Defence Statutory Bodies & Commissions/Committees Closing in 0 days TDR #29520536

Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With

Issued by Statutory Bodies & Commissions/Committees · , Assam
Tender Value
Ref. Documents
Estimated cost
Bid Submission
19 Oct 2021
0 days left
EMD
62420
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge. ( I ) 20 Kvadg Set, 415 Volt, 50 Hz -01 No ( Ii ) 62.5 Kva Dg Set, 415V Ac, 50Hz. - 01 No ( Iii ) 160Kva Dg Set, 415V Ac, 50Hz. - 01 No At Dwr Bldg. ( Iv ) Package Type Ac Plant 5.5Tr X 3 Nos ( 02 Nos Running And 01 No In Standby ) ( V ) Ducts. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Charge. ( Vii ) Operation Of Lt Panel Board As And When Requirednotes Applicable For Items No. 1 To 4 ( I ) Rate Quoted Shall Be Inclusive Of All Taxes, Cess, Levies As Applicable And Gst. ( Ii ) The Quoted Rate Is Inclusive Of Epf, Esic As Per Epf Act 1952 And Esi Act 1948, As Amended From Time To Time . ( Iii ) The Quoted Rate Should Also Include Superintendence, Overheads And Profit And Including All Taxes And Insert Amount To Cover All. ( Iv ) Contribution Towards Bonus, Esic &Epf Shall Be Payable Only After Submission Of Valid And Authentic Document In Support Of Payment By The Contractor. ( V ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Vi ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( Viii ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Engaging Minimum Onesemi Skilled Category Of Worker Per Shift - Outsourcing For Operation Of Ptt ( Simulator ) Ac Plant Alongwith Dg Setsin Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge.Notes:- ( I ) Dg Sets Ofcapacity160 Kva - 03 Nos ( 01 No Running And 02 Nos Standby ) ( Ii ) 3 X 11 Tr Package Type Ac Plant ( 02 Nos Running 01 No Standby ) ( Iii ) Fire Fitting Pumping Set ( Diesel Engine Pump Set 30 Hp - 01 No, Electric Driven Pump 30 Hp - 02 Nos, Jockey Pump 5 Hp - 01 No ) ( Iv ) Ducts ( V ) Operation Of Lt Panel Board As And When Required. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Chargenote:-For ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. ( Vi ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Item No. 03 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Air Conditioninginstallation Fully Computerized System At Brahmos Drdo In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur:- ( I ) Chiller Unit Complete With Compressor 180 Tr. Make:Blue Star - 03Nos ( Ii ) Primary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iii ) Secondary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iv ) Condensor Pump -15 Kw -03 Nos ( V ) Frp Cooling Tower -03 Nos ( Vi ) Hot Water Generator Pump 45 Kw - 04 Nos ( Vii ) Hot Water Generator Pump 90 Kw - 03 Nos ( Viii ) Ahu Floor Mounted-11Nos ( Bldg No-B4, B5, B6 ) ( Ix ) -Do- But Scu ( Suspended Ceiling Unit -72 No ( Bldg No-B1, B2, B3 ) ( X ) Control Panel For Ac Plant -01 No ( Xi ) Lcd Monitor 52 Complete For Monitoring All Ahus / Ac Plant Equipments -01 Nosnote:-- ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature And Humidity In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. , Item No. 04 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Pump House, Dg Set Andfire Fightingsystemin One Shifts Per Day ( 8.00 Am To 4.00 Pm ) For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur All As Directed - ( I ) Borewell With 5 Hp Submersible Pump Set. Make: Kirloskar- 02 Nos ( Ii ) Water Treatment Plant Including Iron Removal Filter, Dual Media Filter, Activated Carbon Filter & Water Softner Of 8 Cum / Hr =01 Each ( Iii ) Raw Water Pump Motor7.5 Hp= 02 Nos ( Iv ) Treated Water Pump Motor 7.5 Hp = 02 Nos ( V ) Electrical Driven Pump 75Kw / 100Hp -01 No ( Vi ) Diesel Engine Driven Pump 75Kw / 100Hp - 01 No ( Vii ) Jockey Pump Capacity 15Kw / 20Hp-01 No ( Viii ) Dg Set 500 Kva Withamf Panel Make:Powwarica- 03 Nos ( Ix ) One Computer With Lcd Monitor Completefor Fire Alarm System Monitoring Auto System With Ups 10 Kva-01 No , Item No. 05 - Supply And Fixing V Belt Of Size A-23.Make: Fenner / Dunlop / Finolex , Item No. 06 - Supply And Fixing Rotary Actuator For Ball Valve, Having Torque 5 Nm, Angular Rotaton 90 Degree, Position Time 150 Second, Ip 54 Degree Of Protection Operation Ac 24 V, Dc 24 V Operating Voltage And ( -32 Degree To 55 Degree ) Centigrade Complete All As Specificed As Directed. Make :- Siemens Or Equivalent Total Quantity : 1

BOQ

Sl. No. Item TitleItem Description
1Engaging minimum one FGm( Semi Skilled category of worker) per shiftOutsourcing for operation of Transmitter AC Plant along with DG Sets in transmitter in three shifts per day for 8 hours each shift for seven daysin a week with one Operator(semi skilled) per shift comprising of the followingPlant / Machineries / Equipmentsat AF Stn Tezpur all as directed by Engr-in-Charge.(i) 20 KVADG set, 415 volt, 50 HZ -01 No(ii)62.5 KVA DG set, 415V AC, 50Hz. - 01 No(iii) 160KVA DG set, 415V AC, 50Hz. - 01 No at DWR Bldg.(iv ) Package type AC plant 5.5TR X 3 Nos (02 Nos running and 01 No in standby)(v)Ducts.(vi)Operation of Security Lights Switches as per Time schedule given by the Engr-in-charge.(vii) Operation of LT Panel Board as and when requiredNotes applicable for items no. 1 to 4 (i) Rate quoted shall be inclusive of all taxes,cess,levies as applicable and GST.(ii) The quoted rate is inclusive of EPF,ESIC as per EPF Act 1952 and ESI Act 1948, as amended from time to time .(iii) The quoted rate should also include superintendence, overheads and profit and including all taxes and insert amount to cover all. (iv) Contribution towards Bonus, ESIC &EPF shall be payable only after submission of valid and authentic document in support of payment by the contractor.(v)The operator should record temperature, humidity for AC plant & daily DI details for DG set in the register as provided by contractor(vi) The AC plant operator must be qualified for operating the entire plant system(viii) Collect DHPP(N) from MES source( Power House) as and when required to fill in DG Set.
2Engaging minimum oneSemi Skilled category of worker per shiftOutsourcing for operation of PTT(Simulator) AC Plant alongwith DG Setsin three shifts per day for 8 hours each shift for seven daysin a week with one operator(semi skilled) per shift comprising of the followingPlant / Machineries / Equipmentsat AF Stn Tezpur all as directed by Engr-in-Charge.Notes:-(i)DG Sets ofcapacity160 KVA - 03 Nos (01 No running and 02 Nos Standby)(ii)3 X 11 TR package type AC Plant(02 Nos Running 01 No Standby)(iii )Fire Fitting Pumping Set (Diesel Engine Pump Set 30 HP - 01 No, Electric driven Pump 30 HP - 02 Nos, Jockey Pump 5 HP - 01 No)(iv) Ducts(v)Operation of LT Panel Board as and when required.(vi)Operation of Security Lights Switches as per Time schedule given by the Engr-in-chargeNote:-for (i) and (ii) please referNote (i) & (ii) of Item No. 01(iii)The operator should record temperature, humidity for AC plant & daily DI details for DG set in the register as provided by contractor(iv) The AC plant operator must be qualified for operating the entire plant system (v) In addition to above the operator shall be responsible for switching on/off of the street lights/ High Mast Lightswithin the 500mtr distance of the installations.The switching on/Off timing will be provided by the Engr-In-Charge.(vi) Collect DHPP(N) from MES source( Power House) as and when required to fill in DG Set.
3Item No. 03 Engaging minimum one FGm( Semi Skilled category of worker) per shiftOutsourcing for operation of Air ConditioningInstallation fully computerized system at Brahmos DRDO in three shifts per day for 8 hours each shift for seven daysin a week with one operator (Semi skilled) per shiftcomprising of the followingPlants / Machineries / Equipmentsat AF Stn Tezpur:- (i) Chiller unit complete with compressor 180 TR. Make:Blue Star - 03Nos(ii) Primary Pump 7.5 KW. Make - Kirloskar - 03 Nos(iii) Secondary Pump 7.5 KW. Make - Kirloskar - 03 Nos(iv) Condensor Pump -15 KW -03 Nos(v) FRP Cooling Tower -03 Nos(vi) Hot water generator pump 45 KW - 04 Nos(vii) Hot water generator pump 90 KW - 03 Nos(viii)AHU floor mounted-11Nos(Bldg No-B4,B5,B6)(ix) -do- but scu( suspended ceiling unit -72 No( Bldg No-B1,B2,B3)(x) Control panel for AC plant -01 No(xi) LCD Monitor 52\"\" complete for monitoring all AHUs/AC plant equipments -01 NosNote:-- (i) and (ii) please referNote (i) & (ii) of Item No. 01(iii)The operator should record temperature and humidity in the register as provided by contractor(iv) The AC plant operator must be qualified for operating the entire plant system (v) In addition to above the operator shall be responsible for switching on/off of the street lights/ High Mast Lightswithin the 500mtr distance of the installations.The switching on/Off timing will be provided by the Engr-In-Charge.
4Item No. 04 Engaging minimum one FGm( Semi Skilled category of worker) per shiftOutsourcing for operation of Pump House, DG set andfire fightingSystemin one shifts per day (8.00 AM to 4.00 PM) for 8 hours each shift for seven daysin a week with one Operator(semi skilled)per shiftcomprising of the followingPlants / Machineries / Equipmentsat AF Stn Tezpur all as directed -(i) Borewell with 5 HP submersible pump set. Make: Kirloskar- 02 Nos(ii) Water treatment plant including iron removal filter, dual media filter, activated carbon filter & water softner of 8 Cum/hr =01 each(iii) Raw water pump motor7.5 HP= 02 Nos(iv) Treated water pump motor 7.5 HP = 02 Nos (v) Electrical driven pump 75KW/100HP -01 No(vi) Diesel Engine driven pump 75KW/100HP - 01 No(vii) Jockey Pump capacity 15KW/20HP-01 No(viii) DG Set 500 KVA withAMF panel make:Powwarica- 03 Nos(ix) One computer with LCD monitor completefor fire alarm system monitoring auto system with UPS 10 KVA-01 No
5Item No. 05Supply and fixing V belt of size A-23.Make: Fenner/Dunlop/Finolex
6Item No. 06Supply and fixing rotary actuator for ball valve, having torque 5 Nm, angular rotaton 90 degree, position time 150 second, IP 54 degree of protection operation AC 24 V, DC 24 V operating voltage and (-32 degree to 55 degree) centigrade complete all as specificed as directed. Make :- Siemens or equivalent

AI Tender Summary

OUR REF NO 29520536
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE Ref. Documents
LAST DATE 19-10-2021
Authority
Authority Name Indian Army
Work Description Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge. ( I ) 20 Kvadg Set, 415 Volt, 50 Hz -01 No ( Ii ) 62.5 Kva Dg Set, 415V Ac, 50Hz. - 01 No ( Iii ) 160Kva Dg Set, 415V Ac, 50Hz. - 01 No At Dwr Bldg. ( Iv ) Package Type Ac Plant 5.5Tr X 3 Nos ( 02 Nos Running And 01 No In Standby ) ( V ) Ducts. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Charge. ( Vii ) Operation Of Lt Panel Board As And When Requirednotes Applicable For Items No. 1 To 4 ( I ) Rate Quoted Shall Be Inclusive Of All Taxes, Cess, Levies As Applicable And Gst. ( Ii ) The Quoted Rate Is Inclusive Of Epf, Esic As Per Epf Act 1952 And Esi Act 1948, As Amended From Time To Time . ( Iii ) The Quoted Rate Should Also Include Superintendence, Overheads And Profit And Including All Taxes And Insert Amount To Cover All. ( Iv ) Contribution Towards Bonus, Esic &Epf Shall Be Payable Only After Submission Of Valid And Authentic Document In Support Of Payment By The Contractor. ( V ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Vi ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( Viii ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Engaging Minimum Onesemi Skilled Category Of Worker Per Shift - Outsourcing For Operation Of Ptt ( Simulator ) Ac Plant Alongwith Dg Setsin Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge.Notes:- ( I ) Dg Sets Ofcapacity160 Kva - 03 Nos ( 01 No Running And 02 Nos Standby ) ( Ii ) 3 X 11 Tr Package Type Ac Plant ( 02 Nos Running 01 No Standby ) ( Iii ) Fire Fitting Pumping Set ( Diesel Engine Pump Set 30 Hp - 01 No, Electric Driven Pump 30 Hp - 02 Nos, Jockey Pump 5 Hp - 01 No ) ( Iv ) Ducts ( V ) Operation Of Lt Panel Board As And When Required. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Chargenote:-For ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. ( Vi ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Item No. 03 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Air Conditioninginstallation Fully Computerized System At Brahmos Drdo In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur:- ( I ) Chiller Unit Complete With Compressor 180 Tr. Make:Blue Star - 03Nos ( Ii ) Primary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iii ) Secondary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iv ) Condensor Pump -15 Kw -03 Nos ( V ) Frp Cooling Tower -03 Nos ( Vi ) Hot Water Generator Pump 45 Kw - 04 Nos ( Vii ) Hot Water Generator Pump 90 Kw - 03 Nos ( Viii ) Ahu Floor Mounted-11Nos ( Bldg No-B4, B5, B6 ) ( Ix ) -Do- But Scu ( Suspended Ceiling Unit -72 No ( Bldg No-B1, B2, B3 ) ( X ) Control Panel For Ac Plant -01 No ( Xi ) Lcd Monitor 52 Complete For Monitoring All Ahus / Ac Plant Equipments -01 Nosnote:-- ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature And Humidity In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. , Item No. 04 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Pump House, Dg Set Andfire Fightingsystemin One Shifts Per Day ( 8.00 Am To 4.00 Pm ) For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur All As Directed - ( I ) Borewell With 5 Hp Submersible Pump Set. Make: Kirloskar- 02 Nos ( Ii ) Water Treatment Plant Including Iron Removal Filter, Dual Media Filter, Activated Carbon Filter & Water Softner Of 8 Cum / Hr =01 Each ( Iii ) Raw Water Pump Motor7.5 Hp= 02 Nos ( Iv ) Treated Water Pump Motor 7.5 Hp = 02 Nos ( V ) Electrical Driven Pump 75Kw / 100Hp -01 No ( Vi ) Diesel Engine Driven Pump 75Kw / 100Hp - 01 No ( Vii ) Jockey Pump Capacity 15Kw / 20Hp-01 No ( Viii ) Dg Set 500 Kva Withamf Panel Make:Powwarica- 03 Nos ( Ix ) One Computer With Lcd Monitor Completefor Fire Alarm System Monitoring Auto System With Ups 10 Kva-01 No , Item No. 05 - Supply And Fixing V Belt Of Size A-23.Make: Fenner / Dunlop / Finolex , Item No. 06 - Supply And Fixing Rotary Actuator For Ball Valve, Having Torque 5 Nm, Angular Rotaton 90 Degree, Position Time 150 Second, Ip 54 Degree Of Protection Operation Ac 24 V, Dc 24 V Operating Voltage And ( -32 Degree To 55 Degree ) Centigrade Complete All As Specificed As Directed. Make :- Siemens Or Equivalent Total Quantity : 1
Basic Detail
Tender No GEM/2021/B/1586919
Bidding Type Tender
Location
City
State Assam
Key Dates
Publish Date 09 Oct 2021
Submission Date 19 Oct 2021
Open Date 19 Oct 2021
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 62420
Exemption Not Available
Document List
2752172_Boq_4.xlsx
cfe2a4f2-3e47-4f4b-ab67-38d3a0998af2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 09, 2021
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 19, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 19, 2021

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xlsx

2752172_Boq_4.xlsx

pdf

cfe2a4f2-3e47-4f4b-ab67-38d3a0998af2.pdf

TenderDetail
Loading tenders