjamina/Ashoka/ yucca/Phoenix/Noiina/Furcarial (Minimum height 04 feet from ground level ), complete all as directed.Note: Cost of manure /sludge has been included in the quoted rate. Nothing Paid extra. |
| 5 | M&L for developing planting red hedges of height 30 cm and above, 30 cm apart saplings including excavation in trenches to a width of 45 cm and depth 45 cm removed excavated soil to a distance n. exc 50m and filling the trenches with mixture of vermi compost/ cattle manure and good earth in propotion of 2:3 and mixing of chloropyriphos -20% EC with required ratio including watering, manuring for pernnial plants complete all as specified and directed. |
| 6 | M&L forContinuous brick edging with burnt clay old size bricks sub class B in edging with width equal to the depth of the brick laid dry on edge including earthwork complete all as specified and directed. |
| 7 | Supply & fixing Fancy type bib taps cast copper alloywith crutch or butterfly handle, screwed down, screwed for iron pipe or for brass ferrule of 15mm bore, complete all as specified & directed. |
| 8 | Supply, fixing and testing 20 mm bore, tubes medium grade, galvanized with all fittings and laid in trenches complete all as specified & directed |
| 9 | M&L for welded steel wire fabric fixed to wood or steel members weight not exc 4 kg per Sqm complete all as specified & directed |
| 10 | M&L for hand rails half round or other stock section or core for wooden hand rails stright portation drilled and countersunk for blausters runing bar for door balusters nosing to steps including embeding in concrete and screwing etc wind ties for roof (40mmx6mm) including seurcing bolts posts and struts in fencing including cutting to top to shape as directed drilling holes notching for wire mess etc including all neccesary drilling bolting or revating etc and similar work conforming to Fe-290 Gde E-165 complete all as specified and directed. |
| 11 | M&L forpreparation of new or previously untreated steel surface of any description over 10cm width or girth not otherwised described and applying two coat of synthetic enamel paint over and including a coat of red oxide primer complete all as specified and directed. |
| 12 | Notes :- (a) The contract sum shall be arrived at after deduction of amount of Schedule of Credit. (NIL). (b) PERFORMANCE SECURITY :- (Refer condition 19 of IAFW-2249)The performance security for an amount equivalent to 3% (Three percent) of the acceptedcontract sum shall be delivered by the successful bidder immediately after the date of intimation letter of acceptance and all provisions shall be applicable as per condition 19 of IAFW 2249. |