Supply Of Bogie Bolster Arrgt. To Drg. No. Icf/Mrvbogie Bolster Arrgt. To Drg. No. Icf/Mrv,Bogie Bolster Arrgt. To Drg. No. Icf/Mrvc/M-0-4-001/Col.I, Alt-L & Rdso Specn.C-9202 Rev.02.`The Requirements As Per Icf/Md/Specn.147, Issue Status: 01, Rev-02 WithAmd. No.:01. Note: Item Shall Be Suitably Packed To Avoid Ingress Of Water In CenterPivot Housing And Spigot Housing. Threaded Air Connection At Bolster End Shall BeClosed. Bio-Degradable Plastic/Wooden Covers May Be Used For Closing. AllMachined Areas Shall Be Coated With Grease [Lithium Base] Before Packing. SpecialCondition:Paint Scheme Shall Be As Per Drawing. Firm To Supply The Bogie BolsterWith Suitable Packing So That The Bogie Bolster Parts Like C.P. Pin Housing SideBearing Flange, Damper Bracket, Reservoir Bracket, Leveling Valve Fixing BracketAnd Spigot Housing Are Not Damaged During Transportation/Handling/Storage.(ItemIs Reserved For Icf Approved Sources Only)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.