Supply And Commissioning Of Various Equipment For Augmentation Of Dry Dock Slipway Phase Iii At Naval Dockyard, Visakhapatnam Supply And Commissioning Of Various Equipment For Augmentation Of Dry Dock Slipway Phase Iii At Naval Dockyard, Visakhapatnam , Fabrication And Supply Of Cast Iron ( Ci ) Weights ( 2.5 Ton Each ) As Per Drawing Enclosed And As Specified In Para 3.1Of Part Ii Of Rfp. , Fabrication And Supply Of Dock Blocks As Per Drawing Enclosed And As Specified In Para 3.2Of Part Ii Of Rfp. , Fabrication And Supply Of Keel Beams As Per Drawing Enclosed And As Specified In Para 3.3Of Part Ii Of Rfp. , Fabrication And Supply Of Wedge Blocks As Per Drawing Enclosed And As Specified In Para 3.4Of Part Ii Of Rfp. , Fabrication And Supply Of Wedges For Slipway As Per Drawing Enclosed And As Specified In Para 3.5Of Part Ii Of Rfp. , Fabrication, Supply, Installation And Trials Of Berthing Trollies As Per Drawing Enclosed And As Specified In Para 3.6Of Part Ii Of Rfp. , Fabrication, Installation And Trials Of 600 Ton Transborder Along With Associated Ship Guides And 08 Sets Of Under-Carriages As Per Drawing Enclosed And As Specified In Para 3.7Of Part Ii Of Rfp. , Replacement, Supply, Installation And Commissioning Of 20 Ton Winches Along With Associated Control Panels Located At Winch House-Slipway As Specified In Para 3.8Of Part Ii Of Rfp. , Supply, Installation, Testing And Commissioning Of 25 Ton Winches And Associated Control Panelslocated At Winch House-Slipway As Specified In Para 3.9Of Part Ii Of Rfp. , Up-Gradation Of Existingcapstans To 20 Ton Capacity Located Within Dry Dock As Per Details Mentioned At Enclosure 28 & 29 And As Specified In Para 3.10Of Part Ii Of Rfp. , Supply Of 10 Ton Pick & Carry Gangway-Trestle Handler As Specified In Para 3.11Of Part Ii Of Rfp. , Standard Accessories For Sl No 1.01 To 1.11, If Any ( Refer To Para 13 Of Part Ii ) , Twoyears Operation & Maintenance Sparesfor Sl No 1.01 To 1.11, If Any ( Refer To Para 14 Of Part Ii ) , Special Maintenance Toolsand Test Equipment For Sl No 1.01 To 1.11, If Any ( Refer To Para 15 Of Part Ii ) , Technical Literature / Certificates / Documentation For Sl No 1.01 To 1.11, If Any ( Refer To Para 16 Of Part Ii ) , Acceptance, Testing, Trials And Commissioning Charges For Sl No 1.01 To 1.11, If Any ( Refer To Para 20 Of Part Ii ) , Training And Positioning Of Technical Manpower For Sl No 1.01 To 1.11, If Any ( Refer To Para 11 & 12 Of Part Ii ) , Any Other Item Such As Transportation, Insurance, Freight, Packing Etc , Provisional Work: Inspection And Renewal Of Slipway Rails Including Associated Civil Works , Note: Provisional Work Shall Be Considered For Evaluation Of Price Bids. However, The Work Shall Be Specifically Ordered By The Bidder