|
| 1 | Providing and applying plaster of paris of 2 mm thickness, of approved brand and manufacturer, on RCC Cieling surface to prepare the surface even and smooth,incl stagging/scaffolding etc complete job. |
| 2 | Applying one or two coats of water thinnable cement primer of approved brand and manufacture on wall surface incl. stagging/ scaffolding complete |
| 3 | Painting with acrylic emulsion paint of approved brand and manufacture to give an even shade. Two or more coats on new work incl. stagging/scaffolding complete. |
| 4 | Buffing/polishing/cleaning of Stainless steelstaircase of academic block at IMPA,sgr using suitable chemicals ,complete job |
| 5 | Supplying and fixing of floor carpet (Graphic loop pile) of approved makein the Auditorium of Academic Block at IMPA,srinagar. The said carpet is to be fixed on Thermo foam 10 mm thick incl.cost of foam,adhesive(fevicol) etc, complete job |
| 6 | Providing and Fixing ofBrass signboard with writing letters engraved in black colour outside the training Halls,Library and Auditorium of the newly constructed Academic Block at IMPA,Sgr complete job. |
| 7 | Providing and Fixing of Aluminium composite panel (ACP) signboard outside thenewly constructed Academic Block at IMPA,Sgrinclscaffolding etc complete job . |
| 8 | Providing and Fixing of3D stainless steel LED illuminated letters ( of size more than 8 inch depending upon the space available ) in position and aligned in required orientation on the ACP signboardoutside thenewly constructed Academic Block at IMPA,Sgr incl p/f of electric supply line to the arrangement and scaffolding etc complete job.The measurement shall be taken in running heightof letters |
| 9 | Providing and Fixing of IMPARD Logo outside thenewly constructed Academic Block at IMPA,Sgr having writing letters of 3D stainless steel LED illuminated letters of size one inch or depending upon the space availableinclscaffolding etc complete job . |
| 10 | Providing and Fixing of G.I wiremesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm to be fixed on wooden framein the gables of attic of academic block at IMPARD, srinagar incl.P/Fixing of beading etc complete job |
| 11 | Lifting of CGI sheets (used as well as unused) and usedcut pieces of woodand other scrap items from the IMPA&RDComplex,Sgr and shifting to the BTF Store of JKPCC Ltd , pampore using mechanical transport truck (15 Km) incl. loading and unloading and cleaning of site, complete job |
| 12 | Applying 15 mm thick cement plaster as repair work in 1:4 mix including all material, scaffoldingetc.Complete job. |
| 13 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length using first class deodar wood incl paint work,complete |
| 14 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws using first Class deodar wood (matching with already door shutters fixed) incl paint work ,complete |
| 15 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete of size 250x10 mm. |
| 16 | Providing and fixing bright finished brass handles with screws etc of size- 125 mm complete. |
| 17 | Providing and fixing bright finished brass door latch with necessary screws etc of size-300x16x5 mm,complete |
| 18 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete |
| 19 | Providing and fixing ball valve (brass) of approved quality,High or low pressure, with plastic floats complete (32 mm ) |
| 20 | Making connection of G.I. distribution branch with G.I. main offollowing sizes by providing and fixing Tee, including cutting and threading the pipe etc 25 to 40 mm nominal borecomplete. |
| 21 | Note: 1). The colour and size of lettersof the complete arrangement of signed board shall be in accordance of the directions of the site engineer.2). The above stated floor carpet shall be fixed only after the approval of site engineer. |