|
| 1 | Loading of Poles |
| 2 | PCC Pole (7.50m - 8.0m) Long |
| 3 | PCC Pole (9.00m - 10.0m) Long |
| 4 | PCC Pole above 10Mtr. |
| 5 | ST Pole (7.5 m- 8.0m)Long |
| 6 | ST Pole (9.0m - 10.0m) Long |
| 7 | ST Pole above 10Mtr. |
| 8 | Unloading of pole at road side and its carriage upto 25 Mtr. |
| 9 | PCC Pole (7.50m - 8.0m) Long |
| 10 | PCC Pole (9.0 m- 10.0 m) Long |
| 11 | PCC Pole (Above 10.0 m) Long |
| 12 | ST Pole (7.5 m- 8.0m)Long |
| 13 | ST Pole (9.0m - 10.0m) Long |
| 14 | ST Pole (Above 10.0m) Long |
| 15 | Dragging/ Manual carriage of pole to site of work upto first 100 Mtr. |
| 16 | PCC Pole (7.50m - 8.0m) Long |
| 17 | PCC Pole (9.0 m- 10.0 m) Long |
| 18 | PCC Pole (Above 10.0 m) Long |
| 19 | ST Pole (7.5 m- 8.0m)Long |
| 20 | ST Pole (9.0m - 10.0m) Long |
| 21 | ST Pole (Above 10.0m) Long |
| 22 | Dragging/ Manual carriage of pole to site of work for everysubsequent50 Mtr. |
| 23 | PCC Pole (7.50m - 8.0m) Long |
| 24 | PCC Pole (9.0 m- 10.0 m) Long |
| 25 | PCC Pole (Above 10.0 m) Long |
| 26 | ST Pole (7.5 m- 8.0m)Long |
| 27 | ST Pole (9.0m - 10.0m) Long |
| 28 | ST Pole (Above 10.0m) Long |
| 29 | Loadingof line material. |
| 30 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
| 31 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
| 32 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
| 33 | Unloading and manual carriage of line materialupto 25 Mtr. |
| 34 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
| 35 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
| 36 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
| 37 | Manual carriage of line material to site of work beyond 25 Mtr. for first 100 Mtr . |
| 38 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
| 39 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
| 40 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
| 41 | Carriage of line material manually to site of work for every additional 50 Mtr or part thereof. |
| 42 | A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog |
| 43 | M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire |
| 44 | Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set |
| 45 | Erection of pole with X-arm/U-Clamp ( with plantation depth equal ot 1/6th of the pole length) for HT/LT including pit excavation in all soil as per REC Standards ammended upto date. |
| 46 | PCC Pole 7.5 Mtr. Long |
| 47 | PCC Pole 8 Mtr. Long |
| 48 | PCC Pole 9 Mtr. Long |
| 49 | ST Pole 7.5 Mtr. Long |
| 50 | ST Pole 8 Mtr. Long |
| 51 | ST Pole 9 Mtr. Long |
| 52 | Straightening of tilted pole |
| 53 | PCC Pole 7.5 Mtr. Long |
| 54 | PCC Pole 8 Mtr. Long |
| 55 | PCC Pole 9 Mtr. Long |
| 56 | ST Pole 7.5 Mtr. Long |
| 57 | ST Pole 8 Mtr. Long |
| 58 | ST Pole 9 Mtr. Long |
| 59 | Re-erection of uprootred Poles |
| 60 | PCC Pole 7.5 Mtr. Long |
| 61 | PCC Pole 8 Mtr. Long |
| 62 | PCC Pole 9 Mtr. Long |
| 63 | ST Pole 7.5 Mtr. Long |
| 64 | ST Pole 8 Mtr. Long |
| 65 | ST Pole 9 Mtr. Long |
| 66 | Laying , Stringing of A.C.S.R Conductor. |
| 67 | A.C.S.R conductorup to 50 mm² (Squirrel / Weasel / Rabbit) |
| 68 | A.C.S.R conductor 100mm² (Dog) |
| 69 | Re-stringing/Tightening of snapped /loose conductor |
| 70 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
| 71 | A.C.S.R conductor 100mm² (Dog) |
| 72 | Dismentling of overheated/Damaged/ worn outConductor. |
| 73 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
| 74 | A.C.S.R conductor 100mm² (Dog) |
| 75 | Erection of guy rod complete |
| 76 | LT Line |
| 77 | HT Line |
| 78 | Dismentling of Existing/ broken/under size pole for replacement/Re-alingment. |
| 79 | PCC Pole 7.5 Mtr. Long |
| 80 | PCC Pole 8 Mtr. Long |
| 81 | PCC Pole 9 Mtr. Long |
| 82 | ST Pole 7.5 Mtr. Long |
| 83 | ST Pole 8 Mtr. Long |
| 84 | ST Pole 9 Mtr. Long |
| 85 | Fixing of Jumper sets |
| 86 | HT Line |
| 87 | LT Line |
| 88 | Laying and stringing of overhead LT/11 KV PVC/XLPE Insulated cable |
| 89 | Upto 16 mm² - 35mm² |
| 90 | Above 35mm² - 70mm² |
| 91 | Above70mm² - 120mm² |
| 92 | Earthing |
| 93 | Spike Earthing |
| 94 | Pipe Earthing |
| 95 | Survey, Route alignment |
| 96 | HT Line |
| 97 | LT Line |
| 98 | Branch Cutting |
| 99 | Route clearance for corridor of 5 Mtr. |
| 100 | Fixing of pre fabricated bracket and cross arm bed for placement of Transformer |
| 101 | Guard Netting |
| 102 | Installation/ Erection of equipments |
| 103 | L.A Set |
| 104 | D.O Set |
| 105 | Link Set |
| 106 | G.O Set |
| 107 | H.G Set |
| 108 | Iron work such as fabrication of steel work. |
| 109 | Drilling of holes |
| 110 | Loading of 11/0.4 KV Distribution transformer |
| 111 | 25 KVA |
| 112 | 63 KVA |
| 113 | 100 KVA |
| 114 | 160 KVA |
| 115 | 200 KVA |
| 116 | 250 KVA |
| 117 | 300 KVA |
| 118 | 400 KVA |
| 119 | 500 KVA |
| 120 | 630 KVA |
| 121 | Unloading of 11/0.4 KV Distribution transformer |
| 122 | 25 KVA |
| 123 | 63 KVA |
| 124 | 100 KVA |
| 125 | 160 KVA |
| 126 | 200 KVA |
| 127 | 250 KVA |
| 128 | 300 KVA |
| 129 | 400 KVA |
| 130 | 500 KVA |
| 131 | 630 KVA |
| 132 | Draggingof 11/0.4 KV Distribution transformer upto first 50 Mtr. |
| 133 | 25 KVA |
| 134 | 63 KVA |
| 135 | 100 KVA |
| 136 | 160 KVA |
| 137 | 200 KVA |
| 138 | 250 KVA |
| 139 | 300 KVA |
| 140 | 400 KVA |
| 141 | 500 KVA |
| 142 | 630 KVA |
| 143 | Draggingof 11/0.4 KV Distribution transformer for every subsequent 10 Mtr. |
| 144 | 25 KVA |
| 145 | 63 KVA |
| 146 | 100 KVA |
| 147 | 160 KVA |
| 148 | 200 KVA |
| 149 | 250 KVA |
| 150 | 300 KVA |
| 151 | 400 KVA |
| 152 | 500 KVA |
| 153 | 630 KVA |
| 154 | Mounting of Transformer on X-arm bed including HV and Earth connections. |
| 155 | Upto and including 25 KVA |
| 156 | Above 25 KVA upto and including 100 KVA |
| 157 | Above 100 KVA upto and including 250 KVA |
| 158 | Mounting of Transformer on plateform including HV and Earth connections. |
| 159 | 300 KVA and 400 KVA |
| 160 | 500 KVA and 630 KVA |
| 161 | 1.0 MVA |
| 162 | Erection/ Installation of LT Cable circuit complete job. |
| 163 | Upto and including 25 KVA |
| 164 | Above 25 KVA upto and including 100 KVA |
| 165 | Above 100 KVA upto and including 630 KVA |
| 166 | Dismentling of LT Cable circuit complete job. |
| 167 | Upto and including 25 KVA |
| 168 | Above 25 KVA upto and including 100 KVA |
| 169 | Above 100 KVA upto and including 630 KVA |
| 170 | Crimping of thimbles |
| 171 | 25mm2 upto 70mm2 |
| 172 | Above 70mm2 to 185mm2 |
| 173 | Above 185mm2 |
| 174 | Erection/ Installation of MCCB complete job |
| 175 | Fixing of service line. |
| 176 | Single phase upto 10 Mtr. |
| 177 | Single phase from11 Mtr. to 20 Mtr.per meter. |
| 178 | Single phase from 21 Mtr. to 30 Mtr.per meter. |
| 179 | Opening of service line and re-connection |
| 180 | Installation of Single Phase Energy Meter |
| 181 | Installation of Three Phase Energy Meter |
| 182 | Laying and Stringing of 11 KV AB cable |
| 183 | 25,35 and 50 mm2 |
| 184 | 70, 95 and 120 mm2 |
| 185 | 150, 185 mm2and above |
| 186 | Laying and Stringing of LT AB cable |
| 187 | 25,35 and 50 mm2 |
| 188 | 70, 95 and 120 mm2 |
| 189 | 150 and 185 mm2 |
| 190 | 240 and 300 mm2 |
| 191 | Installation of CT/PT Unit alongwith Meter(Complete job) |
| 192 | Fixing of heat shrinkable outdoor 11 KV Cable Kits |
| 193 | Fixing of heat shrinkable LT Cable Kits |
| 194 | Fixing of danger Plates |
| 195 | Fixing of Anti Climbing Device |
| 196 | Painting ofMS crossarms, braces and clampwith one basecoat and two coats of aluminumor other paint |
| 197 | Painting of Steel Tubular poles including cross arm& clamp etc. with one basecoat and two coats of aluminumor other paint |
| 198 | 8 Mtr long |
| 199 | 9 Mtr long |
| 200 | 11 Mtr long |
| 201 | Fixing of spacersfor LT lines |
| 202 | For 5 wiresystem |
| 203 | For 4 wire system |
| 204 | For 3 wire system |
| 205 | Installation of Meter Board/Meter Box including MCCB/Main Switch |
| 206 | Un-reeling and making of bundles of ACSR Conductor |
| 207 | A.C.S.R conductorup to 50mm² (Squirrel / Weasel / Rabbit) |
| 208 | A.C.S.R conductor 100mm² (Dog) |
| 209 | Erection of MS cross arm |
| 210 | up to 3feet long |
| 211 | above 3 feet to 6 feet long |
| 212 | above 6 feet to 10 feet long |
| 213 | Erection of MS V-cross arm |
| 214 | Fixing of Braces |
| 215 | Fixing of HTPin insulator |
| 216 | Fixing of LT Pin/Shackle insulator |
| 217 | Fixing of Disc insulator |
| 218 | Fixing of Top clamp for pin insulator (HT)/ PG clamp |
| 219 | Fixing of U/D clamp for LT insulators |