Power Development Department has published Rate Contract Of Maintenance Or Emergent Works Of Ht And Lt Distribution Network Including Sub Stations In Various Sub Divisions Of Jpdcl Division, Reasi Jpdcl For The Fy 2021-22.- 1 Loading Of Poles 2 Pcc Pole ( 7.50M - 8.0M ) Long 3 Pcc Pole . Submission Date for this Tender is 02-11-2021. Coats and Jackets Tenders in DISTRICT REASI Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-Oct-2021 | Time Extension | Date | 02-11-2021 |
Sl. No. | Item Description |
1 | Loading of Poles |
2 | PCC Pole (7.50m - 8.0m) Long |
3 | PCC Pole (9.00m - 10.0m) Long |
4 | PCC Pole above 10Mtr. |
5 | ST Pole (7.5 m- 8.0m)Long |
6 | ST Pole (9.0m - 10.0m) Long |
7 | ST Pole above 10Mtr. |
8 | Unloading of pole at road side and its carriage upto 25 Mtr. |
9 | PCC Pole (7.50m - 8.0m) Long |
10 | PCC Pole (9.0 m- 10.0 m) Long |
11 | PCC Pole (Above 10.0 m) Long |
12 | ST Pole (7.5 m- 8.0m)Long |
13 | ST Pole (9.0m - 10.0m) Long |
14 | ST Pole (Above 10.0m) Long |
15 | Dragging/ Manual carriage of pole to site of work upto first 100 Mtr. |
16 | PCC Pole (7.50m - 8.0m) Long |
17 | PCC Pole (9.0 m- 10.0 m) Long |
18 | PCC Pole (Above 10.0 m) Long |
19 | ST Pole (7.5 m- 8.0m)Long |
20 | ST Pole (9.0m - 10.0m) Long |
21 | ST Pole (Above 10.0m) Long |
22 | Dragging/ Manual carriage of pole to site of work for everysubsequent50 Mtr. |
23 | PCC Pole (7.50m - 8.0m) Long |
24 | PCC Pole (9.0 m- 10.0 m) Long |
25 | PCC Pole (Above 10.0 m) Long |
26 | ST Pole (7.5 m- 8.0m)Long |
27 | ST Pole (9.0m - 10.0m) Long |
28 | ST Pole (Above 10.0m) Long |
29 | Loadingof line material. |
30 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
31 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
32 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
33 | Unloading and manual carriage of line materialupto 25 Mtr. |
34 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
35 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
36 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
37 | Manual carriage of line material to site of work beyond 25 Mtr. for first 100 Mtr . |
38 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
39 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
40 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
41 | Carriage of line material manually to site of work for every additional 50 Mtr or part thereof. |
42 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
43 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
44 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
45 | Erection of pole with X-arm/U-Clamp ( with plantation depth equal ot 1/6th of the pole length) for HT/LT including pit excavation in all soil as per REC Standards ammended upto date. |
46 | PCC Pole 7.5 Mtr. Long |
47 | PCC Pole 8 Mtr. Long |
48 | PCC Pole 9 Mtr. Long |
49 | ST Pole 7.5 Mtr. Long |
50 | ST Pole 8 Mtr. Long |
51 | ST Pole 9 Mtr. Long |
52 | Straightening of tilted pole |
53 | PCC Pole 7.5 Mtr. Long |
54 | PCC Pole 8 Mtr. Long |
55 | PCC Pole 9 Mtr. Long |
56 | ST Pole 7.5 Mtr. Long |
57 | ST Pole 8 Mtr. Long |
58 | ST Pole 9 Mtr. Long |
59 | Re-erection of uprootred Poles |
60 | PCC Pole 7.5 Mtr. Long |
61 | PCC Pole 8 Mtr. Long |
62 | PCC Pole 9 Mtr. Long |
63 | ST Pole 7.5 Mtr. Long |
64 | ST Pole 8 Mtr. Long |
65 | ST Pole 9 Mtr. Long |
66 | Laying , Stringing of A.C.S.R Conductor. |
67 | A.C.S.R conductorup to 50 mm² (Squirrel / Weasel / Rabbit) |
68 | A.C.S.R conductor 100mm² (Dog) |
69 | Re-stringing/Tightening of snapped /loose conductor |
70 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
71 | A.C.S.R conductor 100mm² (Dog) |
72 | Dismentling of overheated/Damaged/ worn outConductor. |
73 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
74 | A.C.S.R conductor 100mm² (Dog) |
75 | Erection of guy rod complete |
76 | LT Line |
77 | HT Line |
78 | Dismentling of Existing/ broken/under size pole for replacement/Re-alingment. |
79 | PCC Pole 7.5 Mtr. Long |
80 | PCC Pole 8 Mtr. Long |
81 | PCC Pole 9 Mtr. Long |
82 | ST Pole 7.5 Mtr. Long |
83 | ST Pole 8 Mtr. Long |
84 | ST Pole 9 Mtr. Long |
85 | Fixing of Jumper sets |
86 | HT Line |
87 | LT Line |
88 | Laying and stringing of overhead LT/11 KV PVC/XLPE Insulated cable |
89 | Upto 16 mm² - 35mm² |
90 | Above 35mm² - 70mm² |
91 | Above70mm² - 120mm² |
92 | Earthing |
93 | Spike Earthing |
94 | Pipe Earthing |
95 | Survey, Route alignment |
96 | HT Line |
97 | LT Line |
98 | Branch Cutting |
99 | Route clearance for corridor of 5 Mtr. |
100 | Fixing of pre fabricated bracket and cross arm bed for placement of Transformer |
101 | Guard Netting |
102 | Installation/ Erection of equipments |
103 | L.A Set |
104 | D.O Set |
105 | Link Set |
106 | G.O Set |
107 | H.G Set |
108 | Iron work such as fabrication of steel work. |
109 | Drilling of holes |
110 | Loading of 11/0.4 KV Distribution transformer |
111 | 25 KVA |
112 | 63 KVA |
113 | 100 KVA |
114 | 160 KVA |
115 | 200 KVA |
116 | 250 KVA |
117 | 300 KVA |
118 | 400 KVA |
119 | 500 KVA |
120 | 630 KVA |
121 | Unloading of 11/0.4 KV Distribution transformer |
122 | 25 KVA |
123 | 63 KVA |
124 | 100 KVA |
125 | 160 KVA |
126 | 200 KVA |
127 | 250 KVA |
128 | 300 KVA |
129 | 400 KVA |
130 | 500 KVA |
131 | 630 KVA |
132 | Draggingof 11/0.4 KV Distribution transformer upto first 50 Mtr. |
133 | 25 KVA |
134 | 63 KVA |
135 | 100 KVA |
136 | 160 KVA |
137 | 200 KVA |
138 | 250 KVA |
139 | 300 KVA |
140 | 400 KVA |
141 | 500 KVA |
142 | 630 KVA |
143 | Draggingof 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. |
144 | 25 KVA |
145 | 63 KVA |
146 | 100 KVA |
147 | 160 KVA |
148 | 200 KVA |
149 | 250 KVA |
150 | 300 KVA |
151 | 400 KVA |
152 | 500 KVA |
153 | 630 KVA |
154 | Mounting of Transformer on X-arm bed including HV and Earth connections. |
155 | Upto and including 25 KVA |
156 | Above 25 KVA upto and including 100 KVA |
157 | Above 100 KVA upto and including 250 KVA |
158 | Mounting of Transformer on plateform including HV and Earth connections. |
159 | 300 KVA and 400 KVA |
160 | 500 KVA and 630 KVA |
161 | 1.0 MVA |
162 | Erection/ Installation of LT Cable circuit complete job. |
163 | Upto and including 25 KVA |
164 | Above 25 KVA upto and including 100 KVA |
165 | Above 100 KVA upto and including 630 KVA |
166 | Dismentling of LT Cable circuit complete job. |
167 | Upto and including 25 KVA |
168 | Above 25 KVA upto and including 100 KVA |
169 | Above 100 KVA upto and including 630 KVA |
170 | Crimping of thimbles |
171 | 25mm2 upto 70mm2 |
172 | Above 70mm2 to 185mm2 |
173 | Above 185mm2 |
174 | Erection/ Installation of MCCB complete job |
175 | Fixing of service line. |
176 | Single phase upto 10 Mtr. |
177 | Single phase from11 Mtr. to 20 Mtr.per meter. |
178 | Single phase from 21 Mtr. to 30 Mtr.per meter. |
179 | Opening of service line and re-connection |
180 | Installation of Single Phase Energy Meter |
181 | Installation of Three Phase Energy Meter |
182 | Laying and Stringing of 11 KV AB cable |
183 | 25,35 and 50 mm2 |
184 | 70, 95 and 120 mm2 |
185 | 150, 185 mm2and above |
186 | Laying and Stringing of LT AB cable |
187 | 25,35 and 50 mm2 |
188 | 70, 95 and 120 mm2 |
189 | 150 and 185 mm2 |
190 | 240 and 300 mm2 |
191 | Installation of CT/PT Unit alongwith Meter(Complete job) |
192 | Fixing of heat shrinkable outdoor 11 KV Cable Kits |
193 | Fixing of heat shrinkable LT Cable Kits |
194 | Fixing of danger Plates |
195 | Fixing of Anti Climbing Device |
196 | Painting ofMS crossarms, braces and clampwith one basecoat and two coats of aluminumor other paint |
197 | Painting of Steel Tubular poles including cross arm& clamp etc. with one basecoat and two coats of aluminumor other paint |
198 | 8 Mtr long |
199 | 9 Mtr long |
200 | 11 Mtr long |
201 | Fixing of spacersfor LT lines |
202 | For 5 wiresystem |
203 | For 4 wire system |
204 | For 3 wire system |
205 | Installation of Meter Board/Meter Box including MCCB/Main Switch |
206 | Un-reeling and making of bundles of ACSR Conductor |
207 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
208 | A.C.S.R conductor 100mm² (Dog) |
209 | Erection of MS cross arm |
210 | up to 3feet long |
211 | above 3 feet to 6 feet long |
212 | above 6 feet to 10 feet long |
213 | Erection of MS V-cross arm |
214 | Fixing of Braces |
215 | Fixing of HTPin insulator |
216 | Fixing of LT Pin/Shackle insulator |
217 | Fixing of Disc insulator |
218 | Fixing of Top clamp for pin insulator (HT)/ PG clamp |
219 | Fixing of U/D clamp for LT insulators |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail