Construction Of New Building Infrastructures At Daitari Iron Ore Mines In The District Of Keonjhar In One Package - Package -1
Tender Value
65.04 Crore
Estimated cost
Bid Submission
08 Nov 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
DAITARI → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of New Building Infrastructures At Daitari Iron Ore Mines In The District Of Keonjhar In One Package - Package -1
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil Upto 1.5m depth |
| 2 | RM Office |
| 3 | Guest House |
| 4 | 2BHK |
| 5 | 3BHK |
| 6 | Officers & Club |
| 7 | School |
| 8 | Staff hostel |
| 9 | Training hostel |
| 10 | External Development |
| 11 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil 1.5 to 3m depth |
| 12 | RM Office |
| 13 | Guest House |
| 14 | 2BHK |
| 15 | 3BHK |
| 16 | Officers & Club |
| 17 | School |
| 18 | Staff hostel |
| 19 | Training hostel |
| 20 | External Development |
| 21 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil 3.0 to 4.5m depth |
| 22 | School |
| 23 | External Development |
| 24 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil 4.5m to 6m depth |
| 25 | External Development |
| 26 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm (9”) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. |
| 27 | RM Office |
| 28 | Guest House |
| 29 | 2BHK |
| 30 | 3BHK |
| 31 | Officers & Club |
| 32 | School |
| 33 | Staff hostel |
| 34 | Training hostel |
| 35 | External Development |
| 36 | Supplying all labour, T&P for the Carriage of excavated earth by mechanical means of transport within 5.00 K.M. lead including hire and running charges of vehicles, labour charges for loading and unloading as required for the work etc. complete as per the direction of the Engineer-in-charge. |
| 37 | RM Office |
| 38 | Guest House |
| 39 | 2BHK |
| 40 | 3BHK |
| 41 | Officers & Club |
| 42 | School |
| 43 | Staff hostel |
| 44 | Training hostel |
| 45 | External Development |
| 46 | Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge. |
| 47 | RM Office |
| 48 | Guest House |
| 49 | 2BHK |
| 50 | 3BHK |
| 51 | Officers & Club |
| 52 | School |
| 53 | Staff hostel |
| 54 | Training hostel |
| 55 | External Development |
| 56 | Providing and injecting chemical emulsion for pre - constructional antitermite treatment as per IS specification and creating a chemical barrier in bottom and sides of foundation trenches, top-surface of plinth filing junction of walls and floors along with external perimeter of the building expansion joints surrounding the pipes and cables etc. complete using approved quality of chemical emulsion of requisite quantity prescribed by the manufacturer as directed by the Engineer-in-charge including cost of all materials and labour etc. complete. (Measurement should be taken as per plinth area and indemnity bond for warranty for 10 years to be furnished) |
| 57 | RM Office |
| 58 | Guest House |
| 59 | 2BHK |
| 60 | 3BHK |
| 61 | Officers & Club |
| 62 | School |
| 63 | Staff hostel |
| 64 | Training hostel |
| 65 | External Development |
| 66 | Providing & laying cement concrete of prop. (1:4:8) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 100 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. |
| 67 | RM Office |
| 68 | Guest House |
| 69 | 2BHK |
| 70 | 3BHK |
| 71 | Officers & Club |
| 72 | School |
| 73 | Staff hostel |
| 74 | Training hostel |
| 75 | External Development |
| 76 | Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 100 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge. |
| 77 | RM Office |
| 78 | Guest House |
| 79 | 2BHK |
| 80 | 3BHK |
| 81 | Officers & Club |
| 82 | School |
| 83 | Staff hostel |
| 84 | Training hostel |
| 85 | Providing and lying plain cement concrete of (1:2:4) in foundation and floors using 12 mm. Size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and of all materials and cost of all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. |
| 86 | External Development |
| 87 | P.C.C. work ofM-20 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge. Ground Floor |
| 88 | RM Office |
| 89 | Guest House |
| 90 | 2BHK |
| 91 | 3BHK |
| 92 | Officers & Club |
| 93 | School |
| 94 | Staff hostel |
| 95 | Training hostel |
| 96 | P.C.C. work ofM-20 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge.1st Floor |
| 97 | RM Office |
| 98 | Guest House |
| 99 | 2BHK |
| 100 | 3BHK |
| 101 | Officers & Club |
| 102 | School |
| 103 | Staff hostel |
| 104 | Training hostel |
| 105 | P.C.C. work ofM-20 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge.2nd Floor |
| 106 | RM Office |
| 107 | 2BHK |
| 108 | 3BHK |
| 109 | Officers & Club |
| 110 | School |
| 111 | Staff hostel |
| 112 | Training hostel |
| 113 | P.C.C. work ofM-20 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge.3rd Floor |
| 114 | 2BHK |
| 115 | 3BHK |
| 116 | Officers & Club |
| 117 | Training hostel |
| 118 | P.C.C. work ofM-20 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge.4th Floor |
| 119 | 2BHK |
| 120 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. |
| 121 | RM Office |
| 122 | Guest House |
| 123 | 2BHK |
| 124 | 3BHK |
| 125 | Officers & Club |
| 126 | School |
| 127 | Staff hostel |
| 128 | Training hostel |
| 129 | External Development |
| 130 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Upto Ground Floor lvl |
| 131 | RM Office |
| 132 | Guest House |
| 133 | 2BHK |
| 134 | 3BHK |
| 135 | Officers & Club |
| 136 | School |
| 137 | Staff hostel |
| 138 | Training hostel |
| 139 | External Development |
| 140 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. GF to 1st Floor lvl |
| 141 | RM Office |
| 142 | Guest House |
| 143 | 2BHK |
| 144 | 3BHK |
| 145 | Officers & Club |
| 146 | School |
| 147 | Staff hostel |
| 148 | Training hostel |
| 149 | External Development |
| 150 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 1st to 2nd Floor |
| 151 | RM Office |
| 152 | Guest House |
| 153 | 2BHK |
| 154 | 3BHK |
| 155 | Officers & Club |
| 156 | School |
| 157 | Staff hostel |
| 158 | Training hostel |
| 159 | External Development |
| 160 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 2nd to 3rd Floor |
| 161 | RM Office |
| 162 | Guest House |
| 163 | 2BHK |
| 164 | 3BHK |
| 165 | Officers & Club |
| 166 | School |
| 167 | Staff hostel |
| 168 | Training hostel |
| 169 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 3rd Floor to 4th |
| 170 | RM Office |
| 171 | 2BHK |
| 172 | 3BHK |
| 173 | Officers & Club |
| 174 | School |
| 175 | Staff hostel |
| 176 | Training hostel |
| 177 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 4th Floor to terrace |
| 178 | 2BHK |
| 179 | 3BHK |
| 180 | Officers & Club |
| 181 | Training hostel |
| 182 | R.C.C. work ofM-30 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For terrace to Mumty |
| 183 | 2BHK |
| 184 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills.GF to 1st Floor lvl |
| 185 | RM Office |
| 186 | Guest House |
| 187 | 2BHK |
| 188 | 3BHK |
| 189 | Officers & Club |
| 190 | School |
| 191 | Staff hostel |
| 192 | Training hostel |
| 193 | External Development |
| 194 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 1st to 2nd Floor |
| 195 | RM Office |
| 196 | Guest House |
| 197 | 2BHK |
| 198 | 3BHK |
| 199 | Officers & Club |
| 200 | School |
| 201 | Staff hostel |
| 202 | Training hostel |
| 203 | External Development |
| 204 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 2nd to 3rd Floor |
| 205 | RM Office |
| 206 | Guest House |
| 207 | 2BHK |
| 208 | 3BHK |
| 209 | Officers & Club |
| 210 | School |
| 211 | Staff hostel |
| 212 | Training hostel |
| 213 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 3rd Floor to 4th Floor |
| 214 | RM Office |
| 215 | 2BHK |
| 216 | 3BHK |
| 217 | Officers & Club |
| 218 | School |
| 219 | Staff hostel |
| 220 | Training hostel |
| 221 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For 4th Floor to terrace |
| 222 | 2BHK |
| 223 | 3BHK |
| 224 | Officers & Club |
| 225 | Training hostel |
| 226 | R.C.C. work ofM-25 for plinth beam having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. For terarce to mumty |
| 227 | 2BHK |
| 228 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)Upto Ground Floor lvl |
| 229 | RM Office |
| 230 | Guest House |
| 231 | 2BHK |
| 232 | 3BHK |
| 233 | Officers & Club |
| 234 | School |
| 235 | Staff hostel |
| 236 | Training hostel |
| 237 | External Development |
| 238 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)GF to 1st Floor lvl |
| 239 | RM Office |
| 240 | Guest House |
| 241 | 2BHK |
| 242 | 3BHK |
| 243 | Officers & Club |
| 244 | School |
| 245 | Staff hostel |
| 246 | Training hostel |
| 247 | External Development |
| 248 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)For 1st to 2nd Floor |
| 249 | RM Office |
| 250 | Guest House |
| 251 | 2BHK |
| 252 | 3BHK |
| 253 | Officers & Club |
| 254 | School |
| 255 | Staff hostel |
| 256 | Training hostel |
| 257 | External Development |
| 258 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)For 2nd to terrace Floor |
| 259 | RM Office |
| 260 | Guest House |
| 261 | 2BHK |
| 262 | 3BHK |
| 263 | Officers & Club |
| 264 | School |
| 265 | Staff hostel |
| 266 | Training hostel |
| 267 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)For 3rd Floor to 4th Floor |
| 268 | RM Office |
| 269 | 2BHK |
| 270 | 3BHK |
| 271 | Officers & Club |
| 272 | School |
| 273 | Staff hostel |
| 274 | Training hostel |
| 275 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)For 4th Floor to terrace |
| 276 | 2BHK |
| 277 | 3BHK |
| 278 | Officers & Club |
| 279 | Training hostel |
| 280 | Providing & fixing HYSD bar of FE-500of approved makes as per DTCN for RCC work of required diameter with straightening, cutting, bending, binding welding and joining (if necessary) and tying the grills and placing in position as required for R.C.C. work and providing fan hooks, hoisting, lowering and laying including cost, conveyance and of tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all heights as per the drawing, design and direction ofEngineer-in-charge. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.)For terrace to Mumty |
| 281 | 2BHK |
| 282 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C foundation, column base, mass concrete, plinth band |
| 283 | RM Office |
| 284 | Guest House |
| 285 | 2BHK |
| 286 | 3BHK |
| 287 | Officers & Club |
| 288 | School |
| 289 | Staff hostel |
| 290 | Training hostel |
| 291 | External Development |
| 292 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. Column & Beam |
| 293 | RM Office |
| 294 | Guest House |
| 295 | 2BHK |
| 296 | 3BHK |
| 297 | Officers & Club |
| 298 | School |
| 299 | Staff hostel |
| 300 | Training hostel |
| 301 | External Development |
| 302 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.Ground Floor |
| 303 | RM Office |
| 304 | Guest House |
| 305 | 2BHK |
| 306 | 3BHK |
| 307 | Officers & Club |
| 308 | School |
| 309 | Staff hostel |
| 310 | Training hostel |
| 311 | External Development |
| 312 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.1st Floor |
| 313 | RM Office |
| 314 | Guest House |
| 315 | 2BHK |
| 316 | 3BHK |
| 317 | Officers & Club |
| 318 | School |
| 319 | Staff hostel |
| 320 | Training hostel |
| 321 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.2nd Floor |
| 322 | RM Office |
| 323 | Guest House |
| 324 | 2BHK |
| 325 | 3BHK |
| 326 | Officers & Club |
| 327 | School |
| 328 | Staff hostel |
| 329 | Training hostel |
| 330 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.3rd Floor |
| 331 | RM Office |
| 332 | Guest House |
| 333 | 2BHK |
| 334 | 3BHK |
| 335 | Officers & Club |
| 336 | School |
| 337 | Staff hostel |
| 338 | Training hostel |
| 339 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.4th Floor |
| 340 | 2BHK |
| 341 | 3BHK |
| 342 | Officers & Club |
| 343 | Training hostel |
| 344 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For R.C.C floors,roof slab,landings, balcony, chajja, Shelves, shunshed. Up to height of 4.3 m.terrace |
| 345 | 2BHK |
| 346 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.Ground Floor |
| 347 | RM Office |
| 348 | Guest House |
| 349 | 2BHK |
| 350 | 3BHK |
| 351 | Officers & Club |
| 352 | School |
| 353 | Staff hostel |
| 354 | Training hostel |
| 355 | External Development |
| 356 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.1st Floor |
| 357 | RM Office |
| 358 | Guest House |
| 359 | 2BHK |
| 360 | 3BHK |
| 361 | Officers & Club |
| 362 | School |
| 363 | Staff hostel |
| 364 | Training hostel |
| 365 | External Development |
| 366 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.2nd Floor |
| 367 | RM Office |
| 368 | Guest House |
| 369 | 2BHK |
| 370 | 3BHK |
| 371 | Officers & Club |
| 372 | School |
| 373 | Staff hostel |
| 374 | Training hostel |
| 375 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.3rd Floor |
| 376 | RM Office |
| 377 | 2BHK |
| 378 | 3BHK |
| 379 | Officers & Club |
| 380 | School |
| 381 | Staff hostel |
| 382 | Training hostel |
| 383 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.4th Floor |
| 384 | 2BHK |
| 385 | 3BHK |
| 386 | Officers & Club |
| 387 | Training hostel |
| 388 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C Lintel Up to height of 4.3 m.Terrace |
| 389 | 2BHK |
| 390 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C. Stair case Up to height of 4.3 m.Ground Floor |
| 391 | RM Office |
| 392 | Guest House |
| 393 | 2BHK |
| 394 | 3BHK |
| 395 | Officers & Club |
| 396 | School |
| 397 | Staff hostel |
| 398 | Training hostel |
| 399 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C. Stair case Up to height of 4.3 m.1st Floor |
| 400 | RM Office |
| 401 | Guest House |
| 402 | 2BHK |
| 403 | 3BHK |
| 404 | Officers & Club |
| 405 | School |
| 406 | Staff hostel |
| 407 | Training hostel |
| 408 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C. Stair caseUp to height of 4.3 m.2nd Floor |
| 409 | RM Office |
| 410 | 2BHK |
| 411 | 3BHK |
| 412 | Officers & Club |
| 413 | School |
| 414 | Staff hostel |
| 415 | Training hostel |
| 416 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C. Stair caseUp to height of 4.3 m.3rd Floor |
| 417 | 2BHK |
| 418 | 3BHK |
| 419 | Officers & Club |
| 420 | Training hostel |
| 421 | Rigid and smooth centering and shuttering for RCC works including false work using non sal wood scantling, planks, sal bullah etc.including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC & PMC and cost of all labour, T&P required for the work comp. in all respect. For Centering shuttering R.C.C. Stair caseUp to height of 4.3 m.4th Floor |
| 422 | 2BHK |
| 423 | Providing and fixing of customized aluminium formwork for monolithic construction RCC members with a repetitive usage of 100 times using grade 5052 aluminium of panel sheets of minimum 4 mm thick and grade 6061 (Type-6) aluminium for extruded sections. The form work includes of beam components i.e. beam side panel, prop head for soffit beam, beams soffit panel, beam soffit bulk head and deck components i.e. deck panel, deck prop, prop length, deck mid, soffit length, deck beam bar and wall components i.e. wall panel, rocker, kiker and internal soffit corner, external soffit corner, external corner, internal corner etc. The panels are held in position by a simple pin and wedge system that passes through holes in the out side rib of Each panel. The tolerance of finished panels to be (-1 mm), and shall conform to IS 14687-1999. Pins and wedges to be made of high grade mild steel, all complete as per direction of Engineer-in- charge. (Cost of RCC work shall be paid separately) |
| 424 | RM Office |
| 425 | Guest House |
| 426 | 2BHK |
| 427 | 3BHK |
| 428 | Officers & Club |
| 429 | School |
| 430 | Staff hostel |
| 431 | Training hostel |
| 432 | External Development |
| 433 | Providing and fixing in position Stainless steel Grade 304 plate-1.0 mm thick as per design for expansion joints. all complete as per direction of Engineer-in- charge.200 mm wide. |
| 434 | RM Office |
| 435 | School |
| 436 | Providing and fixing of expansion joint system related with floor location as per drawings and direction of Engineer-In-Charge. The joints system will be of extrudedaluminum base members, self aligning / self centering arrangement and supportplates etc. as per ASTM B221-02. The system shall be such that it provides floor tofloor /floor to wall expansion control system for various vertical localtion in loadapplication areas that accommodates multi directional seismic movement withoutstress to it\"s components. System shall consist of metal profiles with a universal aluminum base member designed to accommodate various project conditions and finish floor treatments. The cover plate shall be designed of width and thickness required to satisfy projects movement and loading requirements and secured to base members by utilizing manufacturer’s pre-engineered self- centering arrangement that freely rotates / moves in all directions. The Self - centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. Provision of Moisture Barrier Membrane in the Joint System to have watertight joint is mandatory requirement all as per the manufactures design and as approved by Engineer -in-Charge. (Material shall confirm to ASTM 6063).Floor Joint of 150 mm gap |
| 437 | RM Office |
| 438 | School |
| 439 | Providing and fixing of expansion joint system of approved make and manufactures for various roof locations as per approved drawings and direction of Engineer-In-Charge. The joints shall be of extruded aluminum base members with, self aligning and self centering arragement support plates asper ASTM B221-02. The system shall be such that it provides watertight roof to roof/roof to corner joint cover expansion control system that is capable of accommodating multidirectional seismic movement without stress to its components. System shall consist of metal profile that incorporates a universal aluminum base member designed to accommodate various project conditions and roof treatments. The cover plate shall be designed of width and thickness required to satisfy movement and loading requirements and secured to base members by utilizing manufacturer’s preengineered self-centering arrangement that freely rotates / moves in all directions. The Self centering arrangement shall exhibit circular sphere ends that lock and slide inside the corresponding aluminum extrusion cavity to allow freedom of movement and flexure in all directions including vertical displacement. The Joint System shall resists damage or deterioration from the impact of falling ice, exposure to UV, airborne contaminants and occasional foot traffic from maintenance personnel. Provision of Moisture Barrier Membrane in the Joint System to have water tight joint is mandatory requirement. (Material shall confirm to ASTM 6063).Roof Joint of 150 mm gap |
| 440 | RM Office |
| 441 | School |
| 442 | Post Tensioning WorkDesign and Execution of Post Tensioningworks including decoiling the strands, cutting to the required lengths, supplying and laying of HT strands, sheathing(GI Plain/Corrugated ductsjointing with couplers, and inserting the strands, profiling, fixing live end anchorages including the supply of stressing anchorages suitableTendons, grout vents, making dead end anchorages including flowering the strands, fixing tendon support bars, supervising the fixing of anti bursting reinforcement, stressing the cables, end trimming, grouting the cableswith required Plant and Machineries, tools and tackles, consumables, Manpower and supervision staff etc.work should be done as per the satifation ofEngineer-In charge at site |
| 443 | RM Office |
| 444 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC. Upto Ground Floor lvl |
| 445 | RM Office |
| 446 | Guest House |
| 447 | 2BHK |
| 448 | 3BHK |
| 449 | Officers & Club |
| 450 | School |
| 451 | Staff hostel |
| 452 | Training hostel |
| 453 | External Development |
| 454 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.GF to 1st Floor lvl |
| 455 | RM Office |
| 456 | Guest House |
| 457 | 2BHK |
| 458 | 3BHK |
| 459 | Officers & Club |
| 460 | School |
| 461 | Staff hostel |
| 462 | Training hostel |
| 463 | External Development |
| 464 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.For 1st to 2nd Floor |
| 465 | RM Office |
| 466 | Guest House |
| 467 | 2BHK |
| 468 | 3BHK |
| 469 | Officers & Club |
| 470 | School |
| 471 | Staff hostel |
| 472 | Training hostel |
| 473 | External Development |
| 474 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.For 2nd to 3rd Floor |
| 475 | RM Office |
| 476 | 2BHK |
| 477 | 3BHK |
| 478 | Officers & Club |
| 479 | School |
| 480 | Staff hostel |
| 481 | Training hostel |
| 482 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.For 3rd to 4th Floor |
| 483 | 2BHK |
| 484 | 3BHK |
| 485 | Officers & Club |
| 486 | Training hostel |
| 487 | Brick work in Super-Structure with flyash bricks of size 23x11x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.For 4th Floor to terrace |
| 488 | 2BHK |
| 489 | Half brick masonry with non modular fly ash bricks of class designation 10, conformingio IS :12894 in Super-Structurewith cement mortar (1:4) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.above plinth and upto floor level. |
| 490 | RM Office |
| 491 | Guest House |
| 492 | 2BHK |
| 493 | 3BHK |
| 494 | Officers & Club |
| 495 | School |
| 496 | Staff hostel |
| 497 | Training hostel |
| 498 | External Development |
| 499 | Extra for providing and placing in position 2 Each 6mm dia. M.S. bars at every third course of half brick masonry all complete as per direction of Engineer-in- charge. |
| 500 | RM Office |
| 501 | Guest House |
| 502 | 2BHK |
| 503 | 3BHK |
| 504 | Officers & Club |
| 505 | School |
| 506 | Staff hostel |
| 507 | Training hostel |
| 508 | External Development |
| 509 | Providing and laying autoclaved aerated cement blocks masonry with 100 mm thick AAC blocks in super structure above plinth level up to floor V level in cement mortar 1:4 (1 cement : 4 coarse sand ). with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and of all materials, labour, T&P etc. and as per direction of Engineer in charge & PMC.The rate includes providing and placing in position 2 Each 6 mm dia M.S. bars at every third course of masonry work. |
| 510 | RM Office |
| 511 | Guest House |
| 512 | 2BHK |
| 513 | 3BHK |
| 514 | Officers & Club |
| 515 | School |
| 516 | Staff hostel |
| 517 | Training hostel |
| 518 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/ 230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). |
| 519 | RM Office |
| 520 | Guest House |
| 521 | 2BHK |
| 522 | 3BHK |
| 523 | Officers & Club |
| 524 | School |
| 525 | Staff hostel |
| 526 | Training hostel |
| 527 | Providing and filling AAC blocks including proper watering and compaction in sunken areas all complete as per drawings and as directed by the Engineer-in-Charge |
| 528 | RM Office |
| 529 | Guest House |
| 530 | 2BHK |
| 531 | 3BHK |
| 532 | Officers & Club |
| 533 | School |
| 534 | Staff hostel |
| 535 | Training hostel |
| 536 | Providing and fixing 20 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels complete as per drawings and as directed by the Engineer-in-Charge. Area of slab Granite of any colour and shadeupto 0.50 Sqm |
| 537 | RM Office |
| 538 | Guest House |
| 539 | 2BHK |
| 540 | 3BHK |
| 541 | Officers & Club |
| 542 | School |
| 543 | Staff hostel |
| 544 | Training hostel |
| 545 | External Development |
| 546 | Providing and fixing 20 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels complete as per drawings and as directed by the Engineer-in-Charge. Area of slab Granite of any colour and shadeover 0.50 Sqm |
| 547 | RM Office |
| 548 | Guest House |
| 549 | 2BHK |
| 550 | 3BHK |
| 551 | Officers & Club |
| 552 | School |
| 553 | Staff hostel |
| 554 | Training hostel |
| 555 | External Development |
| 556 | Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. Granite work |
| 557 | RM Office |
| 558 | Guest House |
| 559 | 2BHK |
| 560 | 3BHK |
| 561 | Officers & Club |
| 562 | School |
| 563 | Staff hostel |
| 564 | Training hostel |
| 565 | External Development |
| 566 | Extra for fixing marble /granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning etc. complete as per drawings and as directed by the Engineer-in-Charge. Granite work |
| 567 | RM Office |
| 568 | Guest House |
| 569 | 2BHK |
| 570 | 3BHK |
| 571 | Officers & Club |
| 572 | School |
| 573 | Staff hostel |
| 574 | Training hostel |
| 575 | External Development |
| 576 | Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in marble/ Granite/ stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete as per drawings and as directed by the Engineer-in-Charge. |
| 577 | RM Office |
| 578 | Guest House |
| 579 | 2BHK |
| 580 | 3BHK |
| 581 | Officers & Club |
| 582 | School |
| 583 | Staff hostel |
| 584 | Training hostel |
| 585 | Providing and fixing stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) as per direction of Engineer-incharge and finished smooth.Granite Stone of approved shade |
| 586 | RM Office |
| 587 | Officers & Club |
| 588 | Staff hostel |
| 589 | Training hostel |
| 590 | Providing seasoned Salwood in frames of required size in doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. ( hold fast lugs or dash fastener shall be paid for separately). |
| 591 | RM Office |
| 592 | Guest House |
| 593 | 2BHK |
| 594 | 3BHK |
| 595 | Officers & Club |
| 596 | School |
| 597 | Staff hostel |
| 598 | Training hostel |
| 599 | External Development |
| 600 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters:35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 601 | RM Office |
| 602 | Guest House |
| 603 | 2BHK |
| 604 | 3BHK |
| 605 | Officers & Club |
| 606 | School |
| 607 | Staff hostel |
| 608 | Training hostel |
| 609 | External Development |
| 610 | Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured) including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 611 | RM Office |
| 612 | Guest House |
| 613 | 2BHK |
| 614 | 3BHK |
| 615 | Officers & Club |
| 616 | School |
| 617 | Staff hostel |
| 618 | Training hostel |
| 619 | External Development |
| 620 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) 35 mm thick shutters |
| 621 | Guest House |
| 622 | 2BHK |
| 623 | 3BHK |
| 624 | Officers & Club |
| 625 | Staff hostel |
| 626 | Training hostel |
| 627 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick :Second class teak wood including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 628 | Guest House |
| 629 | 2BHK |
| 630 | 3BHK |
| 631 | Officers & Club |
| 632 | Staff hostel |
| 633 | Training hostel |
| 634 | Providing & Fixing decorative high pressure laminated sheet of plain / wood grain in gloss / matt/ suede finish with high density protective surface layer and reverse side of adhesive bonding quality conforming to IS : 2046 Type S, including cost of adhesive of approved quality.1.5 mm thick including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 635 | RM Office |
| 636 | Guest House |
| 637 | 2BHK |
| 638 | 3BHK |
| 639 | Officers & Club |
| 640 | School |
| 641 | Staff hostel |
| 642 | Training hostel |
| 643 | External Development |
| 644 | Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10 mm diaMtr bolts, nuts and wooden plugs and embedding in cement concrete block 30x10x15cm 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 645 | RM Office |
| 646 | Guest House |
| 647 | 2BHK |
| 648 | 3BHK |
| 649 | Officers & Club |
| 650 | School |
| 651 | Staff hostel |
| 652 | Training hostel |
| 653 | External Development |
| 654 | Providing and fixing Stainless steel satin finish SS 304 grade Sliding Door bolts 250x16 mm for wooden doors of approved make and model including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 655 | RM Office |
| 656 | Guest House |
| 657 | 2BHK |
| 658 | 3BHK |
| 659 | Officers & Club |
| 660 | School |
| 661 | Staff hostel |
| 662 | Training hostel |
| 663 | External Development |
| 664 | Providing and fixing Stainless steel satin finish SS 304 grade Tower Bolts SS screws for wooden doors of approved make and model aincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 250x10mm |
| 665 | RM Office |
| 666 | Guest House |
| 667 | 2BHK |
| 668 | 3BHK |
| 669 | Officers & Club |
| 670 | School |
| 671 | Staff hostel |
| 672 | Training hostel |
| 673 | External Development |
| 674 | Providing and fixing Stainless steel satin finish SS 304 grade Tower Bolts SS screws for wooden doors of approved make and model including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 100x10mm |
| 675 | RM Office |
| 676 | Guest House |
| 677 | 2BHK |
| 678 | 3BHK |
| 679 | Officers & Club |
| 680 | School |
| 681 | Staff hostel |
| 682 | Training hostel |
| 683 | External Development |
| 684 | Providing and fixing Stainless steel satin finish SS 304 grade Handles with SS screws for wooden doors of approved make and model including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 300 mm |
| 685 | RM Office |
| 686 | Guest House |
| 687 | 2BHK |
| 688 | 3BHK |
| 689 | Officers & Club |
| 690 | School |
| 691 | Staff hostel |
| 692 | Training hostel |
| 693 | External Development |
| 694 | Providing and fixing bright finished brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc.complete including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 695 | RM Office |
| 696 | Guest House |
| 697 | 2BHK |
| 698 | 3BHK |
| 699 | Officers & Club |
| 700 | School |
| 701 | Staff hostel |
| 702 | Training hostel |
| 703 | External Development |
| 704 | Providing and fixing carbon steel galvanised ( minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 m dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 10 x 80 mm |
| 705 | RM Office |
| 706 | Guest House |
| 707 | 2BHK |
| 708 | 3BHK |
| 709 | Officers & Club |
| 710 | School |
| 711 | Staff hostel |
| 712 | Training hostel |
| 713 | External Development |
| 714 | Providing and fixing carbon steel galvanised ( minimum coating 5 micron) dash fastener of 10 mm dia double threaded 6.8 grade (yield strength 480 N/mm2), counter sunk head, comprising of 10 m dia polyamide PA 6 grade sleeve, including drilling of hole in frame , concrete/ masonry, etc. including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 10 x 140 mm |
| 715 | RM Office |
| 716 | Guest House |
| 717 | 2BHK |
| 718 | 3BHK |
| 719 | Officers & Club |
| 720 | School |
| 721 | Staff hostel |
| 722 | Training hostel |
| 723 | External Development |
| 724 | Steel work welded in built up sections/ framed work, including Powder coating 50 microns, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 725 | Guest House |
| 726 | External Development |
| 727 | Steel work welded in built up sections/ framed work, including Powder coating 50 microns, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 728 | RM Office |
| 729 | Guest House |
| 730 | 2BHK |
| 731 | 3BHK |
| 732 | Officers & Club |
| 733 | School |
| 734 | Staff hostel |
| 735 | Training hostel |
| 736 | External Development |
| 737 | Supplying, fitting and fixing Kandla stone finish of approved shed and size in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved qualityincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. Ground floor |
| 738 | RM Office |
| 739 | Guest House |
| 740 | 2BHK |
| 741 | 3BHK |
| 742 | Officers & Club |
| 743 | School |
| 744 | Staff hostel |
| 745 | Training hostel |
| 746 | External Development |
| 747 | Supplying, fitting and fixing Kandla stone finish of approved shed and size in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 1st Floor |
| 748 | RM Office |
| 749 | Guest House |
| 750 | 2BHK |
| 751 | 3BHK |
| 752 | Officers & Club |
| 753 | School |
| 754 | Staff hostel |
| 755 | Training hostel |
| 756 | External Development |
| 757 | Supplying, fitting and fixing Kandla stone finish of approved shed and size in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved qualityincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 2nd Floor |
| 758 | RM Office |
| 759 | 2BHK |
| 760 | 3BHK |
| 761 | Officers & Club |
| 762 | School |
| 763 | Staff hostel |
| 764 | Training hostel |
| 765 | Supplying, fitting and fixing Kandla stone finish of approved shed and size in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 3rd Floor |
| 766 | 2BHK |
| 767 | 3BHK |
| 768 | Officers & Club |
| 769 | Training hostel |
| 770 | Supplying, fitting and fixing Kandla stone finish of approved shed and size in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved qualityincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 4th Floor |
| 771 | 2BHK |
| 772 | 3BHK |
| 773 | Officers & Club |
| 774 | Supplying fitting and fixing of Kandla stone 18 mm thick in risers of steps, skirting, dado and pillars of approved shed and sizelaid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. Ground floor |
| 775 | RM Office |
| 776 | Guest House |
| 777 | 2BHK |
| 778 | 3BHK |
| 779 | Officers & Club |
| 780 | School |
| 781 | Staff hostel |
| 782 | Training hostel |
| 783 | External Development |
| 784 | Supplying fitting and fixing of Kandla stone 18 mm thick in risers of steps, skirting, dado and pillars of approved shed and sizelaid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 1st Floor |
| 785 | RM Office |
| 786 | Guest House |
| 787 | 2BHK |
| 788 | 3BHK |
| 789 | Officers & Club |
| 790 | School |
| 791 | Staff hostel |
| 792 | Training hostel |
| 793 | External Development |
| 794 | Supplying fitting and fixing of Kandla stone 18 mm thick in risers of steps, skirting, dado and pillars of approved shed and sizelaid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 795 | RM Office |
| 796 | 2BHK |
| 797 | 3BHK |
| 798 | Officers & Club |
| 799 | School |
| 800 | Staff hostel |
| 801 | Training hostel |
| 802 | Supplying fitting and fixing of Kandla stone 18 mm thick in risers of steps, skirting, dado and pillars of approved shed and sizelaid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 3rd Floor |
| 803 | 2BHK |
| 804 | 3BHK |
| 805 | Officers & Club |
| 806 | Training hostel |
| 807 | Supplying fitting and fixing of Kandla stone 18 mm thick in risers of steps, skirting, dado and pillars of approved shed and sizelaid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.4th Floor |
| 808 | 2BHK |
| 809 | Officers & Club |
| 810 | Extra for pre finished Eaching in treads of steps of Kandla stone including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 811 | RM Office |
| 812 | Guest House |
| 813 | 2BHK |
| 814 | 3BHK |
| 815 | Officers & Club |
| 816 | School |
| 817 | Supplying, fitting and fixing Kota stone 16mm thick in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 818 | Guest House |
| 819 | Staff hostel |
| 820 | Training hostel |
| 821 | External Development |
| 822 | Supplying, fitting and fixing Kota stone 16mm thick in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.1st Floor |
| 823 | Staff hostel |
| 824 | Training hostel |
| 825 | Supplying, fitting and fixing Kota stone 16mm thick in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved qualityincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 826 | Staff hostel |
| 827 | Training hostel |
| 828 | Supplying, fitting and fixing Kota stone 16mm thick in floorsof approved make laid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 3rd Floor |
| 829 | Training hostel |
| 830 | Kota stone 16mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 831 | Guest House |
| 832 | Staff hostel |
| 833 | Training hostel |
| 834 | External Development |
| 835 | Kota stone 16mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab,including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.1st Floor. |
| 836 | Staff hostel |
| 837 | Training hostel |
| 838 | Kota stone 16mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 2nd Floor |
| 839 | Staff hostel |
| 840 | Training hostel |
| 841 | Kota stone 16mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab,including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.3rd Floor |
| 842 | Training hostel |
| 843 | Extra for pre finished Eaching in treads of steps of Kota stone including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 844 | Staff hostel |
| 845 | Training hostel |
| 846 | Extra for Kota stone/ sand stone in treads of steps and risers using single length up to 1.05 Mtr including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 847 | Staff hostel |
| 848 | Training hostel |
| 849 | Vitrified tile 10 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 850 | Guest House |
| 851 | 2BHK |
| 852 | 3BHK |
| 853 | Staff hostel |
| 854 | Training hostel |
| 855 | External Development |
| 856 | Vitrified tile 10 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.1st Floor |
| 857 | Guest House |
| 858 | Staff hostel |
| 859 | Training hostel |
| 860 | Vitrified tile 10 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab,including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 2nd Floor |
| 861 | Staff hostel |
| 862 | Training hostel |
| 863 | Vitrified tile 10 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab,including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.3rd Floor |
| 864 | Training hostel |
| 865 | Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shedlaid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. Ground floor |
| 866 | RM Office |
| 867 | Guest House |
| 868 | Officers & Club |
| 869 | School |
| 870 | Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shedlaid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.1st Floor |
| 871 | RM Office |
| 872 | Guest House |
| 873 | 2BHK |
| 874 | 3BHK |
| 875 | Officers & Club |
| 876 | School |
| 877 | Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shedlaid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 878 | RM Office |
| 879 | 2BHK |
| 880 | 3BHK |
| 881 | Officers & Club |
| 882 | School |
| 883 | Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shedlaid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.3rd Floor |
| 884 | 2BHK |
| 885 | 3BHK |
| 886 | Officers & Club |
| 887 | Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shedlaid C.M (1:4) & filling joints with white cement of approved quality including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.4th Floor |
| 888 | 2BHK |
| 889 | Supplying, fitting and fixing Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shed laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 890 | RM Office |
| 891 | Guest House |
| 892 | School |
| 893 | Supplying, fitting and fixing Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shed laidon 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.1st Floor |
| 894 | RM Office |
| 895 | Guest House |
| 896 | 2BHK |
| 897 | 3BHK |
| 898 | Officers & Club |
| 899 | School |
| 900 | Supplying, fitting and fixing Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shed laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab,including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 901 | RM Office |
| 902 | 2BHK |
| 903 | 3BHK |
| 904 | Officers & Club |
| 905 | School |
| 906 | Supplying, fitting and fixing Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shed laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.3rd Floor |
| 907 | 2BHK |
| 908 | 3BHK |
| 909 | Officers & Club |
| 910 | Supplying, fitting and fixing Supplying, fitting and fixing Marble Engineered stone tile finish size 1250 x 3040 x 18mmin floorsof approved make and shed laid on 12 mm (average) thick cement mortar 1:3(1 cement : 3 coarse sand ) and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.4th Floor |
| 911 | 2BHK |
| 912 | Providing and fixing Slim wall tiles size 1200x600x5mm thickness, of approved make and colours, shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 913 | RM Office |
| 914 | Guest House |
| 915 | Providing and fixing Slim wall tiles size 1200x600x5mm thickness, of approved make and colours, shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade complete as per drawings and as directed by the Engineer-in-Charge. 1st Floor |
| 916 | RM Office |
| 917 | Guest House |
| 918 | Providing and fixing Slim wall tiles size 1200x600x5mm thickness, of approved make and colours, shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 919 | RM Office |
| 920 | Providing and fixing Slim wall tiles size 600x600x5mm thickness, of approved make and shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.Ground floor |
| 921 | Officers & Club |
| 922 | School |
| 923 | Staff hostel |
| 924 | Training hostel |
| 925 | Providing and fixing Slim wall tiles size 600x600x5mm thickness, of approved make and shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. 1st Floor |
| 926 | 2BHK |
| 927 | 3BHK |
| 928 | Officers & Club |
| 929 | School |
| 930 | Providing and fixing Slim wall tiles size 600x600x5mm thickness, of approved make and shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.2nd Floor |
| 931 | 2BHK |
| 932 | 3BHK |
| 933 | Officers & Club |
| 934 | School |
| 935 | Providing and fixing Slim wall tiles size 600x600x5mm thickness, of approved make and shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.3rd Floor |
| 936 | 2BHK |
| 937 | 3BHK |
| 938 | Officers & Club |
| 939 | Providing and fixing Slim wall tiles size 600x600x5mm thickness, of approved make and shades as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.4th Floor |
| 940 | 2BHK |
| 941 | 2.5 cm (1\"\") thick A.S flooring with C.C of prop. (1:2:4) including punning using 12mm size black hard crusher broken granite chips over PCC (1:3:6) in ground floor and after chipping and chiseling the top of floor slabs in upper floor laid to proper slope including rounding of corners,watering and curing with cost,conveyance,royalities of all materials and cost of all labour,T & P required for the work etc.as per direction of EIC & PMC. Ground Floor |
| 942 | RM Office |
| 943 | 2.5 cm (1\"\") thick A.S flooring with C.C of prop. (1:2:4) including punning using 12mm size black hard crusher broken granite chips over PCC (1:3:6) in ground floor and after chipping and chiseling the top of floor slabs in upper floor laid to proper slope including rounding of corners,watering and curing with cost,conveyance,royalities of all materials and cost of all labour,T & P required for the work etc.as per direction of EIC & PMC. 1st Floor |
| 944 | RM Office |
| 945 | 2.5 cm (1\"\") thick A.S flooring with C.C of prop. (1:2:4) including punning using 12mm size black hard crusher broken granite chips over PCC (1:3:6) in ground floor and after chipping and chiseling the top of floor slabs in upper floor laid to proper slope including rounding of corners,watering and curing with cost,conveyance,royalities of all materials and cost of all labour,T & P required for the work etc.as per direction of EIC & PMC. 2nd Floor |
| 946 | RM Office |
| 947 | Providing and fixing of 2 - 3 mm average thick layer of cementations smoothening compoundor equivalent as recommended by the Vinyl sheet flooring manufacturer over and including an approved primer compound followed by application of approved self levelling underlayment maintaining an average thickness of 2to 3mmapplied on concrete surface to provide a smooth and homogenous surface for laying of vinyl sheet flooring complete to the entire satisfaction of Engineer-in-charge. |
| 948 | RM Office |
| 949 | Officers & Club |
| 950 | School |
| 951 | Supply and installation ofPVCsheet flooring kness of 2mm. The product should be homogeneous and single layered. The wear surface shall consist of impregnated polyurethane homogeneous mixture of PVC and it shall conform to group \"T\" wear resistance as per EN 649,Flammability resistance of class Bfl-s1 as per EN13501-1, Dynamic coefficient of friction of class DS as per EN 13893, Impact sound reduction of 3dB as per ISO 10140, Slip Resistance of class R9 as per DIN 51130, Color fastness rating of =6 as per ISO 105-B02, total weight being 2.8 kg/m2 as per EN430. The product shall be suitable for applications in class 23/34/43 areas as per EN685. Product shall exhibit antistatic behaviour, resistance to bacteria,resistance to chemical, resistance to staining,suitability to castor chair. The product shall be FloorScore certified.Installation- The installation shall be undertaken as per manufacturers installation instructions. etc. complete as per drawings and as directed by the Engineer-in-Charge. |
| 952 | RM Office |
| 953 | Officers & Club |
| 954 | School |
| 955 | Providing & Fixing of wall panelling with 6mm thick Mirror of approved brand including mounting tape and silicon over 19mm & 12mm thick plywood with backing of size 50x25mm aluminum tube framing inGrid as per design to level the masonry walls and makewastages, different sizes of nails, screws, & labour charges etc., all complete as per drawing and as directed by Architects / Engineer-in-charge. |
| 956 | Officers & Club |
| 957 | Providing and fixing approved Carpet flooring of Nylon 6.6 face fiber or equivalent of approved make with 100% Nylon and completely water proof resilient backing. The flooring should be Anti static with thickness of 4.3 mm and approximate weight of 1.8 k.g./Sqm of roll form. The carpet should be completely stain resistant and of a density approx. 80 million fibers/sq.Mtr (70 million fiber/sq.yd) in the width of 2 Mtr .The floor covering should have Fire Test EN-13501, Appearance Retention Hexapod ISO 140-8, Friction Slip Resistance Test EN 14041 Class DS, , with resilient waterproof backing, anti allergic which is certified by British allergy foundation or equivalent.The carpet should have permanent static contro. The work should be carried out by the authorized installer of the approved Company in India. complete as per directed by the Engineer-in-Charge |
| 958 | RM Office |
| 959 | Providing and fixing Toilet cubicals BESCO TITAN CUBICLE or approved equivalent with the following specificationsThickness of Compact Laminate : 18 mm Color of HPL Boards: Single Color Size of Cubicle : any size and shapeDoor Size : 1995mm (H) x 610mm (W) Divider Size : 1995mm (H) Overall Height Of Cubicle : 2100mm (Including boom Gap of 100mm) Accessories: Standard - Merino Make Stainless Steel - 304 Grade accessories) a) SS \"U\" Channel b) SS \"F\" channel c) SS Coat Hook d) SS Privacy Thumb turn c/w Occupancy Indicator e) SS Door Knob f) SS Hinges with Cover g) SS Shoe Box Leg 18mm - 316 Grade h) Rubber Lining for Groove i) S.S.Screws 304 G & P .V.C Wall PlugsRates shall be inclusive of all operations as listed above at all heights and levels all complete as per drawings and as directed by the Engineer-in-chargeL Shape with door= 57I shape with door= 18etc. complete as per drawings and as directed by the Engineer-in-Charge |
| 960 | RM Office |
| 961 | School |
| 962 | Staff hostel |
| 963 | Training hostel |
| 964 | Providing and fixing stainless steel cramps of required size and shape for anchoring stone wall lining to the backing or securing adjacent stones in stone wall lining in cement mortar 1:2 (1 cement : 2 coarse sand), including making the necessary chases in stone and holes in walls wherever required including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 965 | RM Office |
| 966 | Guest House |
| 967 | 2BHK |
| 968 | 3BHK |
| 969 | Officers & Club |
| 970 | School |
| 971 | Staff hostel |
| 972 | Training hostel |
| 973 | Making khurras 45x45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C. sheet 1 m x1 m x 400 micron, finished with 12 mm cement plaster 1:3 (1 cement : 3 coarse sand) and a coat of neat cement, rounding the edges and making and finishing the outlet complete including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 974 | RM Office |
| 975 | Guest House |
| 976 | 2BHK |
| 977 | 3BHK |
| 978 | Officers & Club |
| 979 | School |
| 980 | Staff hostel |
| 981 | Training hostel |
| 982 | External Development |
| 983 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :In 75x75 mm deep chase including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 984 | RM Office |
| 985 | Guest House |
| 986 | 2BHK |
| 987 | 3BHK |
| 988 | Officers & Club |
| 989 | School |
| 990 | Staff hostel |
| 991 | Training hostel |
| 992 | External Development |
| 993 | Providing and installing Aluminum Panel Ceiling of approved make, model and manufacturer as per approved RAL shade, consisting of panels 300 mm wide x 31mm deep Plain panel desired length up to 6Mtr. The panels shall be fabricated 0.70mm thick Roll formed from enameled Corrosion Resistance Aluminum alloy AA 3105 for higher strength and good Roll Forming characteristics with beveled edges, with Anti-microbial 60-micron powder coating activity using Test Based on MOD ISO 22196:2011. Powder coating test result should pass, Pencil hardness ASTM D3363-05, Scratch resistance ISO 1518-1/ SIS 83 91 17, Impact resistance ASTM D2794, Resistance to neutral salt spray ASTM B117, Resistance to humid atmospheres ISO 6270-2, Adhesion ISO 2409, Expected durability of the antimicrobial effect: 25+ years according to an accelerated test.Two sides of Each panel to be raised and piped and stopped / demounting of individual panel. Panel shall be clipped to a baked enameled Aluminum Panel Carrier of 34.5mm wide x 63mm Deep made of 0.95mm thick in standard lengths of 5Mtrs made of Double baked enameled Aluminum Alloy AA 3105 (Al.Mg) Black colour with cut outs to hold the panels in a module of 300mm at a distance of 1.2Mtrs c/c. The panel carrier shall be suspended by means of G.I. suspension rod 4mm diaMtr and galvanized spring clip at a distance of 1.5 Mtr. c/c. all complete as per drawings and as directed by Engineer-in-charge |
| 994 | RM Office |
| 995 | Guest House |
| 996 | 2BHK |
| 997 | 3BHK |
| 998 | Officers & Club |
| 999 | School |
| 1000 | Staff hostel |
| 1001 | Training hostel |
| 1002 | External Development |
| 1003 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. GF to 1st Floor |
| 1004 | RM Office |
| 1005 | Guest House |
| 1006 | 2BHK |
| 1007 | 3BHK |
| 1008 | Officers & Club |
| 1009 | School |
| 1010 | Staff hostel |
| 1011 | Training hostel |
| 1012 | External Development |
| 1013 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. 1st Floor to 2nd floor |
| 1014 | RM Office |
| 1015 | Guest House |
| 1016 | 2BHK |
| 1017 | 3BHK |
| 1018 | Officers & Club |
| 1019 | School |
| 1020 | Staff hostel |
| 1021 | Training hostel |
| 1022 | External Development |
| 1023 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. 2nd floor to 3rd Floor |
| 1024 | RM Office |
| 1025 | Guest House |
| 1026 | 2BHK |
| 1027 | 3BHK |
| 1028 | Officers & Club |
| 1029 | School |
| 1030 | Staff hostel |
| 1031 | Training hostel |
| 1032 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. 3rd Floor to 4th Floor |
| 1033 | RM Office |
| 1034 | 2BHK |
| 1035 | 3BHK |
| 1036 | Officers & Club |
| 1037 | School |
| 1038 | Staff hostel |
| 1039 | Training hostel |
| 1040 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. 4TH Floor to terrace |
| 1041 | 2BHK |
| 1042 | 3BHK |
| 1043 | Officers & Club |
| 1044 | Training hostel |
| 1045 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC & PMC. Terrace to Mumty |
| 1046 | 2BHK |
| 1047 | 12mm (1/2”) thick cement plaster (1:4) with neat cement punning over brick masonry wall in all floors after racking out the joints including watering and curing etc. complete with cost, conveyance, royalty and cost of all materials and cost of all labour, T&P, required for the work complete as per specification & direction of EIC & PMC. GF to 1st Floor |
| 1048 | External Development |
| 1049 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. Ground Floor |
| 1050 | RM Office |
| 1051 | Guest House |
| 1052 | 2BHK |
| 1053 | 3BHK |
| 1054 | Officers & Club |
| 1055 | School |
| 1056 | Staff hostel |
| 1057 | Training hostel |
| 1058 | External Development |
| 1059 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. 1st Floor |
| 1060 | RM Office |
| 1061 | Guest House |
| 1062 | 2BHK |
| 1063 | 3BHK |
| 1064 | Officers & Club |
| 1065 | School |
| 1066 | Staff hostel |
| 1067 | Training hostel |
| 1068 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. 2nd Floor |
| 1069 | RM Office |
| 1070 | 2BHK |
| 1071 | 3BHK |
| 1072 | Officers & Club |
| 1073 | School |
| 1074 | Staff hostel |
| 1075 | Training hostel |
| 1076 | External Development |
| 1077 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. 3rd Floor |
| 1078 | RM Office |
| 1079 | 2BHK |
| 1080 | 3BHK |
| 1081 | Officers & Club |
| 1082 | School |
| 1083 | Staff hostel |
| 1084 | Training hostel |
| 1085 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. 4th Floor |
| 1086 | 2BHK |
| 1087 | 3BHK |
| 1088 | Officers & Club |
| 1089 | Training hostel |
| 1090 | 6mm thick cement plaster (1:4) to RCC surfacesincluding watering and curing and cost with cost , carriage of all materials and cost of all labours, T&P required to complete as per direction of EIC & PMC. Terrace |
| 1091 | 2BHK |
| 1092 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. GF to 1st Floor |
| 1093 | RM Office |
| 1094 | Guest House |
| 1095 | 2BHK |
| 1096 | 3BHK |
| 1097 | Officers & Club |
| 1098 | School |
| 1099 | Staff hostel |
| 1100 | Training hostel |
| 1101 | External Development |
| 1102 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 1st Floor to 2nd floor |
| 1103 | RM Office |
| 1104 | Guest House |
| 1105 | 2BHK |
| 1106 | 3BHK |
| 1107 | Officers & Club |
| 1108 | School |
| 1109 | Staff hostel |
| 1110 | Training hostel |
| 1111 | External Development |
| 1112 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 2nd floor to 3rd Floor |
| 1113 | RM Office |
| 1114 | Guest House |
| 1115 | 2BHK |
| 1116 | 3BHK |
| 1117 | Officers & Club |
| 1118 | School |
| 1119 | Staff hostel |
| 1120 | Training hostel |
| 1121 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 3rd Floor to 4th Floor |
| 1122 | RM Office |
| 1123 | 2BHK |
| 1124 | 3BHK |
| 1125 | Officers & Club |
| 1126 | School |
| 1127 | Staff hostel |
| 1128 | Training hostel |
| 1129 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 4TH Floor to terrace |
| 1130 | 2BHK |
| 1131 | 3BHK |
| 1132 | Officers & Club |
| 1133 | Training hostel |
| 1134 | 16mm (5/8\") thick cement plaster with (1:6) for finished smooth to inside surface of brick walls in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. Terrace to Mumty |
| 1135 | 2BHK |
| 1136 | Washed stone grit plaster on exterior walls height upto 10 Mtr above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square Mtr, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippingsincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. (payment for providing grooves shall be made separately). |
| 1137 | RM Office |
| 1138 | Guest House |
| 1139 | 2BHK |
| 1140 | 3BHK |
| 1141 | Officers & Club |
| 1142 | School |
| 1143 | Staff hostel |
| 1144 | Training hostel |
| 1145 | External Development |
| 1146 | Extra for washed grit plaster on exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereofincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 1147 | RM Office |
| 1148 | 2BHK |
| 1149 | 3BHK |
| 1150 | Officers & Club |
| 1151 | School |
| 1152 | Staff hostel |
| 1153 | Training hostel |
| 1154 | Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereofincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 1155 | RM Office |
| 1156 | 2BHK |
| 1157 | 3BHK |
| 1158 | Officers & Club |
| 1159 | School |
| 1160 | Staff hostel |
| 1161 | Training hostel |
| 1162 | Providing and fixing Concrete louvers 50 x 50 mm section @ 200 c/cincluding cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. |
| 1163 | RM Office |
| 1164 | Guest House |
| 1165 | 2BHK |
| 1166 | 3BHK |
| 1167 | Officers & Club |
| 1168 | School |
| 1169 | Staff hostel |
| 1170 | Training hostel |
| 1171 | External Development |
| 1172 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. Ground Floor |
| 1173 | RM Office |
| 1174 | Guest House |
| 1175 | 2BHK |
| 1176 | 3BHK |
| 1177 | Officers & Club |
| 1178 | School |
| 1179 | Staff hostel |
| 1180 | Training hostel |
| 1181 | External Development |
| 1182 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. 1st Floor |
| 1183 | RM Office |
| 1184 | Guest House |
| 1185 | 2BHK |
| 1186 | 3BHK |
| 1187 | Officers & Club |
| 1188 | School |
| 1189 | Staff hostel |
| 1190 | Training hostel |
| 1191 | External Development |
| 1192 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. 2nd Floor |
| 1193 | RM Office |
| 1194 | Guest House |
| 1195 | 2BHK |
| 1196 | 3BHK |
| 1197 | Officers & Club |
| 1198 | School |
| 1199 | Staff hostel |
| 1200 | Training hostel |
| 1201 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. 3rd Floor |
| 1202 | RM Office |
| 1203 | 2BHK |
| 1204 | 3BHK |
| 1205 | Officers & Club |
| 1206 | School |
| 1207 | Staff hostel |
| 1208 | Training hostel |
| 1209 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. 4th Floor |
| 1210 | 2BHK |
| 1211 | 3BHK |
| 1212 | Officers & Club |
| 1213 | Training hostel |
| 1214 | Providing and painting internal surface two coats with plastic emulsion paint over a coat of water based primer of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. Terrace |
| 1215 | 2BHK |
| 1216 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. Ground Floor |
| 1217 | RM Office |
| 1218 | Guest House |
| 1219 | 2BHK |
| 1220 | 3BHK |
| 1221 | Officers & Club |
| 1222 | School |
| 1223 | Staff hostel |
| 1224 | Training hostel |
| 1225 | External Development |
| 1226 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. 1st Floor |
| 1227 | RM Office |
| 1228 | Guest House |
| 1229 | 2BHK |
| 1230 | 3BHK |
| 1231 | Officers & Club |
| 1232 | School |
| 1233 | Staff hostel |
| 1234 | Training hostel |
| 1235 | External Development |
| 1236 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. 2nd Floor |
| 1237 | RM Office |
| 1238 | Guest House |
| 1239 | 2BHK |
| 1240 | 3BHK |
| 1241 | Officers & Club |
| 1242 | School |
| 1243 | Staff hostel |
| 1244 | Training hostel |
| 1245 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. 3rd Floor |
| 1246 | RM Office |
| 1247 | 2BHK |
| 1248 | 3BHK |
| 1249 | Officers & Club |
| 1250 | School |
| 1251 | Staff hostel |
| 1252 | Training hostel |
| 1253 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. 4th Floor |
| 1254 | 2BHK |
| 1255 | 3BHK |
| 1256 | Officers & Club |
| 1257 | Training hostel |
| 1258 | Finishing wall surface with powder wall putty of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T & P etc complete as per direction of Engineer-in-charge. terrace |
| 1259 | 2BHK |
| 1260 | Finishing walls with textured exterior paint of required shade New work (Two or more coats applied @ 3.28 ltr/10 Sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 Sqm of approved quality and approved shade in all floors at all height by making the surface of wallsmooth including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1261 | RM Office |
| 1262 | Guest House |
| 1263 | 2BHK |
| 1264 | 3BHK |
| 1265 | Officers & Club |
| 1266 | School |
| 1267 | Staff hostel |
| 1268 | Training hostel |
| 1269 | External Development |
| 1270 | Painting two coats withapprovedsynthetic enamel Paint over a coat of primer of appd. Shade and quality on wood work/iron work including cost of paint,primer,putty,costconveyance of all materials, cost of alllabour, T&P required for the work etc. Complete as directed by EIC & PMC. :Two or more coats on new work |
| 1271 | RM Office |
| 1272 | Guest House |
| 1273 | 2BHK |
| 1274 | 3BHK |
| 1275 | Officers & Club |
| 1276 | School |
| 1277 | Staff hostel |
| 1278 | Training hostel |
| 1279 | External Development |
| 1280 | Providing and applying Rendering on Concrete surfaces comprising of cement, hardest earthen material, polymers and special additives, modern technology and special tools and workmanship.3 coats system comprising of :1.First coat ( Base Coat - coarse material) applied by steel trowel.2.Second coat ( Top Coat - fine material) applied by steel trowel. 3.Clear ( Transparent )lacquer top coat (water repellant) applied by brush/ roller. Rates shall include all systems as listed above including tools, plant, scaffolding, hardware, base preparation etc all complete as per drawings and as directed by Engineer-in-charge |
| 1281 | RM Office |
| 1282 | Guest House |
| 1283 | 2BHK |
| 1284 | 3BHK |
| 1285 | Officers & Club |
| 1286 | School |
| 1287 | Staff hostel |
| 1288 | Training hostel |
| 1289 | External Development |
| 1290 | Supplying all materials, labour, T&P for applying Melamine spray polish two coats over wood / Veneer surface after necessary sanding and smoothening to surface after mixing of solvent and hardner to achieve finished surface including cost of all materials, all labour to complete the work in all respect as per direction of EIC. |
| 1291 | Guest House |
| 1292 | 2BHK |
| 1293 | 3BHK |
| 1294 | Officers & Club |
| 1295 | Staff hostel |
| 1296 | Training hostel |
| 1297 | Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron) |
| 1298 | RM Office |
| 1299 | Guest House |
| 1300 | 2BHK |
| 1301 | 3BHK |
| 1302 | Officers & Club |
| 1303 | School |
| 1304 | Staff hostel |
| 1305 | Training hostel |
| 1306 | External Development |
| 1307 | Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :For fixed portionFor shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron) |
| 1308 | RM Office |
| 1309 | Guest House |
| 1310 | 2BHK |
| 1311 | 3BHK |
| 1312 | Officers & Club |
| 1313 | School |
| 1314 | Staff hostel |
| 1315 | Training hostel |
| 1316 | External Development |
| 1317 | Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete.Upto 5mm depth and 5 mm width including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1318 | RM Office |
| 1319 | Guest House |
| 1320 | 2BHK |
| 1321 | 3BHK |
| 1322 | Officers & Club |
| 1323 | School |
| 1324 | Staff hostel |
| 1325 | Training hostel |
| 1326 | External Development |
| 1327 | Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & double acting hydraulic floor spring type fixing arrangement and making necessary holes etc. for fixing required door fittings, all complete as per direction of Engineer-in-charge (Door handle, lock and stopper etc.to be paid separately) including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1328 | RM Office |
| 1329 | Guest House |
| 1330 | 2BHK |
| 1331 | 3BHK |
| 1332 | Officers & Club |
| 1333 | School |
| 1334 | Staff hostel |
| 1335 | Training hostel |
| 1336 | Providing and fixing aluminium tubular handle bar 32 mm outer dia, 3.0 mm thick & 2100 mm long with SS screws etc .complete as per direction of Engineer-in-Charge Powder coated minimum thickness 50 micron aluminium tubular handle bar including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1337 | RM Office |
| 1338 | Guest House |
| 1339 | 2BHK |
| 1340 | 3BHK |
| 1341 | Officers & Club |
| 1342 | School |
| 1343 | Staff hostel |
| 1344 | Training hostel |
| 1345 | Providing and fixing 6mm thick toughened glass in Doors, windows and Ventilators including sealing with EPDM / Neoprene gasket all complete as per the architectural drawings including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1346 | RM Office |
| 1347 | Guest House |
| 1348 | 2BHK |
| 1349 | 3BHK |
| 1350 | Officers & Club |
| 1351 | School |
| 1352 | Staff hostel |
| 1353 | Training hostel |
| 1354 | External Development |
| 1355 | Providing and fixing 12mm thick toughened glass in Doors, windows, partition and Ventilators including sealing with EPDM / Neoprene gasket all complete as per the architectural drawings including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1356 | RM Office |
| 1357 | Guest House |
| 1358 | 2BHK |
| 1359 | 3BHK |
| 1360 | Officers & Club |
| 1361 | School |
| 1362 | Staff hostel |
| 1363 | Training hostel |
| 1364 | External Development |
| 1365 | Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary screws etc. complete.Powder coated minimum thickness 50 micron aluminium including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1366 | RM Office |
| 1367 | Guest House |
| 1368 | 2BHK |
| 1369 | 3BHK |
| 1370 | Officers & Club |
| 1371 | School |
| 1372 | Staff hostel |
| 1373 | Training hostel |
| 1374 | External Development |
| 1375 | Providing and fixing aluminium round shape handle of outer dia 100 mm with SS screws etc. complete as per direction of Engineer-in-chargePowder coated minimum thickness 50 micron aluminium including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1376 | RM Office |
| 1377 | Guest House |
| 1378 | 2BHK |
| 1379 | 3BHK |
| 1380 | Officers & Club |
| 1381 | School |
| 1382 | Staff hostel |
| 1383 | Training hostel |
| 1384 | External Development |
| 1385 | Providing and fixing Automatic Sliding door of approved make and design to meet ANSI/BHSM 156.10 standards and based on the product category rules :IBU: PCR automatic doors, automatic gates and revolving door sysytem, PCR tested. The CE marking for the product takes into account the proof of conformity with harmonizes norms: EN 16005:2012/AC:2015: Power operated pedestrain doorEachs- safety in use- requirement and test methods, EN 61000-6-2:2005: Electromagnetic compatibility , EN 61000-6-3, EN60335-1, EN ISO 1849, EN 16005, IEC 60335-1, IEC 60335-2-103, UL 325, DIN 18650 Environmental product declaration in accordance with ISO 14025 and EN 15804. Tested for Durability of 1 Million Cycles, for frameless glass door application, modular design including internal cover.12 mm clear toughened glass for 1/ 2 Each sliding door panel as per drawings,Operator to be mounted on MS-Box Section / Equalant. Operator Finish should be Silver Anodised E6/C0,with operator dimensions Maximum(H x D) : 123x150 mm and of length as required to suit the opening size given below. The track profile should be separate from the main profile for enabling reduction in vibration insulation and easy maintainence. Microprocessor-controlled control unit, Self-learning. Maximum power consumption of 250W.Power Supply100-240V AC/ -+ 10%/50/60 Hz. Auxilary voltage of 24V DC, min. 1000mAClear opening (length and width as per drawings). Door weight single 240kg Door weight bi-parting door 2 x 200kg Opening and closing force Friction related, adjustable from 30 to 190N Height x Depth150mm (H) x 123mm (D). Opening and closing speed single 0.85m/sec (depends on perf. Level). Opening and closing speed, bi-part 0.85m/sec (depends on perf. Level). Hold open time 0 to 60 sec.Ambient Temperature -20 °C to +50 °C. Humidity max 85%. Class of protection(dust). IP 20 EPD-Declaration available convenience mode (battery-powered) 24V battery (optional). 3 different performance level (Standard, High & Exceptional). Easy performance upgrade possibility (when the use of building change).Operation \"mode selector with service indication diode\". Combination of dual mode selectors. Maximum distance between mode selector and door system (500 Mtr). Interlock system,Synchronisation, Partial close function (auto airing) ,Auto width ,Prolonging of hold open time, Opening delay (adjustable delay to ensure that the lock \"unlock\") open/close time-out (when close impulse is forgotten the door will close by timeout it selves).Nurse function (adjustable opening width depending on the need). Safe performance (ensure safety even without extra safety devices). Status relay output (configurable output on customer needs: doorbell, air curtain, door location) Rates shall include all items as listed above, glass, approved all weather silicon sealants with baker rod (if required), sizes as indicated in the drawings, tools, plants, wastages, preparation and submission of shop drawings for approval, scaffolding, hardware etc all complete as per drawings and as directed by the Engineer-in-charge |
| 1386 | RM Office |
| 1387 | Guest House |
| 1388 | Staff hostel |
| 1389 | Training hostel |
| 1390 | Supplying and fixing of 2-track aluminum window with powdercoated and with 6mm thick toughened (black ,Blue, green)reflective glass( Saint Gobin , ASI Make) as panel being fitted with help of rubber gasket ,roller and locks. Rates including all fitting including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1391 | 2BHK |
| 1392 | 3BHK |
| 1393 | Supplying and fixing of 3-track aluminum window with powder coated and 6mm thicktoughened (black ,Blue, green )reflective glass( Saint Gobin , ASI Make) as panel being fitted with help of rubber gasket ,roller and locks. Rates including all fittingincluding cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1394 | 2BHK |
| 1395 | 3BHK |
| 1396 | Providing and Fixing Aluminium sliding door with aluminium powder coated sections For shutters of doors, including 6mm thk toughened glass ,Tower Bolts, Handles , Stainless Steel hinges making provisions for fixing of fittings wherever required including the cost of PVC/ neoprene gasket . Rates including all fittingincluding cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1397 | 2BHK |
| 1398 | 3BHK |
| 1399 | Providing and fixing of 4 mm thick annealed SGG Planilaque Evolution (premium GRIHA rated lacquered glass) or approved equivalent manufactured industrially by curtain coating process with PU lacquer (50 micron thick), opaque (if viewed against a support wall) conforming to EN 16477 standards for back painted glass, of approved color fixed with compatible SGG Glassmate Ultrafix - Neutral Alkoxy based Silicone having or approved equivalent with Shear Bond Strength (Dry, 24 hours), greater than 450 kpa and tack free time of 10 to 30 mins compatible for installation of mirror and lacquered glass / SGG Glassmate Mirror mounting tape or approved equivalent MIRROR MOUNTING TAPE - Foam based double sided adhesive tape for instantaneous adhesion, compatible with mirror and lacquered glass having Shear bond strength (Dry, 15 mins) of 250 to 350 kpa)on a perfectly leveled 12mm thick water proof marine plywood / MDF / Mineral fibre board which is mounted on the RCC wall/any other structure.The contractor should submit test reports for backpainted glass from manufacturer -High humidity Resistance(conforms to BS EN 1036 1999); Color fastness ISO 105B02 standard & Mechanical Resistance ISO 7784 ( Taber Abrasion test ) ISO 2409 ( Cross Hatch Test ) standard The manufactured backpainted glass should be environmentally friendly (no lead, no arsenic, no copper, noformaldehyde); appropriate recycled content (12% post industrial / 6% post consumer); compressive strenght (1000 MPa) & tensile strenght (40 MPa),same as float glass.Rates shall be inclusive of all operations as listed above at all heights and levels all complete as per drawings and as directed by the Engineer-in-charge |
| 1400 | RM Office |
| 1401 | Providing and laying water proofing treatment to vertical and horizontal surfaces of depressed portions of W.C., kitchen and the like consisting of:(i) Ist course of applying cement slurry @ 4.4 kg/Sqm mixed with water proofing compound conforming to IS 2645 in recommended proportions including rounding off junction of vertical and horizontal surface.(ii) IInd course of 20 mm cement plaster 1:3 (1 cement : 3 coarse sand) mixed with water proofing compound in recommended proportion including rounding off junction of vertical and horizontal surface.(iii) IIIrd course of applying blown or residual bitumen applied hot at 1.7 kg.per Sqm of area.(iv) IVth course of 400 micron thick PVC sheet. (Overlaps at joints of PVC sheet should be 100 mm wide and pasted to Each other with bitumen @ 1.7 kg/Sqm) including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1402 | RM Office |
| 1403 | Guest House |
| 1404 | 2BHK |
| 1405 | 3BHK |
| 1406 | Officers & Club |
| 1407 | School |
| 1408 | Staff hostel |
| 1409 | Training hostel |
| 1410 | External Development |
| 1411 | Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations:(a) Applying a slurry coat of neat cement using 2.75 kg/Sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment.(b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs.(c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ Sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge.(d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4(1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surfacewith trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep.(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : |
| 1412 | RM Office |
| 1413 | Guest House |
| 1414 | 2BHK |
| 1415 | 3BHK |
| 1416 | Officers & Club |
| 1417 | School |
| 1418 | Staff hostel |
| 1419 | Training hostel |
| 1420 | External Development |
| 1421 | Providing and supplying aluminium extruded tubular and other aluminium sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. ( The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account). The weight of aluminium extruded section shall be taken for purpose of payment including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1422 | RM Office |
| 1423 | Guest House |
| 1424 | Officers & Club |
| 1425 | School |
| 1426 | Staff hostel |
| 1427 | Training hostel |
| 1428 | Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including: (a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)-cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers. (c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, Eachting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the periMtr for holding glass. (d) Providing and fixing in position flashings of solid aluminium sheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer in-Charge. |
| 1429 | RM Office |
| 1430 | Guest House |
| 1431 | Officers & Club |
| 1432 | School |
| 1433 | Staff hostel |
| 1434 | Training hostel |
| 1435 | Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthened clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor. (Payment for fixing of IGU Panels in the curtain glazing is included in cost of item No. 25.2)For payment, only the actual area of glass on face # 1 of the glass panels (excluding the areas of the grooves and weather silicone sealant) provided and fixed in position, shall be measured in Sqm. (i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement. |
| 1436 | RM Office |
| 1437 | Guest House |
| 1438 | Officers & Club |
| 1439 | School |
| 1440 | Staff hostel |
| 1441 | Training hostel |
| 1442 | Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking Eachs with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in-Charge. |
| 1443 | School |
| 1444 | Providing, fabricating and supplying shadow box of required size and shape, for fixing in the spandrel portion of the structural glazing, in linear as well as curvilinear portions of the building by providing semi -rigid, inorganic, noncombustible fibre glass wool insulation 50 mm thick, conforming to IS: 8183 and BS: 3958 Part 5. The insulation layer shall have facing (factory bonded on surface # 1 of the fibre glass insulation layer), of black non-woven fibre glass tissue of nominal thickness 0.5 mm and nominal mass not less than 60 gm / Sqm, made of randomly oriented glass fibres distributed in a binder by a wetlay process including fixing 1.5 mm thick solid aluminum sheet backing using, 6 mm thick cement board including SS rivets, nuts, bolts, washers etc including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1445 | School |
| 1446 | Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge. For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in Sqm. (Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevent Item*).“(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 K etc. . The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1447 | School |
| 1448 | Providing and fixing of 6mm thick mirror |
| 1449 | RM Office |
| 1450 | Providing of polyster fiber Acoustic panels (Ecco Board)Thickness 9mm, highly versatile, cut to any desired shape,on above frame system. Panel Size-2440mm X 1220mm. Density- 2000 gm / Sqm. NRC up to 0.70. Smoke Developed Index 300<450 by ASTM - E84 including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1451 | RM Office |
| 1452 | LIFTpassengers : 8 paxstops : ground, first & second speed : 1m/sshaft size : 1800 mm (W) x 1760 mm (D)car size : 1100 mm (W) x 1300 mm (D) car height : 2139 mmpit depth : 1400 mmoverhead : 3920 mmdoor clear opening : 800 mm (center)landing door : 800 mm (W) x 2000 mm (H)MRLMake: Kone, Otis, Schindler, TKILShop drawing to be prepared by the contractor and approved by the EIC & PMC & architect. |
| 1453 | RM Office |
| 1454 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineerin-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per Sqm, including pointing in white cement mixed with pigment of matching shade including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1455 | RM Office |
| 1456 | Guest House |
| 1457 | 2BHK |
| 1458 | 3BHK |
| 1459 | Officers & Club |
| 1460 | School |
| 1461 | Staff hostel |
| 1462 | Training hostel |
| 1463 | External Development |
| 1464 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/Sqm including pointing the joints with white cement and matching pigment etc., including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1465 | RM Office |
| 1466 | Guest House |
| 1467 | 2BHK |
| 1468 | 3BHK |
| 1469 | Officers & Club |
| 1470 | School |
| 1471 | Staff hostel |
| 1472 | Training hostel |
| 1473 | External Development |
| 1474 | Providing and laying integral cement based treatment for water proofing on the vertical surface by fixing specified stone slab 22 mm to 25 mm thick with cement slurry mixed with water proofing compound conforming to IS:2645 in recommended proportions with a gap of 20 mm (minimum) between stone slabs and the receiving surfaces and filling the gaps with neat cement slurry mixed with water proofing compound and finishing the exterior of stone slab with cement mortar 1:3 (1 cement : 3 coarse sand) 20 mm thick with neat cement punning mixed with water proofing compound in recommended proportion including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC.:Using rough kota stone.External Development |
| 1475 | Providing and laying integral cement based treatment for water proofing on horizontal surface at all depth below ground level for under ground structures including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC and consisting of :(i) Ist layer of 22 mm to 25 mm thick approved and specified rough stone slabover a 25 mm thick base of cement mortar 1:3 (1 cement : 3 coarse sand)mixed with water proofing compound conforming to IS:2645 in therecommended proportion over the leveling course (leveling course to be paidseparately). Joints sealed and grouted with cement slurry mixed with waterproofing compound.(ii) 2nd layer of 25 mm thick cement mortar 1:3 (1 cement: 3 coarse sand) mixed with water proofing compound in recommended proportions.(iii) Finishing top with stone aggregate of 10 mm to 12 mm nominal size spreading @ 8 cudm/Sqm thoroughly embedded in the 2nd layer.Using rough kota stone.External Development |
| 1476 | Providing and applying of swellable type water stop tape, 19mm x 25mm thick in linear Mtr (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running Mtr. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage.including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC.External Development |
| 1477 | Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. .External Development |
| 1478 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC.(length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer in-charge).External Development |
| 1479 | Painting runway/taxi track/apron marking with adequate Each of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. .New work (Two or more coats) External Development |
| 1480 | Extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density) including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1481 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1482 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1483 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC.(Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/Cum Excess/ less cement used as per design mix is payable/ recoverable separately.Cement concrete prepared with batch mixing machine |
| 1484 | Providing and fixing in position pre-moulded joint filler in expansion joints.1 cm. depth 1 cm. width per Mtr length including cost, coveyance, loading and unloading and of all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by the Engineer in charge & PMC. |
| 1485 | Supplying all materials, labours, T&P for fixing, Testing and Commissioning white vitreous chinawall mounting water cloSet Each of approved shape including seat cover, and fittings, nuts, bolts and gasket etc complete including cutting and making good the wall wherever required including supply of matching P/S trap to the floor with wooden plug and chromium plated screws including jointing the trap with soil pipe in cement mortar (1:1) etc all complete including cost of WC pan, PVC seat cover with CP brass hinges, 15mm dia connection pipe ALD 803 AB and rubber buffers etc all complete including cost, and conveyance as per specification including polishing etc all complete as per PH specification and direction of Engineer-in-charge. |
| 1486 | RM Office |
| 1487 | Guest House |
| 1488 | 3BHK |
| 1489 | Officers & Club |
| 1490 | Supplying all materials, labours, T&P for fixing, Testing and Commissioning white vitreous chinaOne Piece water cloEach of approved shape including seat cover, and fittings, nuts, bolts and gasket etc complete including cutting and making good to the floor with wooden plug and chromium plated screws including jointing the trap with soil pipe in cement mortar (1:1) etc all complete including cost of WC pan, PVC seat cover with CP brass hinges, 15mm dia connection pipe ALD 803 AB and rubber buffers etc all complete including cost, and conveyance as per specification including polishing etc all complete as per PH specification and direction of Engineer-in-charge. |
| 1491 | Guest House |
| 1492 | 2BHK |
| 1493 | 3BHK |
| 1494 | School |
| 1495 | Staff hostel |
| 1496 | Training hostel |
| 1497 | Supply all materials, labour,T&P for fitting and fixing , Testing and Commissioning of twin flush concealed cistern with knob and frame and fittings, nuts, bolts and gasket etc complete including cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1498 | RM Office |
| 1499 | Guest House |
| 1500 | 3BHK |
| 1501 | Officers & Club |
| 1502 | Providing, fixing, Testing and Commissioning under counter wash basin with C.I. brackets with waste of standard pattern with waste fitting, including painting of fittings and brackets, cutting and making good the walls wherever require : White Vitreous China Wash basin size 480x300 mmincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.. |
| 1503 | RM Office |
| 1504 | Guest House |
| 1505 | 2BHK |
| 1506 | 3BHK |
| 1507 | Officers & Club |
| 1508 | School |
| 1509 | Staff hostel |
| 1510 | Training hostel |
| 1511 | Providing, fixing,, Testing and CommissioningC.P. Pillar cock with aerator including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.. |
| 1512 | RM Office |
| 1513 | Guest House |
| 1514 | 2BHK |
| 1515 | 3BHK |
| 1516 | Officers & Club |
| 1517 | School |
| 1518 | Staff hostel |
| 1519 | Training hostel |
| 1520 | Providing, fixing,, Testing and CommissioningC.P. Bottle Trapincluding cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1521 | RM Office |
| 1522 | Guest House |
| 1523 | 2BHK |
| 1524 | 3BHK |
| 1525 | Officers & Club |
| 1526 | School |
| 1527 | Staff hostel |
| 1528 | Training hostel |
| 1529 | Providing, fixing, Testing and Commissioning of wall mounted satin-finish type 304 stainless steel toilet paper holder with flap completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1530 | RM Office |
| 1531 | Guest House |
| 1532 | 3BHK |
| 1533 | Providing, fixing, Testing and Commissioning of CP brass two waybib cock with wall flange including, necessary flange, cutting and making good he walls / floors wherever required completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1534 | RM Office |
| 1535 | Guest House |
| 1536 | 2BHK |
| 1537 | 3BHK |
| 1538 | Officers & Club |
| 1539 | School |
| 1540 | Staff hostel |
| 1541 | Training hostel |
| 1542 | Providing and fixing health faucet with 1.2 m ss braided hose pipe and swivel hook including all fittings completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1543 | RM Office |
| 1544 | Guest House |
| 1545 | 2BHK |
| 1546 | 3BHK |
| 1547 | Officers & Club |
| 1548 | School |
| 1549 | Staff hostel |
| 1550 | Training hostel |
| 1551 | Providing, fixing, Testing and Commissioning of Towel Ring fixedwith CP brass screw completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-Charge. |
| 1552 | RM Office |
| 1553 | Guest House |
| 1554 | 2BHK |
| 1555 | 3BHK |
| 1556 | Officers & Club |
| 1557 | School |
| 1558 | Staff hostel |
| 1559 | Training hostel |
| 1560 | Providing, fixing, Testing and Commissioning of Soap Dish fixedwith CP brass screwincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1561 | RM Office |
| 1562 | Guest House |
| 1563 | 2BHK |
| 1564 | 3BHK |
| 1565 | Officers & Club |
| 1566 | School |
| 1567 | Staff hostel |
| 1568 | Training hostel |
| 1569 | Providing, fixing, Testing and Commissioning SS surface mounted soap dispenser with horizantal tank , corriosion resistant valve dispense and 1.2 litre capacity soap refill window including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1570 | RM Office |
| 1571 | Guest House |
| 1572 | Officers & Club |
| 1573 | School |
| 1574 | Staff hostel |
| 1575 | Training hostel |
| 1576 | Providing, fixing, Testing and Commissioning 5mm thick glass of size 600x450mm mirror including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1577 | RM Office |
| 1578 | Guest House |
| 1579 | 2BHK |
| 1580 | 3BHK |
| 1581 | Officers & Club |
| 1582 | School |
| 1583 | Staff hostel |
| 1584 | Training hostel |
| 1585 | Supplying, Installation, Testing and Commissioning of hand dryer AISI 304 stainless steel finish, Auto turn off including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1586 | RM Office |
| 1587 | Providing, fixing, Testing and CommissioningC.P. angle cock with wall flange including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1588 | RM Office |
| 1589 | Guest House |
| 1590 | 2BHK |
| 1591 | 3BHK |
| 1592 | Officers & Club |
| 1593 | School |
| 1594 | Staff hostel |
| 1595 | Training hostel |
| 1596 | Providing, fixing, Testing and Commissioningpolyamid connection pipe including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1597 | RM Office |
| 1598 | Guest House |
| 1599 | 2BHK |
| 1600 | 3BHK |
| 1601 | Officers & Club |
| 1602 | School |
| 1603 | Staff hostel |
| 1604 | Training hostel |
| 1605 | Providing, fixing, Testing and Commissioning Stainless Steelkitchen sink with drain board (304 grade SS)with CI brackets and stainless steel waste with plug 40mm including painting of fittings and brackets, cutting and making good the walls wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1606 | RM Office |
| 1607 | Guest House |
| 1608 | 2BHK |
| 1609 | 3BHK |
| 1610 | Officers & Club |
| 1611 | Staff hostel |
| 1612 | Training hostel |
| 1613 | Providing, fixing, Testing and Commissioning of overhead shower of required dia and shower arm complete and making good the walls / floors wherever required completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1614 | Guest House |
| 1615 | 2BHK |
| 1616 | 3BHK |
| 1617 | Officers & Club |
| 1618 | Staff hostel |
| 1619 | Training hostel |
| 1620 | Supplying, Installation, Testing and Commissioning15mm C.P brass sink spout with swivel spout with connecting legs and wall flange complete. Including cutting and making good the walls wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1621 | RM Office |
| 1622 | Guest House |
| 1623 | 2BHK |
| 1624 | 3BHK |
| 1625 | Officers & Club |
| 1626 | Staff hostel |
| 1627 | Training hostel |
| 1628 | Providing, fixing, Testing and Commissioning bib cock with wall flange of approved quality colour and makeincluding cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1629 | Guest House |
| 1630 | 2BHK |
| 1631 | 3BHK |
| 1632 | Officers & Club |
| 1633 | School |
| 1634 | Staff hostel |
| 1635 | Training hostel |
| 1636 | Providing, fixing, Testing and Commissioning of Exposed Bath Shower Mixer (Wall Mounted) with Thermosatic Control Cartidge with Button Attachment on Spout with Connecting Legs & Wall Flanges and making good the walls / floors wherever required completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1637 | Guest House |
| 1638 | 2BHK |
| 1639 | 3BHK |
| 1640 | Officers & Club |
| 1641 | Staff hostel |
| 1642 | Training hostel |
| 1643 | Providing, fixing, Testing and Commissioningsingle lever basin mixer including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1644 | Guest House |
| 1645 | Providing, fixing, Testing and CommissioningTumbler holder including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1646 | Guest House |
| 1647 | Providing, fixing, Testing and Commissioning WC brush holder including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1648 | RM Office |
| 1649 | Guest House |
| 1650 | 2BHK |
| 1651 | 3BHK |
| 1652 | Officers & Club |
| 1653 | Staff hostel |
| 1654 | Training hostel |
| 1655 | Providing, fixing, Testing and Commissioning Glass shelf including cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1656 | RM Office |
| 1657 | Guest House |
| 1658 | 2BHK |
| 1659 | 3BHK |
| 1660 | Officers & Club |
| 1661 | Staff hostel |
| 1662 | Training hostel |
| 1663 | Providing, fixing, Testing and Commissioning Towel Rackincluding cutting and making good the wall wherever requiredincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1664 | RM Office |
| 1665 | Guest House |
| 1666 | 2BHK |
| 1667 | 3BHK |
| 1668 | Officers & Club |
| 1669 | Staff hostel |
| 1670 | Training hostel |
| 1671 | Providing and fixing pressurized electric water heater with copper sheet container of suitable length with electrical cable and 15 amp 3 pin plug top, completeincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 25 Ltr. Geyser |
| 1672 | Guest House |
| 1673 | Officers & Club |
| 1674 | Providing, fixing, Testing and Commissioningwhite vitreous urinal of approx. size 485 x 310 x 710mm having auto closing concealed urinal flush valve with wall flange along with Braided Hose, including fixing to wall with suitable bracketsincluding cutting and making good the wall wherever required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1675 | RM Office |
| 1676 | Officers & Club |
| 1677 | School |
| 1678 | Staff hostel |
| 1679 | Training hostel |
| 1680 | Providing and fixing stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6mm nominal size) including cost of all materials, labour, all, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. Agaria Marble Stone |
| 1681 | RM Office |
| 1682 | Officers & Club |
| 1683 | School |
| 1684 | Staff hostel |
| 1685 | Training hostel |
| 1686 | Providing and fixing on wall face unplasticised Rigid PVC soil, waste and rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion, required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. (i) Single socket pipes75mm diaMtr |
| 1687 | RM Office |
| 1688 | Guest House |
| 1689 | 2BHK |
| 1690 | 3BHK |
| 1691 | Officers & Club |
| 1692 | School |
| 1693 | Staff hostel |
| 1694 | Training hostel |
| 1695 | Providing and fixing on wall face unplasticised Rigid PVC soil, waste and rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion, required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. (i) Single socket pipes110mm diaMtr |
| 1696 | RM Office |
| 1697 | Guest House |
| 1698 | 2BHK |
| 1699 | 3BHK |
| 1700 | Officers & Club |
| 1701 | School |
| 1702 | Staff hostel |
| 1703 | Training hostel |
| 1704 | Providing and fixing on wall face unplasticised-PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. Coupler75mm |
| 1705 | RM Office |
| 1706 | Guest House |
| 1707 | 2BHK |
| 1708 | 3BHK |
| 1709 | Officers & Club |
| 1710 | School |
| 1711 | Staff hostel |
| 1712 | Training hostel |
| 1713 | Providing and fixing on wall face unplasticised-PVC moulded fittings / accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion required complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. Coupler110mm |
| 1714 | RM Office |
| 1715 | Guest House |
| 1716 | 2BHK |
| 1717 | 3BHK |
| 1718 | Officers & Club |
| 1719 | School |
| 1720 | Staff hostel |
| 1721 | Training hostel |
| 1722 | Single pushfit Coupler75mm required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1723 | RM Office |
| 1724 | Guest House |
| 1725 | 2BHK |
| 1726 | 3BHK |
| 1727 | Officers & Club |
| 1728 | School |
| 1729 | Staff hostel |
| 1730 | Training hostel |
| 1731 | Single pushfit Coupler110mm required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1732 | RM Office |
| 1733 | Guest House |
| 1734 | 2BHK |
| 1735 | 3BHK |
| 1736 | Officers & Club |
| 1737 | School |
| 1738 | Staff hostel |
| 1739 | Training hostel |
| 1740 | Single tee with door75x75x75 mm required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1741 | RM Office |
| 1742 | Guest House |
| 1743 | 2BHK |
| 1744 | 3BHK |
| 1745 | Officers & Club |
| 1746 | School |
| 1747 | Staff hostel |
| 1748 | Training hostel |
| 1749 | Single tee with door110x110x110 mm required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1750 | RM Office |
| 1751 | Guest House |
| 1752 | 2BHK |
| 1753 | 3BHK |
| 1754 | Officers & Club |
| 1755 | School |
| 1756 | Staff hostel |
| 1757 | Training hostel |
| 1758 | Bend 87.5°75mm dia bend required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all completerequired to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1759 | RM Office |
| 1760 | Guest House |
| 1761 | 2BHK |
| 1762 | 3BHK |
| 1763 | Officers & Club |
| 1764 | School |
| 1765 | Staff hostel |
| 1766 | Training hostel |
| 1767 | Bend 87.5°110mm dia bend required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1768 | RM Office |
| 1769 | Guest House |
| 1770 | 2BHK |
| 1771 | 3BHK |
| 1772 | Officers & Club |
| 1773 | School |
| 1774 | Staff hostel |
| 1775 | Training hostel |
| 1776 | Shoe (Plain)75 mm dia Shoe required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1777 | RM Office |
| 1778 | Guest House |
| 1779 | 2BHK |
| 1780 | 3BHK |
| 1781 | Officers & Club |
| 1782 | School |
| 1783 | Staff hostel |
| 1784 | Training hostel |
| 1785 | Shoe (Plain)110 mm dia Shoe required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1786 | RM Office |
| 1787 | Guest House |
| 1788 | 2BHK |
| 1789 | 3BHK |
| 1790 | Officers & Club |
| 1791 | School |
| 1792 | Staff hostel |
| 1793 | Training hostel |
| 1794 | Providing and Fixing on wall face un-plasticised - PVC pipe clips of approved design to un-plasticised - PVC rain water pipes by means of 50 x 50 x 50 mm hard wood plugs, screwed with M.S. screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 Cement: 4 Coarse sand) and making good the walls etc. required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.75 mm dia |
| 1795 | RM Office |
| 1796 | Guest House |
| 1797 | 2BHK |
| 1798 | 3BHK |
| 1799 | Officers & Club |
| 1800 | School |
| 1801 | Staff hostel |
| 1802 | Training hostel |
| 1803 | Providing and Fixing on wall face un-plasticised - PVC pipe clips of approved design to un-plasticised - PVC rain water pipes by means of 50 x 50 x 50 mm hard wood plugs, screwed with M.S. screws of required length including cutting brick work and fixing in cement mortar 1:4 (1 Cement: 4 Coarse sand) and making good the walls etc. required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.110 mm dia |
| 1804 | RM Office |
| 1805 | Guest House |
| 1806 | 2BHK |
| 1807 | 3BHK |
| 1808 | Officers & Club |
| 1809 | School |
| 1810 | Staff hostel |
| 1811 | Training hostel |
| 1812 | Making Khurra 45 x 45 cm with average minimum thickness of 5 cm cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate of 20 mm nominal size) over P.V.C sheet 1m x 1m x 400 microm, finished with 12 mm cement plaster 1:3 ( 1 cement : 3 coarse sand ) and a coat of neat cement, rounding the edage and making and finishing the outlet required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1813 | RM Office |
| 1814 | Guest House |
| 1815 | 2BHK |
| 1816 | 3BHK |
| 1817 | Officers & Club |
| 1818 | School |
| 1819 | Staff hostel |
| 1820 | Training hostel |
| 1821 | Providing and fixing the following uPVC pipes conforming to IS: 4985of 6 kg/sqcm for drainage system cut to required length to be laid under floor including covering all around with cement concrete required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.40 mm OD |
| 1822 | RM Office |
| 1823 | Guest House |
| 1824 | 2BHK |
| 1825 | 3BHK |
| 1826 | Officers & Club |
| 1827 | School |
| 1828 | Staff hostel |
| 1829 | Training hostel |
| 1830 | Providing and fixing the following uPVC pipes conforming to IS: 4985of 6 kg/sqcm for drainage system cut to required length to be laid under floor including covering all around with cement concrete required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 50 mmOD |
| 1831 | RM Office |
| 1832 | Guest House |
| 1833 | 2BHK |
| 1834 | 3BHK |
| 1835 | Officers & Club |
| 1836 | School |
| 1837 | Staff hostel |
| 1838 | Training hostel |
| 1839 | Providing and fixing the following uPVC pipes conforming to IS: 4985of 6 kg/sqcm for drainage system cut to required length to be laid under floor including covering all around with cement concrete required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 63 mmOD |
| 1840 | RM Office |
| 1841 | Guest House |
| 1842 | 2BHK |
| 1843 | 3BHK |
| 1844 | Officers & Club |
| 1845 | School |
| 1846 | Staff hostel |
| 1847 | Training hostel |
| 1848 | Providing and fixing uPVC, P or S trap of self cleansing design with / without vent. arm Eachting in cementconcrete 1:2:4 mix complete including cost of cutting & making good the Wall / Floors wherever required required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 110 mm inlet & 110 mm outlet |
| 1849 | RM Office |
| 1850 | Guest House |
| 1851 | 2BHK |
| 1852 | 3BHK |
| 1853 | Officers & Club |
| 1854 | School |
| 1855 | Staff hostel |
| 1856 | Training hostel |
| 1857 | Providing and fixing PVC inlet fitting with one or more inlets fabricated from 110 mm outer diaUPVC pipe and solvent welded sockets and fixed to UPVC Trap and Each in cement concrete required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1858 | RM Office |
| 1859 | Guest House |
| 1860 | 2BHK |
| 1861 | 3BHK |
| 1862 | Officers & Club |
| 1863 | School |
| 1864 | Staff hostel |
| 1865 | Training hostel |
| 1866 | Providing and fixingfloor drainwith supporting clampceiling or in sunken portion including cutting and making good the walls and floorswherever required required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. .a) 110 x63mm outlet |
| 1867 | RM Office |
| 1868 | Guest House |
| 1869 | 2BHK |
| 1870 | 3BHK |
| 1871 | Officers & Club |
| 1872 | School |
| 1873 | Staff hostel |
| 1874 | Training hostel |
| 1875 | Providing and fixing SS grating of approved quality including cutting and making good the walls and floorswherever required required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1876 | RM Office |
| 1877 | Guest House |
| 1878 | 2BHK |
| 1879 | 3BHK |
| 1880 | Officers & Club |
| 1881 | School |
| 1882 | Staff hostel |
| 1883 | Training hostel |
| 1884 | Providing and fixing End plugof approved quality including cutting and making good the walls and floorswherever required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1885 | RM Office |
| 1886 | 2BHK |
| 1887 | Officers & Club |
| 1888 | School |
| 1889 | Staff hostel |
| 1890 | Training hostel |
| 1891 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes &fittings with one step CPVC solvent cement and testing of joints complete required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.15 mm nominal outer dia pipes |
| 1892 | RM Office |
| 1893 | Guest House |
| 1894 | 2BHK |
| 1895 | 3BHK |
| 1896 | Officers & Club |
| 1897 | School |
| 1898 | Staff hostel |
| 1899 | Training hostel |
| 1900 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes &fittings with one step CPVC solvent cement and testing of joints required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.20 mm nominal outer dia pipes |
| 1901 | RM Office |
| 1902 | Guest House |
| 1903 | 2BHK |
| 1904 | 3BHK |
| 1905 | Officers & Club |
| 1906 | School |
| 1907 | Staff hostel |
| 1908 | Training hostel |
| 1909 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.25 mm nominal outer dia pipes |
| 1910 | RM Office |
| 1911 | Guest House |
| 1912 | 2BHK |
| 1913 | 3BHK |
| 1914 | Officers & Club |
| 1915 | School |
| 1916 | Staff hostel |
| 1917 | Training hostel |
| 1918 | 32 mm nominal outer dia pipes required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. |
| 1919 | RM Office |
| 1920 | Guest House |
| 1921 | 2BHK |
| 1922 | 3BHK |
| 1923 | Officers & Club |
| 1924 | School |
| 1925 | Staff hostel |
| 1926 | Training hostel |
| 1927 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.40 mm nominal outer dia pipes |
| 1928 | RM Office |
| 1929 | Guest House |
| 1930 | 2BHK |
| 1931 | Officers & Club |
| 1932 | School |
| 1933 | Staff hostel |
| 1934 | Training hostel |
| 1935 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge50 mm nominal outer dia pipes |
| 1936 | RM Office |
| 1937 | Guest House |
| 1938 | 3BHK |
| 1939 | Officers & Club |
| 1940 | School |
| 1941 | Providing and fixing PVC pipes conforming to IS:15778:2007 (Schedule-40) of the following nominal bore and pipe fittings including testing as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 65 mm nominal outer dia pipes |
| 1942 | RM Office |
| 1943 | Guest House |
| 1944 | 2BHK |
| 1945 | 3BHK |
| 1946 | Officers & Club |
| 1947 | School |
| 1948 | Providing and fixing PVC pipes conforming to IS:15778:2007 (Schedule-40) of the following nominal bore and pipe fittings including testing as per specificationrequired to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 80 mm nominal outer dia pipes |
| 1949 | RM Office |
| 1950 | 2BHK |
| 1951 | 3BHK |
| 1952 | Officers & Club |
| 1953 | School |
| 1954 | Fixing single Air Relief Valve conforming to IS 14845 : 2000 for water works purposes for the following diaMtrs including drilling the water main (Cast Iron pipes with metal straps) as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.SINGLE AIR RELIEF VALVE25mm dia Single Air Valve with metal strap for pipe |
| 1955 | RM Office |
| 1956 | Guest House |
| 1957 | 2BHK |
| 1958 | 3BHK |
| 1959 | Officers & Club |
| 1960 | School |
| 1961 | Staff hostel |
| 1962 | Training hostel |
| 1963 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.15mm diaMtr |
| 1964 | 2BHK |
| 1965 | 3BHK |
| 1966 | Staff hostel |
| 1967 | Training hostel |
| 1968 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.20mm diaMtr |
| 1969 | Guest House |
| 1970 | 2BHK |
| 1971 | 3BHK |
| 1972 | Officers & Club |
| 1973 | School |
| 1974 | Staff hostel |
| 1975 | Training hostel |
| 1976 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 25mm diaMtr |
| 1977 | RM Office |
| 1978 | Guest House |
| 1979 | 2BHK |
| 1980 | Officers & Club |
| 1981 | School |
| 1982 | Staff hostel |
| 1983 | Training hostel |
| 1984 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 32mm diaMtr |
| 1985 | RM Office |
| 1986 | 2BHK |
| 1987 | 3BHK |
| 1988 | Officers & Club |
| 1989 | School |
| 1990 | Staff hostel |
| 1991 | Training hostel |
| 1992 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 50mm diaMtr |
| 1993 | RM Office |
| 1994 | School |
| 1995 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 65mm diaMtr |
| 1996 | RM Office |
| 1997 | Guest House |
| 1998 | Officers & Club |
| 1999 | School |
| 2000 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.80mm diaMtr |
| 2001 | RM Office |
| 2002 | 2BHK |
| 2003 | 3BHK |
| 2004 | Officers & Club |
| 2005 | School |
| 2006 | Supplying, Installation, Testing and Commissioning of motorisedvalve of approved quality suitable for high or low pressure required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge. 25 mm dia |
| 2007 | RM Office |
| 2008 | Guest House |
| 2009 | Officers & Club |
| 2010 | Supplying, Installation, Testing and Commissioning of motorisedvalve of approved quality suitable for high or low pressure required to complete with all parts and internal fittings of approved make with ISI mark and supplying of necessary brackets, screws etc as per PH specification all complete as per direction of Engineer-in-charge.32 mm dia |
| 2011 | 2BHK |
| 2012 | 3BHK |
| 2013 | School |
| 2014 | Staff hostel |
| 2015 | Training hostel |
| 2016 | EXTERNAL PLUMBING & STP |
| 2017 | Supplying, installing, testing and commissioning single stage, submersible centrifugal pumps of closed coupled construction with CI body & cast iron (C.I) impeller connected to a fully submersible water/oil cooled motor suitable to operate with 380-415 volts 3 phase 50 cycles AC power supply with class F insulation and built -in temperature protection, pump connector unit with rubber diaphram & bend, vertical discharge pipe, guide pipe, stainless steel chain/rope, water -proof power cable and level controller complete in all respects for fixed installation Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.. For Sump Pump (1 Working + 1 Standby) For DrainageLocation- Plant Room Discharge 250LPM. Head 15 m |
| 2018 | Supplying, installing, testing and commissioning single stage, submersible centrifugal pumps of closed coupled construction with CI body & cast iron (C.I) impeller connected to a fully submersible water/oil cooled motor suitable to operate with 380-415 volts 3 phase 50 cycles AC power supply with class F insulation and built -in temperature protection, pump connector unit with rubber diaphram & bend, vertical discharge pipe, guide pipe, stainless steel chain/rope, water -proof power cable and level controller complete in all respects for fixed installation Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. For Sump Pump (1 Working + 1 Standby) For DrainageFor Sump Pump (1 Working + 1 Standby) For Water TransferLocation- Underground Tank Discharge -150LPM.Head-35 m . HP/Load - 2 (Approx) |
| 2019 | Providing and fixing horizontical/vertical monobloc centrifugal pumping Each with mechanical seal cast iron (C.I) volute and bronze impeller connected to a IE3 induction motor suitable for 400/440 volts, 3 phase, 50 cycles A.C. supply with 150 mm dia pressure gauge with gunmetal isolation cock, vibration eliminating for Each pump including necessary structual supports, clamps, bolts, nuts washers and 1:2:4 plain cement concreate (PCC) foundations Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.Domestic Water Transfer pump( 1 Each =1 working + 1 standby)Location-Plant RoomCapacity100 lpm.Head35 m. HP/Load1.5 HP/Load Approx. |
| 2020 | Providing and fixing horizontical/vertical monobloc centrifugal pumping Each with mechanical seal cast iron (C.I) volute and bronze impeller connected to a IE3 induction motor suitable for 400/440 volts, 3 phase, 50 cycles A.C. supply with 150 mm dia pressure gauge with gunmetal isolation cock, vibration eliminating for Each pump including necessary structual supports, clamps, bolts, nuts washers and 1:2:4 plain cement concreate (PCC) foundations Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.Domestic Water Transfer pump( 1 Each =1 working + 1 standby)Location-Irrigation Water Transfer Pump( 1 Each =1 working + 1 standby) Location-STP Plant Room.Capacity100 lpm.Head50 m.HP/Load2 HP/Load Approx. |
| 2021 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.25mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2022 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.32mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2023 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.40mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2024 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.50mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2025 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.65mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2026 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.80mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2027 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.100mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2028 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.150mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2029 | Providing and fixing mild steel (MS) puddle flanges of required size with 5mm thick mild steel (MS) plate including necessary welding as per details shown on drawings and directions of Engineer-in-charge for water tanks.200mm dia (4mm wall thickness) Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2030 | Supply, installation, testing & commissioning of Cast Iron Y-Type Strainer, PN 16 of following sizes as per specification:80 mm dia Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2031 | Supply, installation, testing & commissioning of Cast Iron Y-Type Strainer, PN 16 of following sizes as per specification:100 mm dia Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2032 | Supplying, assembly, erection, testing and commissioning of magnetic level sensors and controllers, Chlorinated Polyvinyl Chloride(CPVC) probe tube, PP actuating float and all other equipment required for the performance of the system to the satisfaction of the Engineer in charge & PMC complete including providing and fixing wiring from control junction box near the Under Ground tank to probes of required length, interconnection wiring between level controller and the concerned contactor in the starter panel as required. Level of all tanks (Under Ground and overhead tank) will be included in this item. The level controller will perform the following functionsTo switch on the pumps when the level of water in the supply water tank is low and to cut off the pump when the level in the recieving water tank is high and switch off the pumps when the level of water in the supply water tank is low .To indicate 5 levels of water in all tanks through a control panle with LEDsTo start the pumps in a cyclic order.The system shall be complete to ensure automatic quotation of pump in accordance to water level in respective tanks Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2033 | Supply, fixing, testing and commissioning of Site Tube (of 3.0 - 5 M) with isolation valve at top and bottom demarcation on tube for making the installation of level indication on the RCC water tank Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2034 | Providing, fixing, testing & commissioning of 100 mm dia Burden type, Stainless Steel dial type pressure gaugeincluding brass isolation valve and pipe having caliberation of 0-16 Kg/cm2 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2035 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating Each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kind of soil IN Pipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2036 | Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m. (Rate is over corresponding basic item for depth upto 1.5 Mtr) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2037 | Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating Each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :Ordinary rock IN Pipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2038 | Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating Each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :Hard rock IN Pipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2039 | Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding 3 m. (Rate is over corresponding basic item for depth upto 1.5 Mtr) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2040 | Laying (to level or slopes) and jointing with rubber rings pre-cast reinforced socket and spigot concrete pipes Class NP-2 conforming to IS:458 - 2003 suitable for rubber ring roll on joint of the following internal diaMtr as per specification complete.(Earthwork in trenches to be measured and paid for separately)200mm diaMtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2041 | Laying (to level or slopes) and jointing with rubber rings pre-cast reinforced socket and spigot concrete pipes Class NP-2 conforming to IS:458 - 2003 suitable for rubber ring roll on joint of the following internal diaMtr as per specification complete.(Earthwork in trenches to be measured and paid for separately)250mm diaMtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2042 | Constructing manholes with R.C.C top slab in (1:2:4) mix, foundation concrete (1:4:8), inside plaster 12mm thick with cement mortar (1:3) finished with neat cement punning, 12mm thick outside cement plaster (1:3), brick work with K.B bricks having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), cement concrete (1:2:4) finished smooth using 12mm size h.g chips, earthwork in excavation in all kinds of soil and refilling the cavity around the chamber complete as per specification.Plain Manholes inside size 900mm x 800mm and 450mm deep - Type AWith RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2043 | Constructing manholes with R.C.C top slab in (1:2:4) mix, foundation concrete (1:4:8), inside plaster 12mm thick with cement mortar (1:3) finished with neat cement punning, 12mm thick outside cement plaster (1:3), brick work with K.B bricks having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), cement concrete (1:2:4) finished smooth using 12mm size h.g chips, earthwork in excavation in all kinds of soil and refilling the cavity around the chamber complete as per specification.Rectangular Manhole inside size 1200mm x 900mm and 900mm deep - Type - BWith RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2044 | Construction of circular type manhole with top slab made of cement concrete 1:2:4 using 12mm size hard granite chips foundation concrete (1:4:8) using 40mm size hard granite metal on bed, walls made of brick masonry using 1st class K.B bricks (25 Cm x 12Cm x 8Cm) having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), inside plastering 12mm thick (1:3) finished smooth with neat cement punning, outside plaster (1:3) and making channels with cement concrete (1:2:4) using 12mm size h.g chips complete as per specification.900mm internal diaMtr x 1110mm depth with sides sloped upto 560mm internal diaMtr at top With RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2045 | Construction of circular type manhole with top slab made of cement concrete 1:2:4 using 12mm size hard granite chips foundation concrete (1:4:8) using 40mm size hard granite metal on bed, walls made of brick masonry using 1st class K.B bricks (25 Cm x 12Cm x 8Cm) having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), inside plastering 12mm thick (1:3) finished smooth with neat cement punning, outside plaster (1:3) and making channels with cement concrete (1:2:4) using 12mm size h.g chips complete as per specification.1200mm internal diaMtr x 1670mm depthWith RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2046 | Extra for every additional depth of 0.10m or part thereof above 1100mm upto 1650mmdepth in circular Manhole 900mm internal diaMtr as in item No. 4.2.4 [A] Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2047 | Extra for every additional depth of 0.10m or part thereof above 1670mm upto 2300mm depth in circular Manhole 1200mm internal diaMtr as in item No. 4.2.4 [ B ] Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2048 | Constructing brick masonry circular manhole 1.52 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design :2.30 m deep with SFRC Cover and frame (heavy duty HD- 20 grade designation) 560 mm internal diaMtr conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg. fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately) :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2049 | Extra depth for circular type manhole 1.52 m internal dia (at bottom) beyond 2.30 m :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2050 | Making MS step iron in 20mm diaMtr MS steel bars and fixing into walls of Manhole duly embedded in cement concrete (1:3:6) complete as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2051 | Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I.grating brick masonry chamber with water tight C.I. cover with frame of 300x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design150mm x 100mm size Square Mouth Trap P type Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2052 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating Each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kind of soilPipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2053 | Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m. (Rate is over corresponding basic item for depth upto 1.5 Mtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2054 | Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating Each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :Ordinary rockPipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2055 | Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth upto 1.5 m, including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth, including consolidating Each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m :Hard rockPipes, cables etc, exceeding 80mm dia but not exeeding 300 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2056 | Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock exceeding 1.5 m in depth but not exceeding 3 m. (Rate is over corresponding basic item for depth upto 1.5 Mtr) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2057 | Laying (to level or slopes) and jointing with rubber rings pre-cast reinforced socket and spigot concrete pipes Class NP-2 conforming to IS:458 - 2003 suitable for rubber ring roll on joint of the following internal diaMtr as per specification complete.(Earthwork in trenches to be measured and paid for separately)150mm diaMtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2058 | Laying (to level or slopes) and jointing with rubber rings pre-cast reinforced socket and spigot concrete pipes Class NP-2 conforming to IS:458 - 2003 suitable for rubber ring roll on joint of the following internal diaMtr as per specification complete.(Earthwork in trenches to be measured and paid for separately)200mm diaMtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2059 | Construction of circular type manhole with top slab made of cement concrete 1:2:4 using 12mm size hard granite chips foundation concrete (1:4:8) using 40mm size hard granite metal on bed, walls made of brick masonry using 1st class K.B bricks (25 Cm x 12Cm x 8Cm) having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), inside plastering 12mm thick (1:3) finished smooth with neat cement punning, outside plaster (1:3) and making channels with cement concrete (1:2:4) using 12mm size h.g chips complete as per specification.900mm internal diaMtr x 1110mm depth with sides sloped upto 560mm internal diaMtr at topWith RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2060 | Construction of circular type manhole with top slab made of cement concrete 1:2:4 using 12mm size hard granite chips foundation concrete (1:4:8) using 40mm size hard granite metal on bed, walls made of brick masonry using 1st class K.B bricks (25 Cm x 12Cm x 8Cm) having crushing strength not less than 75kg/cm² with dimensional tolerance ± 8 percent in cement mortar (1:5), inside plastering 12mm thick (1:3) finished smooth with neat cement punning, outside plaster (1:3) and making channels with cement concrete (1:2:4) using 12mm size h.g chips complete as per specification1200mm internal diaMtr x 1670mmWith RCC precast cover Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2061 | Extra for every additional depth of 0.10m or part thereof above 1100mm upto 1650mmdepth in circular Manhole 900mm internal diaMtr as in item No. 4.2.4 [A] Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2062 | Extra for every additional depth of 0.10m or part thereof above 1670mm upto 2300mm depth in circular Manhole 1200mm internal diaMtr as in item No. 4.2.4 [ B ] Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2063 | Making MS step iron in 20mm diaMtr MS steel bars and fixing into walls of Manhole duly embedded in cement concrete (1:3:6) complete as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2064 | Constructing brick masonry road gully chamber 50x45x60 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm pre-cast R.C.C. horizontal grating with frame complete as per standard design :with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2065 | Boring/ Drilling bore well of required dia for casing strainer pipe by sutable method prescribed in IS 2800(Part I), Inculding collecting samples from different strata, preparing and submitting strata chart/bore log, Including hire& running charges of all equipments, tools , plants& machineries required for the job, all Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. upto 90 Mtr depth below ground level All type of soil 300mm dia |
| 2066 | Boring/ Drilling bore well of required dia for casing strainer pipe by sutable method prescribed in IS 2800(Part I), Inculding collecting samples from different strata, preparing and submitting strata chart/bore log, Including hire& running charges of all equipments, tools , plants& machineries required for the job, Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. upto 90 Mtr depth below ground levelRocky stratra including boulders 300 dia |
| 2067 | Supplying , assembling, lowering and fixing in vertical postion in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS 12818, including required hire and labour charges, fitting& accessories etc.all complete for all depths as per direction of engineer-in-charge .150mm dia nominal size dia |
| 2068 | Supplying .assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well.screen (RMS) pipes with ribs, conforming to IS. 12818, including hire & labour charges, fittings & accessories etc. all complete for all depths as per direction of engineer-in-charge. 150mm noninal size dia.150mm dia nominal size dia |
| 2069 | Supply, filling, spreading & leveling stone boulders of size range 5cm to 20cm, in recharge pit, thickness, for all leads and lifts, all complete as per direction Engineer in charge & PMC. |
| 2070 | Gravel packing in tube well construction in accordance with IS 4097, including providing graval fine/medium coarse, in required grading & sizes as per actual requirement , all completeas per direction of engineer-in charge. |
| 2071 | Filling available excavated earth ( Excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating Each deposited layer by ramming and water. Lead up to 50 m andlift uoto 1.5 m. Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2072 | Extra for every addition lift of 1.5 m or part thereof in excavation/ banking excavated or stacked materials. All kinds of soil.Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2073 | Providing and fixing in position pre-cast RCC manhole covers and frame of required shape and approved qualityH D - 20 Circular shape 560 mm internal diaMtr Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2074 | Providing and fixing suitable size threaded mild steel cap or shot welded plate to the top of borewell housing chasing pipe as per removable as per requirement, all complete for borewellof:200mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2075 | Providing and fixing Bail plug/Bottom plug of required dia to the bottom of pipe assembly of tubewell as per IS:2800 (Part-I) .150mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2076 | Providing orange colour safety foot rest of minimum 6mm thick plastic encapsulated as per IS:10910, on 12mm dia steel bar conforming to IS: 1786, having minimum cross section as 23mm X 25mm and over all minimum length 263mm and width as 165mm with minimum 112 mm space between protruded legs having 2mm tread on top surface by ribbing or chequiring besides necessary and adequate anchoring projection on tail length on 138mm as per standard drawing and suitable to with stand the bend test and chemical resistance identification mark to be visible even after fixing,including fixing manhole with 30X20X15cm cement concrete block 1:3:6(1 cement: 3 Coarse sand: 6 graded stone aggregrate 20mm nominal size) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2077 | Constructing brick masonry manhole (silt chamber type) inside size 1.20X0.90c 1.20m deep with FPS brick class designation 75 in cement mortar 1:4 (1 Cement: 4 coarse sand ) 15mm thick RCC top slab with 500mm dia opening in cement concrete 1:2:4 (1 cement: 2 C/sand: 4 gradedstone agg, n/size reinforced with 18.92 kg cold twisted sreel bars 20cm foundation concrete 1:4:8 (1 cement: 4 C/sand: 8 gradedstone agg 40mm size) inside plastering 12 mm thick with cement mortar 1:3 (1 cement: 3 C/sand) finished with a foating coat of neat cement and providing 75 mm thick bed concrete in 1:2:4 mix (1 cement: 2 C/sand: 4 graded stoneagg . 20mm n/size) including neat cement punning inside the manhole complete as per standard design/depth shall be measured from invert level of manhole excluding cost of manhole cover and frame which shall be paid for separately etc.Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2078 | Extra for depth for manhole size ( 120cmx90cm) with common burnt clay F.P.S ( non-modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2079 | Carriage of Material by mechanical transport including loading ,unloading etc. Complete lead1 km the place of disposal shall be approved by the engineer-in- charge |
| 2080 | Providing and laying in position cement concrete of specificed grade excluding the cost of centering and shuttering - All work upto plinth level 1:5:10 (1 Cement: 5 coarse sand: 10 graded stone aggregate 40mm niminal size) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2081 | Providing and laying in position cement concrete of specificed grade excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 (1 Cement: 2 coarse sand: 4 graded stone aggregate 20mm niminal size) Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2082 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 25 mm nominal outer dia Pipes |
| 2083 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 32 mm nominal outer dia Pipes |
| 2084 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 40 mm nominal outer dia Pipes |
| 2085 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 50 mm nominal outer dia Pipes |
| 2086 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 62.5 mm nominal outer dia Pipes |
| 2087 | Providing and fixing Chlorinated Polyvinyl Chloride (UPVC) pipes conforming to IS 15778, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.100 mm nominal outer dia Pipes |
| 2088 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. .25mm diaMtr |
| 2089 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. .32mm diaMtr |
| 2090 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. .40mm diaMtr |
| 2091 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 50mm diaMtr |
| 2092 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. .65mm diaMtr |
| 2093 | Fixing of Brass or Gun Metal Full Way Valve conforming to IS:781-1995 of the following nominal sizes with wheel as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 100mm diaMtr |
| 2094 | Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. :With common burnt clay F.P.S (non modular)bricks of class designation7.5 |
| 2095 | Constructing masonry Chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve,with C.I. surface box 100 mm top diaMtr, 160 mm bottom diaMtr and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size ), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominalsize ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2096 | Constructing masonry Chamber 60x45x50 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for water Mtr complete with C.I. double flap surface box 400x200x200 mm (inside) with locking arrangement and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) , i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand:10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2097 | Providing and fixing C.I. dirt box strainer for bulk type water Mtr with nuts, bolts, rubber insertions etc. complete conforming to IS : 2373-1981.80 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2098 | Providing and fixing C.I. dirt box strainer for bulk type water Mtr with nuts, bolts, rubber insertions etc. complete conforming to IS : 2373-1981.100 mm dia Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2099 | Fixing of water Mtrs (Domestic Type) conforming to IS :779-1994 and Stop Cock in GI Mild Steel pipe / PVC pipe / PE pipe of the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 25 mm diaMtr |
| 2100 | Fixing of water Mtrs (Domestic Type) conforming to IS :779-1994 and Stop Cock in GI Mild Steel pipe / PVC pipe / PE pipe of the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 32 mm diaMtr |
| 2101 | Fixing of water Mtrs (Domestic Type) conforming to IS :779-1994 and Stop Cock in GI Mild Steel pipe / PVC pipe / PE pipe of the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 40 mm diaMtr |
| 2102 | Fixing of water Mtrs (Domestic Type) conforming to IS :779-1994 and Stop Cock in GI Mild Steel pipe / PVC pipe / PE pipe of the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 50 mm diaMtr |
| 2103 | Fixing of Water Mtrs (Bulk Type) conforming to IS:2373-1981 Vane Wheel type Mtr or Helical type Mtr or water Mtr Dry Dial type or water Mtr Wet Dial type with double flanged ends for the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 80 mm diaMtr |
| 2104 | Fixing of Water Mtrs (Bulk Type) conforming to IS:2373-1981 Vane Wheel type Mtr or Helical type Mtr or water Mtr Dry Dial type or water Mtr Wet Dial type with double flanged ends for the following nominal diaMtr as per specification Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 100 mm diaMtr |
| 2105 | Boring/drilling bore well of required dia for casing / strainer pipe, by suitable method prescribed in IS:2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, all Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. upto 90 Mtr depth below ground level. Rocky strata including Boulders300mm dia |
| 2106 | Boring/drilling bore well of required dia for casing / strainer pipe, by suitable method prescribed in IS:2800 (part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools, plants & machineries required for the job, Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.beyound 90 Mtr & upto 150 Mtr depth below ground level. Rocky strata including Boulders300mm dia |
| 2107 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc.External work 65 mm dia nominal bore Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2108 | Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete,Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.150 mm nominal size dia |
| 2109 | Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs conforming to IS: 12818, includinghire and labour charges, fittings & accessories etc.Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.150 mm nominal size dia |
| 2110 | Gravel packing in tubewell construction in accordance with IS: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2111 | Development of tube well in accordance with IS:2800 (part I) and IS: 11189, to establish maximum rate of usable water yield without sand content (beyond permissible limit), with required capacity air compressor, running the compressor for required time till well is fully developed, measuring yield of well by \"\"V\"\" notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory, i/c disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2112 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. for borewell of:200 mm dia |
| 2113 | Providing and fixing MS clamps of required dia on the top of the casing / housing pipe of tube well as per IS : 2800 (Part-1) , including necessary boltsand nuts of required size Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.150 mm dia |
| 2114 | Providing and fixing bail plug / bottom plug of required dia at the bottom of the pipe assambley as per IS: 2800 (Part-1).Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. 150 mm dia |
| 2115 | Supply, installation testing & commissioning of submersible pumping Each suitable to operate on 410 volts 3 phase 50 HZ A.C. power supply including water proof joint free cable, motor control panel, 50 mm dia, G.I. pipe (medium class) column with fittings, clamps etc. Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC.as per details given below : (For Borewell)Discharge150 LPM.HP/Load3.5 (Approx) |
| 2116 | Supply, installation, Testing and commissioning of Sewage Treatment Plant based on attached growth technology using the \"Moving Aerated Bio-media Reactor\" (MBBR) process complete mechanical and electrical Items with stand by pumps as mentioned below for STP.Electro Mechanical Work Bar Screen- 2 Each Level Switch- 1 Each Sewage lifting pump- 2 Each Plant Room Sump Pump- 2 Each.Air Blower- 2 Each. Air dispersion system. Fine bubble diffuser- 1 lot. Corse bubble diffuser- 1 lot. Air piping- 1 lot. Sludge recirculation pump- 2 Each. Filter press (Manual)- 2 Each. Screw pump- 2 Each. MBBR media- 1 lot. Tube Eachtler media- 1 lot. Filter feed pump- 2 Each. Multigrade Filter- 1 no. Activated carbon filter- 1 no. Pressure guage- 1 lot. Dosing pump- 1 no. Piping & Fitting- 1 lot. Electrical control panel- 1 no. Electro Magnetic Flow Mtr- 1 no. Cable & Cable tray- 1 no. Ulta violet (UV) System- 1 no. 5 KLD MBBR STP Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2117 | Supply, installation, Testing and commissioning of Sewage Treatment Plant based on attached growth technology using the \"Moving Aerated Bio-media Reactor\" (MBBR) process complete mechanical and electrical Items with stand by pumps as mentioned below for STP.Electro Mechanical Work Bar Screen- 2 Each Level Switch- 1 Each Sewage lifting pump- 2 Each Plant Room Sump Pump- 2 Each.Air Blower- 2 Each. Air dispersion system. Fine bubble diffuser- 1 lot. Corse bubble diffuser- 1 lot. Air piping- 1 lot. Sludge recirculation pump- 2 Each. Filter press (Manual)- 2 Each. Screw pump- 2 Each. MBBR media- 1 lot. Tube Eachtler media- 1 lot. Filter feed pump- 2 Each. Multigrade Filter- 1 no. Activated carbon filter- 1 no. Pressure guage- 1 lot. Dosing pump- 1 no. Piping & Fitting- 1 lot. Electrical control panel- 1 no. Electro Magnetic Flow Mtr- 1 no. Cable & Cable tray- 1 no. Ulta violet (UV) System- 1 no. 15 KLD MBBR STP Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2118 | Supply, installation, Testing and commissioning of Sewage Treatment Plant based on attached growth technology using the \"Moving Aerated Bio-media Reactor\" (MBBR) process complete mechanical and electrical Items with stand by pumps as mentioned below for STP.Electro Mechanical Work Bar Screen- 2 Each Level Switch- 1 Each Sewage lifting pump- 2 Each Plant Room Sump Pump- 2 Each.Air Blower- 2 Each. Air dispersion system. Fine bubble diffuser- 1 lot. Corse bubble diffuser- 1 lot. Air piping- 1 lot. Sludge recirculation pump- 2 Each. Filter press (Manual)- 2 Each. Screw pump- 2 Each. MBBR media- 1 lot. Tube Eachtler media- 1 lot. Filter feed pump- 2 Each. Multigrade Filter- 1 no. Activated carbon filter- 1 no. Pressure guage- 1 lot. Dosing pump- 1 no. Piping & Fitting- 1 lot. Electrical control panel- 1 no. Electro Magnetic Flow Mtr- 1 no. Cable & Cable tray- 1 no. Ulta violet (UV) System- 1 no. 82 KLD MBBR STPComplete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2119 | URRBAN DEVELOPMENT |
| 2120 | Providing and fixing ofsignage, in reception area of buildingas per artwork/logo, of name of the building, with letter height 2\" and material SS/Acryllic Box Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2121 | Providing and fixing offlooridentification signage , depicting floor number/name in all vertical cores and lift lobbies, in 5mm thk acryllic with duco / Vinyl Finish as per approved colour and design scheme, of size 3\" x 2\" and fixed with 3m Tape/ Equivalent.Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2122 | Providing and fixing of flooridentification signage , depicting way finding for respective floors in8mmthktoughened glass with letters made in acryllic / Vinyl Finish as per approved colour and design scheme, of size 3\" x 5\". Fixed in wall with frame / studs Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2123 | Providing and fixing of roomsignage , for Each roomdoor in 5mmacryllic , with text laser cut / vinyl pasted as per approved colour and design scheme, of size 10\" x 4\" and fixed with3m Tape / EquivalentComplete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2124 | Providing and fixing of floorchangable sliding namesignage , for Each cabin door in 5mm acryllic, text in vinyl as per approved colour and design scheme, of size 18\" x 9\" and fixed with 3m Tape/ Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2125 | Providing and fixing of departmental signage at entrance to various zones/departments5mm acryllic with duco finish, hanged/mounted fro ceiling with chain/screws and text in vinylas per approved colour and design scheme, of size 18\" x 9\". Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2126 | Providing and fixing of work station stickers, depicting workstation number on Each work station , in vinyl as per approved color and artwork in size 6\" x 6\" Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2127 | Providing and fixing of push pull signage on Each side of all door, except fire doors in stainless steel / acryllic with text in vinyl / laser cut as per approved colour and design scheme, of size 8\" x 4\" and fixed with 3m Tape/ Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2128 | Providing and fixing of double sided toilet signage in corridor5mm acryllic with duco finish, hanged/mounted from wall with chain/screws and text in vinylas per approved colour and design scheme, of size 15\" x 12\" Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2129 | Providing and fixing of toilet signage on toilet doors, 5mm acryllic with duco finish, hanged/mounted from wall with chain/screws and text in vinylas per approved colour and design scheme, of size 12\" x 12\" Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2130 | 5mm acrylic and vinyl Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2131 | Cabinet: (1) MS Square Pipe 20 mm X 20 mm [18 guage] for framing with one coat of red oxide & 2 coats of oil paint to avoid rusting.(2) Powder coated 24 guage GI sheets on Top, Bottom & Sides. (3) Pre coated GI Sheet of 26 gauges for back cover.(4) Aluminium extruded L Angle system for flex tensioning & Edge lighting(5) The Depth of the box not to be greater than 6 inches.Illumination Source: (1) LED modules with IP67 rating with 3years warranty from the OEM. (2) LEDs with dust free and water proof compliance properties.(3) LEDs and Fascia to be optimized to offer best possible aesthetical output & energy saving.Fascia: (1) 22-mil, white pigmented vinyl substrate with a polyester scrim with 2mil translucent Matte surface finish thateliminates glare. The film shouldhave Synthetic, lay-flat liner that is not affected by water or humidity.(2) MCS online Warranty of 5 years from manufacturer of the vinyl and subtrate for Indian weatherand dust conditions without any restrictive sub clauses.Size:- 18\"\" letter height Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2132 | Providing and fixing of stair signage on staircase doors, 5mm acryllic with duco finish, hanged/mounted from wall with chain/screws and text in vinylas per approved colour and design scheme, of size 12\" x 12\" Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2133 | Providing and Fixing LED Signage to be made of Aluminium Frame box letters with Acrylic sheet . Illuminted via LED Module . Size 2\" letter height Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2134 | Providing and fixing of fire signage as per approved fire norm symbol, with acrlliyic base and reflective vinyl sticker , size 6\" x 6\" , fixed with 3m tape/ Equivalent.Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2135 | Providing and fixing ofprolite fire signage as per approved fire norm symbol, with 1 year warranty and battery backup, size 9\" x 6\" Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2136 | Providing and fixing of fire signage as per approved fire norm symbol, with acrlliyic base and reflective vinyl sticker , size 6\" x 6\" , fixed with 3m Tape/ Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2137 | Providing and fixing of fire evacuation map signage as per approved fire norms , with acrlliyic base and reflective vinyl sticker , size 3\" x 2\" , fixed with 3m tape Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2138 | Providing and fixing of advisory signage as per approved symbol, with acrlliyic base andvinyl sticker , size 6\" x 6\" , fixed with 3m Tape / Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2139 | Providing and fixing of advisory signage as per approved symbol, with acrlliyic base andvinyl sticker , size 6\" x 6\" , fixed with 3m tape Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2140 | Providing and fixing of advisory signage as per approved symbol, with acrlliyic base andvinyl sticker , size 6\" x 6\" , fixed with 3m Tape / Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2141 | Providing and fixing of advisory signage as per approved symbol, with acrlliyic base andvinyl sticker , size 6\" x 6\" , fixed with 3m Tape / Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2142 | Providing and fixing of fire signage as per approved fire norm symbol, with acrlliyic base and reflective vinyl sticker , size 6\" x 6\" , fixed with 3m Tape / Equivalent Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2143 | Providing and fixing of 3m vinyl/ Equivalent graphic - NON PVC with 5 year warranty onWalls, with pre finished primer base surface , as per approved size, graphic design Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2144 | Providing and fixing of 3m Frosted film/ Equivalentwith 5 year warranty on glass, with approved cutting design, non printed Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2145 | Providing and fixing of 3m Frosted film / Equivalentwith 5 year warranty on glass, with approved cutting design, printed with graphic as per design Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2146 | Concrete bench- Supply of concrete bench as per approved design casted in FRP, sheet metal or equivalent mould for uniform surface straightness and appropriate edge fillet with M20 concrete mix. The outer surface need to be coated with sealer Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2147 | Concrete Dustbin - Supply of concrete dustbin as per approved design casted in FRP, sheet metal or equivalent mould for uniform surface straightness and appropriate edge fillet with M20 concrete mix. The outer surface need to be coated with sealer Complete. with cost , conveyance of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC & PMC. |
| 2148 | INTERNAL AND EXTERNALELECTRIFICATION |
| 2149 | MAIN LT PANELL. T. PANEL SYSTEMS.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:All ACBs shall have:: Inbuilt TRIP LED indication.: Ics = Icu = Icw for 1 sec.for the breakers with built-in micro-processor based releases, : Adjustable over current with time Setting, short circuit with time Setting, earth fault with time Setting.: R,Y,B phase indication lamps (LED Type) with Control MCB / MPCB as per fault requirement.: Instantaneous short circuitAll MCCBs shall have:: Ics = Icu = 100% for the breakers.: MCCB\"s upto 250A shall be with thermal - magnetic releases and beyond 250A shall be with micro-processor based releases.: MCCB\"s shall be with extended rotary handle. |
| 2150 | S.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:INCOMER:(EDO) ACBs, MCCB & Contactor shall be as per SLD as follows with required controls::415 V, 50 Hz, 630 A, 4Pole (EDO) ACB : 1 No. (Trf. incomer):415 V, 50 Hz, 630 A, 4Pole (EDO) ACB : 1 No. (Bus Coupler):415 V, 50 Hz, 500 A, 4Pole MCCB : 1 No. (DG-1 incomer):415 V, 50 Hz, 500 A, 4Pole Contactor: 1 No. (DG-1 incomer):415 V, 50 Hz, 160 A, 4Pole MCCB : 1 No. (DG-2 incomer):415 V, 50 Hz, 160 A, 4Pole Contactor: 1 No. (DG-2 incomer)BUS BARS::630A TP + N Aluminium suitable for 1.1 K V with a fault level with-stand: 16 K A for 1 second in two parts as per SLD. The Earth Bus shall be of CU & run contnuously throughout the width of the panel. |
| 2151 | OUTGOING::415 V, 50 Hz, 320 A, 3Pole MCCB: 1 Nos.(Cap. Bank i/c):415 V, 50 Hz, 400 A, 4Pole MCCB : 2 Nos.:415 V, 50 Hz, 200 A, 4Pole MCCB : 1 Nos.:415 V, 50 Hz, 160 A, 4Pole MCCB : 1 Nos.:415 V, 50 Hz, 100 A, 4Pole MCCB : 6 Nos.:415 V, 50 Hz, 63 A, 4Pole MCCB : 8 Nos.:415 V, 50 Hz, 40 A, 4Pole MCCB : 1 Nos.:Protection of the feeders as required.: All controls, Annunciations and indications for safe and trouble-Free operation of the D G Set.: The operational sequence shall be PLC controlled as per the scheme in the SLD. : 140 KVAR TP Capacitor Bank, Delta connected in (=25*4+10*2+5*4) KVAR units with 7% de-tuned reactor, 440V, 50Hz complete with digital APFC Relay and automatic switching arrangement, suitably sized protection MCCBs/MCBs, Contactors, Auto / Manual selector switches and indicators for selecting the operating mode - all factory wired. Capacitor bank shall be suitable for heavy duty, 480V, 50 Hz, 3 Ph, 4 Wire system. |
| 2152 | :Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2153 | R.M OFFICE, DAITARI |
| 2154 | PANELS / MDB & DISTRIBUTION BOARD (DB) & UPS SYSTEML. T. PANEL SYSTEMS.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:All ACBs shall have:: Inbuilt TRIP LED indication.: Ics = Icu = Icw for 1 sec.for the breakers with built-in micro-processor based releases, : Adjustable over current with time Setting, short circuit with time Setting, earth fault with time Setting.: R,Y,B phase indication lamps (LED Type) with Control MCB / MPCB as per fault requirement.: Instantaneous short circuitAll MCCBs shall have:: Ics = Icu = 100% for the breakers.: MCCB\"s upto 250A shall be with thermal - magnetic releases and beyond 250A shall be with micro-processor based releases.: MCCB\"s shall be with extended rotary handle. |
| 2155 | S.I.T.C of Main LT Panel shall be Indoor, sheet steel metal clad, floor mounted, type conforming to (latest edition) of I S: 8623/IEC: 61439-1 (PTTA type)and IEC: 60947/I S: 13947, 1993for control gear & switch gear with an enclosure protection of IP 52 as per I S: 2147. The LT panel:- This PTTA type, shall be type tested as per the I S: 8623 standard for PTTA panel. :All the equipment shall be accessible from the front side of the panel in case of ‘Single front panel without adequate back excess. Protection relays, KWH & indicating meters, etc. shall be mounted on front door; when required. :Provided with anti-condensation space heaters, thermostat controlled & back-up protection (MCB) in Each bay; rated for 240Volts, single phase, 50Hz. AC. Power supply. The space heater shall be of 100W rating (Each). Cubicles shall be provided with LED lamps with control switches and suitable sockets.:The switch over of power between the Mains power and DG Power shall take place with suitably sized (EDO) ACBs / MCCBs or Contractor in the Main LT Panel following AMF & the electrical / mechanical inter-locking scheme in the SLD. In any which condition main power and DG power shall not be feeding main Bus. & also DG sync. / parallel operation shall not be planned. :The components in the Main LT Panel shall be as follows: |
| 2156 | INCOMER:(EDO) ACBs, MCCB & Contactor shall be as per SLD as follows with required controls::415 V, 50 Hz, 250 A, 4Pole MCCB : 1 No. (Trf. incomer):415 V, 50 Hz, 250 A, 4Pole Contactor: 1 No. (Trf. incomer):415 V, 50 Hz, 250 A, 4Pole MCCB : 1 No. (Bus Coupler):415 V, 50 Hz, 250 A, 4Pole Contactor: 1 No. (Bus Coupler):415 V, 50 Hz, 125 A, 4Pole MCCB : 1 No. (DG-1 incomer):415 V, 50 Hz, 125 A, 4Pole Contactor: 1 No. (DG-1 incomer):415 V, 50 Hz, 63 A, 4Pole MCCB : 1 No. (DG-2 incomer):415 V, 50 Hz, 63 A, 4Pole Contactor: 1 No. (DG-2 incomer)BUS BARS::250A TP + N Aluminium suitable for 1.1 K V with a fault level with-stand: 16 K A for 1 second in two parts as per SLD. The Earth Bus shall be of CU & run contnuously throughout the width of the panel. |
| 2157 | OUTGOING::415 V, 50 Hz, 100 A, 3Pole MCCB: 1 Nos.(Cap. Bank i/c):415 V, 50 Hz, 100 A, 4Pole MCCB : 3 Nos.:415 V, 50 Hz, 63 A, 4Pole MCCB : 4 Nos.:415 V, 50 Hz, 40 A, 4Pole MCCB : 5 Nos.:230 V, 50 Hz, 40 A, 2Pole MCCB : 1 Nos.:Protection of the feeders as required.: All controls, Annunciations and indications for safe and trouble-Free operation of the D G Set.: The operational sequence shall be PLC controlled as per the scheme in the SLD. : 44 KVAR TP Capacitor Bank, Delta connected in (=10*2+5*4+2*2) KVAR units with 7% de-tuned reactor, 440V, 50Hz complete with digital APFC Relay and automatic switching arrangement, suitably sized protection MCCBs/MCBs, Contactors, Auto / Manual selector switches and indicators for selecting the operating mode - all factory wired. Capacitor bank shall be suitable for heavy duty, 480V, 50 Hz, 3 Ph, 4 Wire system. |
| 2158 | :Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2159 | GUEST HOUSE |
| 2160 | MAIN LT PANELL. T. PANEL SYSTEMS.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:All ACBs shall have:: Inbuilt TRIP LED indication.: Ics = Icu = Icw for 1 sec.for the breakers with built-in micro-processor based releases, : Adjustable over current with time Setting, short circuit with time Setting, earth fault with time Setting.: R,Y,B phase indication lamps (LED Type) with Control MCB / MPCB as per fault requirement.: Instantaneous short circuitAll MCCBs shall have:: Ics = Icu = 100% for the breakers.: MCCB\"s upto 250A shall be with thermal - magnetic releases and beyond 250A shall be with micro-processor based releases.: MCCB\"s shall be with extended rotary handle. |
| 2161 | S.I.T.C of Main LT Panel shall be Indoor, sheet steel metal clad, floor mounted, type conforming to (latest edition) of I S: 8623/IEC: 61439-1 (PTTA type)and IEC: 60947/I S: 13947, 1993for control gear & switch gear with an enclosure protection of IP 52 as per I S: 2147. The LT panel:- This PTTA type, shall be type tested as per the I S: 8623 standard for PTTA panel. :All the equipment shall be accessible from the front side of the panel in case of ‘Single front panel without adequate back excess. Protection relays, KWH & indicating meters, etc. shall be mounted on front door; when required. :Provided with anti-condensation space heaters, thermostat controlled & back-up protection (MCB) in Each bay; rated for 240Volts, single phase, 50Hz. AC. Power supply. The space heater shall be of 100W rating (Each). Cubicles shall be provided with LED lamps with control switches and suitable sockets.:The switch over of power between the Mains power and DG Power shall take place with suitably sized (EDO) ACBs / MCCBs or Contractor in the Main LT Panel following AMF & the electrical / mechanical inter-locking scheme in the SLD. In any which condition main power and DG power shall not be feeding main Bus. & also DG sync. / parallel operation shall not be planned. :The components in the Main LT Panel shall be as follows: |
| 2162 | INCOMER:(EDO) ACBs, MCCB & Contactor shall be as per SLD as follows with required controls::415 V, 50 Hz, 315 A, 4Pole MCCB : 1 No. (Trf. incomer):415 V, 50 Hz, 315 A, 4Pole Contactor: 1 No. (Trf. incomer):415 V, 50 Hz, 315 A, 4Pole MCCB : 1 No. (Bus Coupler-1):415 V, 50 Hz, 315 A, 4Pole Contactor: 1 No. (Bus Coupler-1):415 V, 50 Hz, 160 A, 4Pole MCCB : 1 No. (DG incomer):415 V, 50 Hz, 160 A, 4Pole Contactor: 1 No. (DG incomer)BUS BARS::315A TP + N Aluminium suitable for 1.1 K V with a fault level with-stand: 16 K A for 1 second in Three parts as per SLD. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.OUTGOING;:415 V, 50 Hz, 125 A, 3Pole MCCB: 1 Nos.(Cap. Bank i/c):415 V, 50 Hz, 200 A, 4Pole MCCB : 1 Nos.:415 V, 50 Hz, 160 A, 4Pole MCCB : 2 Nos.:415 V, 50 Hz, 63 A, 4Pole MCCB : 11 Nos. |
| 2163 | :Protection of the feeders as required.: All controls, Annunciations and indications for safe and trouble-Free operation of the D G Set.: The operational sequence shall be PLC controlled as per the scheme in the SLD. : 60 KVAR TP Capacitor Bank, Delta connected in (=10*4+5*2+3*2+2*2) KVAR units with 7% de-tuned reactor, 440V, 50Hz complete with digital APFC Relay and automatic switching arrangement, suitably sized protection MCCBs/MCBs, Contactors, Auto / Manual selector switches and indicators for selecting the operating mode - all factory wired. Capacitor bank shall be suitable for heavy duty, 480V, 50 Hz, 3 Ph, 4 Wire system. :Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2164 | SCHOOL BLOCK |
| 2165 | MAIN LT PANELL. T. PANEL SYSTEMS.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:All ACBs shall have:: Inbuilt TRIP LED indication.: Ics = Icu = Icw for 1 sec.for the breakers with built-in micro-processor based releases, : Adjustable over current with time Setting, short circuit with time Setting, earth fault with time Setting.: R,Y,B phase indication lamps (LED Type) with Control MCB / MPCB as per fault requirement.: Instantaneous short circuitAll MCCBs shall have:: Ics = Icu = 100% for the breakers.: MCCB\"s upto 250A shall be with thermal - magnetic releases and beyond 250A shall be with micro-processor based releases.: MCCB\"s shall be with extended rotary handle. |
| 2166 | S.I.T.C of Main LT Panel shall be Indoor, sheet steel metal clad, floor mounted, type conforming to (latest edition) of I S: 8623/IEC: 61439-1 (PTTA type)and IEC: 60947/I S: 13947, 1993for control gear & switch gear with an enclosure protection of IP 52 as per I S: 2147. The LT panel:- This PTTA type, shall be type tested as per the I S: 8623 standard for PTTA panel. :All the equipment shall be accessible from the front side of the panel in case of ‘Single front panel without adequate back excess. Protection relays, KWH & indicating meters, etc. shall be mounted on front door; when required. :Provided with anti-condensation space heaters, thermostat controlled & back-up protection (MCB) in Each bay; rated for 240Volts, single phase, 50Hz. AC. Power supply. The space heater shall be of 100W rating (Each). Cubicles shall be provided with LED lamps with control switches and suitable sockets.:The switch over of power between the Mains power and DG Power shall take place with suitably sized (EDO) ACBs / MCCBs or Contractor in the Main LT Panel following AMF & the electrical / mechanical inter-locking scheme in the SLD. In any which condition main power and DG power shall not be feeding main Bus. & also DG sync. / parallel operation shall not be planned. :The components in the Main LT Panel shall be as follows: |
| 2167 | INCOMER:(EDO) ACBs, MCCB & Contactor shall be as per SLD as follows with required controls::415 V, 50 Hz, 630 A, 4Pole (EDO) ACB : 1 No. (Trf. incomer):415 V, 50 Hz, 630 A, 4Pole (EDO) ACB : 2 No. (Bus Coupler-1,2):415 V, 50 Hz, 100 A, 4Pole MCCB : 1 No. (DG-1 incomer):415 V, 50 Hz, 100 A, 4Pole Contactor: 1 No. (DG-1 incomer):415 V, 50 Hz, 200 A, 4Pole MCCB : 1 No. (DG-2 incomer):415 V, 50 Hz, 200 A, 4Pole Contactor: 1 No. (DG-2 incomer)BUS BARS::630A TP + N Aluminium suitable for 1.1 K V with a fault level with-stand: 16 K A for 1 second in Three parts as per SLD. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.: OUTGOING ::415 V, 50 Hz, 250 A, 3Pole MCCB: 1 Nos.(Cap. Bank i/c):415 V, 50 Hz, 200 A, 4Pole MCCB : 3 Nos.:415 V, 50 Hz, 125 A, 4Pole MCCB : 5 Nos.:415 V, 50 Hz, 100 A, 4Pole MCCB : 3 Nos.:415 V, 50 Hz, 63 A, 4Pole MCCB : 1 Nos.:415 V, 50 Hz, 40 A, 4Pole MCCB : 1 Nos.:230 V, 50 Hz, 40 A, 2Pole MCCB : 0 Nos. |
| 2168 | :Protection of the feeders as required:: All controls, Annunciations and indications for safe and trouble-FRLSHee operation of the D G Set.: The operational sequence shall be PLC controlled as per the scheme in the SLD. : 120 KVAR TP Capacitor Bank, Delta connected in (=25*3+10*3+5*3) KVAR units with 7% de-tuned reactor, 440V, 50Hz complete with digital APFC Relay and automatic switching arrangement, suitably sized protection MCCBs/MCBs, Contactors, Auto / Manual selector switches and indicators for selecting the operating mode - all factory wired. Capacitor bank shall be suitable for heavy duty, 480V, 50 Hz, 3 Ph, 4 Wire system. :Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2169 | 3BHK FLATS BLOCK-1 |
| 2170 | MAIN LT PANELL. T. PANEL SYSTEMS.I.T.C of LT Panel. The Panel shall be self standing, made of Sheet steel (2 mm for doors & 1.6 mm other faces), surface treated with 7 tank process and painted with anticorrosion paint/powder coated. The enclosure shall be IP 52 protected as per I S: 2147. Make: Vidyut Control india Pvt. Ltd/ Innovic Energy LLP / Ambit Switchgear / Tricolite:The components in the AMF panel shall be as follows:All ACBs shall have:: Inbuilt TRIP LED indication.: Ics = Icu = Icw for 1 sec.for the breakers with built-in micro-processor based releases, : Adjustable over current with time Setting, short circuit with time Setting, earth fault with time Setting.: R,Y,B phase indication lamps (LED Type) with Control MCB / MPCB as per fault requirement.: Instantaneous short circuitAll MCCBs shall have:: Ics = Icu = 100% for the breakers.: MCCB\"s upto 250A shall be with thermal - magnetic releases and beyond 250A shall be with micro-processor based releases.: MCCB\"s shall be with extended rotary handle. |
| 2171 | S.I.T.C of Main LT Panel shall be Indoor, sheet steel metal clad, floor mounted, type conforming to (latest edition) of I S: 8623/IEC: 61439-1 (PTTA type)and IEC: 60947/I S: 13947, 1993for control gear & switch gear with an enclosure protection of IP 52 as per I S: 2147. The LT panel:- This PTTA type, shall be type tested as per the I S: 8623 standard for PTTA panel. :All the equipment shall be accessible from the front side of the panel in case of ‘Single front panel without adequate back excess. Protection relays, KWH & indicating meters, etc. shall be mounted on front door; when required. :Provided with anti-condensation space heaters, thermostat controlled & back-up protection (MCB) in Each bay; rated for 240Volts, single phase, 50Hz. AC. Power supply. The space heater shall be of 100W rating (Each). Cubicles shall be provided with LED lamps with control switches and suitable sockets.:The switch over of power between the Mains power and DG Power shall take place with suitably sized (EDO) ACBs / MCCBs or Contractor in the Main LT Panel following AMF & the electrical / mechanical inter-locking scheme in the SLD. In any which condition main power and DG power shall not be feeding main Bus. & also DG sync. / parallel operation shall not be planned. :The components in the Main LT Panel shall be as follows: |
| 2172 | INCOMER:(EDO) ACBs, MCCB & Contactor shall be as per SLD as follows with required controls::415 V, 50 Hz, 1000 A, 4Pole (EDO) ACB : 1 No. (Trf. incomer):415 V, 50 Hz, 1000 A, 4Pole (EDO) ACB : 2 No. (Bus Coupler-1,2):415 V, 50 Hz, 320 A, 4Pole MCCB : 1 No. (DG-1 incomer):415 V, 50 Hz, 320 A, 4Pole Contactor: 1 No. (DG-1 incomer):415 V, 50 Hz, 100 A, 4Pole MCCB : 1 No. (DG-2 incomer):415 V, 50 Hz, 100 A, 4Pole Contactor: 1 No. (DG-2 incomer)BUS BARS::1000A TP + N Aluminium suitable for 1.1 K V with a fault level with-stand: 16 K A for 1 second in Three parts as per SLD. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.: OUTGOING ::415 V, 50 Hz, 500 A, 3Pole MCCB: 1 Nos.(Cap. Bank i/c):415 V, 50 Hz, 250 A, 4Pole MCCB : 3 Nos.:415 V, 50 Hz, 160 A, 4Pole MCCB : 2 Nos.:415 V, 50 Hz, 125 A, 4Pole MCCB : 6 Nos.:415 V, 50 Hz, 100 A, 4Pole MCCB : 6 Nos. |
| 2173 | :Protection of the feeders as required:: All controls, Annunciations and indications for safe and trouble-FRLSHee operation of the D G Set.: The operational sequence shall be PLC controlled as per the scheme in the SLD. : 120 KVAR TP Capacitor Bank, Delta connected in (=25*3+10*3+5*3) KVAR units with 7% de-tuned reactor, 440V, 50Hz complete with digital APFC Relay and automatic switching arrangement, suitably sized protection MCCBs/MCBs, Contactors, Auto / Manual selector switches and indicators for selecting the operating mode - all factory wired. Capacitor bank shall be suitable for heavy duty, 480V, 50 Hz, 3 Ph, 4 Wire system. :Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2174 | STAFF HOSTEL |
| 2175 | S.I.T.C. Main Distribution Board (MDB) indoor, floor / wall-mounted type, conforming to I S : 13032 (Latest Edition) with key-lockable door; complete with the bus-bars components and accessoriesmounted and wire connections terminated in the board as per SLD & as follows: |
| 2176 | ? INCOMER::100A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::100A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63 A (10KA), 4Pole MCB: 06 Nos.:415 V, 50 Hz, 40A (10KA), 4Pole MCB : 02 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2177 | R.M OFFICE, DAITARIGF (L+P) + FF (L+P) + SF (L+P) |
| 2178 | MDB INVERTER? INCOMER::63A (10KA), 4P, 415 V, 50 Hz. MCB: 1 No.MCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? OUTGOINGS : :230V, 50 Hz, 25 A (10KA), 2Pole MCB : 11 Nos.complete the work in all respect as per direction of EIC. |
| 2179 | RM OFFICE |
| 2180 | MDB UPS:? INCOMER::63A (10KA), 4P, 415 V, 50 Hz. MCB: 2 Nos. (Parallel)MCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::125A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415V, 50 Hz, 40 A (10KA), 4Pole MCB: 9 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2181 | RM OFFICE |
| 2182 | MDB UPS:? INCOMER::63A (10KA), 4P, 415 V, 50 Hz. MCB: 1Nos. (Parallel)MCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::63A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415V, 50 Hz, 40 A (10KA), 4Pole MCB: 6 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2183 | SCHOOL BLOCK |
| 2184 | MDB HVAC? INCOMER::400A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::400A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63 A (10KA), 4Pole MCB: 10 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2185 | R.M OFFICE |
| 2186 | MDB HVAC? INCOMER::125A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::125A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63 A (10KA), 4Pole MCB: 08 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2187 | OFFICERS CLUB & HOSTEL MDB HVAC GF+FF O/D HVAC |
| 2188 | ? MDB INCOMER::63A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::63A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 50 A (10KA), 4Pole MCB: 05 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2189 | GUEST HOUSE, DAITARIGF (L+P) + FF (L+P) |
| 2190 | MDB? INCOMER::100A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::100A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63 A (10KA), 4Pole MCB: 07 Nos.:415 V, 50 Hz, 25A (10KA), 4Pole MCB : 01 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2191 | 3 BHK FLATS BLOCK-2, DAITARI |
| 2192 | MDB ? INCOMER::100A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::100A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 40A (10KA), 4Pole MCB: 09Nos.Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2193 | 3 BHK FLATS BLOCK1& 2, DAITARI |
| 2194 | MDB ? INCOMER::100A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::100A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63 A (10KA), 4Pole MCB: 04 Nos.:415 V, 50 Hz, 40A (10KA), 4Pole MCB : 03 Nos.:230 V, 50 Hz, 25 (10KA), 2ole MCB : 01 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2195 | 2 BHK BLOCK (DG) |
| 2196 | MDB ? INCOMER::125A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::125A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 40 (10KA), 4Pole MCB: 11 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2197 | 2 BHK BLOCK |
| 2198 | MDB? INCOMER::200A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::200A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 125A (10KA), 4Pole MCB: 02 Nos.:415 V, 50 Hz, 63A (10KA), 4Pole MCB : 07 Nos.:230 V, 50 Hz, 32 (10KA), 2ole MCB : 01 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2199 | OFFICERS HOSTEL & CLUB |
| 2200 | MDB ? INCOMER::160A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::160A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 100A (10KA), 4Pole MCB: 02 Nos.:415 V, 50 Hz, 63A (10KA), 4Pole MCB : 07 Nos.:230 V, 50 Hz, 40(10KA), 2ole MCB : 01 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2201 | TRAINING HOSTEL |
| 2202 | MDB ? INCOMER::250A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::250A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63A (10KA), 4Pole MCB: 09Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2203 | TRAINING HOSTEL |
| 2204 | MDB? INCOMER::100A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::100A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63A (10KA), 4Pole MCB : 07 Nos.:230 V, 50 Hz, 40(10KA), 2ole MCB : 01 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2205 | STAFF HOSTEL |
| 2206 | MDB ? INCOMER::125A (10KA), 4P, 415 V, 50 Hz. MCCB: 1 No.MCCB shall be with digital Voltmeter & Ammeter & LED phase indications as per SLD.? BUS BARS ::125A TP + N Copper suitable for 1.1 K V with a fault level with-stand: 10 K A for 1 second. The Earth Bus shall be of CU & run contnuously throughout the width of the panel.? OUTGOINGS : :415 V, 50 Hz, 63A (10KA), 4Pole MCB : 07 Nos.:Class B+C surge arrester with nominal discharge current(In as per IEC 61643-1) 30KA (for 8/20ms) & Impulse current 7KA(for 10/350ms) between phase to neutral. & 50KA (8/20ms) impulse current for neutral to earth. Maximum continuous operating voltage shall be 320V. Response time (ta) shall be less than 25ns for phase to neutral. Voltage protection level shall be less than 900V at 5KA (8/20ms) for phase to neutral & 1.2KV for neutral to earth. (OBO Bettermann make or equivalent).: 1 No.complete the work in all respect as per direction of EIC. |
| 2207 | STAFF HOSTEL |
| 2208 | SCHOOL BLOCK |
| 2209 | OFFICERS HOSTEL & CLUB |
| 2210 | DISTRIBUTION BOARD (DB)Supply and fixing of following way single pole and neutral, sheet steel, MCB distribution board consumer unit, 240 V on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, hinged front acrylic covr for the MCB knobs detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required ( But with out MCB / RCCB / Isolator)2 + 12 WAYcomplete the work in all respect as per direction of EIC. |
| 2211 | R.M OFFICE, DAITARI |
| 2212 | GUEST HOUSE |
| 2213 | SCHOOL BLOCK |
| 2214 | OFFICERS HOSTEL & CLUB |
| 2215 | DISTRIBUTION BOARD (DB)Supply and fixing of following way three pole and neutral, sheet steel, MCB distribution, 415 V on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, hinged front acrylic cover for the MCB knobs detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ Isolator)6 WAY (6+ 18) DOUBLE DOOR, HORIZONTAL TYPEcomplete the work in all respect as per direction of EIC. |
| 2216 | SCHOOL BLOCK |
| 2217 | 3BHK FLATS BLOCK |
| 2218 | 2BHK FLATS BLOCK |
| 2219 | TRAINING HOSTEL |
| 2220 | STAFF HOSTEL |
| 2221 | OFFICERS HOSTEL & CLUB |
| 2222 | DISTRIBUTION BOARD (DB)Supply and fixing of following way three pole and neutral, sheet steel, MCB distribution, 415 V on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, hinged front acrylic cover for the MCB knobs detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ Isolator)8 WAY (8 + 24) DOUBLE DOOR, HORIZONTAL TYPEcomplete the work in all respect as per direction of EIC. |
| 2223 | R.M OFFICE, DAITARI |
| 2224 | GUEST HOUSE |
| 2225 | DISTRIBUTION BOARD (DB)Supply and fixing of following way three pole and neutral, sheet steel, MCB distribution, 415 V on surface / recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, hinged front acrylic cover for the MCB knobs detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required ( But with out MCB/ RCCB/ Isolator)12 WAY (12 + 36) DOUBLE DOOR, HORIZONTAL TYPEcomplete the work in all respect as per direction of EIC. |
| 2226 | GUEST HOUSE |
| 2227 | SCHOOL BLOCK |
| 2228 | 3BHK BLOCK |
| 2229 | 2BHK FLATS BLOCK |
| 2230 | TRAINING HOSTEL |
| 2231 | STAFF HOSTEL |
| 2232 | OFFICERS HOSTEL & CLUB |
| 2233 | DISTRIBUTION BOARD (DB)Supply and fixing of 5 amp to 32 amp rating 240 V \"B\" series miniature circuit breaker suitable for lighting and other loads of the following poles in the existing MCB DB ISI marked complete with connections testing and commissioning etc. as required complete the work in all respect as per direction of EIC. SINGLE POLE |
| 2234 | R.M OFFICE, DAITARI |
| 2235 | GUEST HOUSE |
| 2236 | SCHOOL BLOCK |
| 2237 | 3BHK BLOCK |
| 2238 | 2BHK FLATS BLOCK |
| 2239 | TRAINING HOSTEL |
| 2240 | STAFF HOSTEL |
| 2241 | OFFICERS HOSTEL & CLUB |
| 2242 | DISTRIBUTION BOARD (DB)Supply and fixing of following rating double pole 240 V isolator in the existing MCB DB ISI marked complete with connection testing and commissioning etc. as required complete the work in all respect as per direction of EIC. 25-45 Amps |
| 2243 | R.M OFFICE, DAITARI |
| 2244 | GUEST HOUSE |
| 2245 | SCHOOL BLOCK |
| 2246 | 3BHK BLOCK |
| 2247 | 2BHK FLATS BLOCK |
| 2248 | TRAINING HOSTEL |
| 2249 | STAFF HOSTEL |
| 2250 | OFFICERS HOSTEL & CLUB |
| 2251 | DISTRIBUTION BOARD (DB)Supply and fixing of following rating four pole 415 V isolator in the existing MCB DB ISI marked complete with connection testing and commissioning etc. as required complete the work in all respect as per direction of EIC. 40 Amps |
| 2252 | R.M OFFICE, DAITARI |
| 2253 | SCHOOL BLOCK |
| 2254 | 3BHK BLOCK |
| 2255 | 2BHK FLATS BLOCK |
| 2256 | TRAINING HOSTEL |
| 2257 | STAFF HOSTEL |
| 2258 | OFFICERS HOSTEL & CLUB |
| 2259 | DISTRIBUTION BOARD (DB)Supply and fixing of following rating four pole 415 V isolator in the existing MCB DB ISI marked complete with connection testing and commissioning etc. as required complete the work in all respect as per direction of EIC. 63 Amps |
| 2260 | R.M OFFICE, DAITARI |
| 2261 | GUEST HOUSE |
| 2262 | SCHOOL BLOCK |
| 2263 | 3BHK BLOCK |
| 2264 | 2BHK FLATS BLOCK |
| 2265 | TRAINING HOSTEL |
| 2266 | STAFF HOSTEL |
| 2267 | OFFICERS HOSTEL & CLUB |
| 2268 | Supply and fixing of following rating double pole (single pole and neutral) 240 V residual current circuit breaker (RCCB) having a sensitivity current up to 300 milli ampere in the existing MCB DB ISI marked complete with connection testing and commissioning etc as required complete the work in all respect as per direction of EIC. 25 Amps |
| 2269 | GUEST HOUSE |
| 2270 | SCHOOL BLOCK |
| 2271 | 3BHK BLOCK |
| 2272 | 2BHK FLATS BLOCK |
| 2273 | TRAINING HOSTEL |
| 2274 | STAFF HOSTEL |
| 2275 | OFFICERS HOSTEL & CLUB |
| 2276 | UPS / INVERTER SYSTEM :S.I.T.C. natural / forced air-cooled, ON-LINE INVERTER / UPS suitableto operate in \"Hot Standby\" or \"Parallel\" or \"Stand-alone\" mode, work at 45° C temperature and relative humidity of 95% with IGBT technology complete with battery bank for approx 30 minutes back-up as under::In-put power supply : 415V (+10 % - 20%), 50Hz, ± 3%), 3 phase or as required at the time of detail engineering.:Output power supply: 415 V (± 1%) Three phase, 50Hz (± 0.5%) or as required at the time of detail engineering.:Sinusoidal waveform .:Overload capacity of 110% for 15 minutes. :Out-put regulation shall be +/- 1 % against input and load variation. :The UPS shall be natural /forced air-cooled as required, :The UPS shall be suitable to work at 45° C temperature and relative humidity of 95%.:Battery pre-exhaust alarm at-least two minutes before ‘DC Low’ tripping. :Protected against Out-put Over-load, D C input, Low/High In-put Voltage, |
| 2277 | UPS / INVERTER SYSTEM ::Battery Stand fabricated out of M. S. Angle and sheet steel to hold the above batteries in multi-tier formation. The batteries shall be kept on 20 mm. (min.) thick wooden planks / PVC Trays supported on the angle iron frame. The frame shall be painted with epoxy-coated paint (2coats over 1 coat of epoxy primer). The wooden planks shall be coated with acid-resistant paint.:Battery bank shall be suitable to supply the specified power for 30 minutes back up to the Unit. The batteries shall be “Sealed Maintenance Free Lead Acid” type of 12 V out-put to be connected as a D.C. bus systemfor the Unit.SITC of 5 KVA Inverter with Battery Stand and Battery Banks (3 phase in & 3 phase out) With 12v/18AH x 15 Nos. Batteries.complete the work in all respect as per direction of EIC. |
| 2278 | R.M OFFICE |
| 2279 | UPS / INVERTER SYSTEM ::Battery Stand fabricated out of M. S. Angle and sheet steel to hold the above batteries in multi-tier formation. The batteries shall be kept on 20 mm. (min.) thick wooden planks / PVC Trays supported on the angle iron frame. The frame shall be painted with epoxy-coated paint (2coats over 1 coat of epoxy primer). The wooden planks shall be coated with acid-resistant paint.:Battery bank shall be suitable to supply the specified power for 30 minutes back up to the Unit. The batteries shall be “Sealed Maintenance Free Lead Acid” type of 12 V out-put to be connected as a D.C. bus systemfor the Unit.SITC of 10 KVA UPS (PARALLEL) with Battery Stand and Battery Banks (3 phase in & 3 phase out) With 12v/26AH x 30 Nos. Batteries.complete the work in all respect as per direction of EIC. |
| 2280 | SCHOOL BLOCK |
| 2281 | UPS / INVERTER SYSTEM ::Battery Stand fabricated out of M. S. Angle and sheet steel to hold the above batteries in multi-tier formation. The batteries shall be kept on 20 mm. (min.) thick wooden planks / PVC Trays supported on the angle iron frame. The frame shall be painted with epoxy-coated paint (2coats over 1 coat of epoxy primer). The wooden planks shall be coated with acid-resistant paint.:Battery bank shall be suitable to supply the specified power for 30 minutes back up to the Unit. The batteries shall be “Sealed Maintenance Free Lead Acid” type of 12 V out-put to be connected as a D.C. bus systemfor the Unit.SITC of 20 KVA UPS (PARALLEL) with Battery Stand and Battery Banks (3 phase in & 3 phase out) With 12v/42AH x 30 Nos. Batteries. |
| 2282 | R.M OFFICE |
| 2283 | Supply and laying of 4 sq mm 2 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2284 | R.M OFFICE, DAITARI |
| 2285 | GUEST HOUSE |
| 2286 | SCHOOL BLOCK |
| 2287 | 3BHK BLOCK |
| 2288 | 2BHK FLATS BLOCK |
| 2289 | TRAINING HOSTEL |
| 2290 | STAFF HOSTEL |
| 2291 | OFFICERS HOSTEL & CLUB |
| 2292 | Supply and laying of 6 sq mm 2 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2293 | R.M OFFICE, DAITARI |
| 2294 | SCHOOL BLOCK |
| 2295 | Supply and laying of 4sq mm 4 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2296 | R.M OFFICE, DAITARI |
| 2297 | GUEST HOUSE |
| 2298 | SCHOOL BLOCK |
| 2299 | 3BHK BLOCK |
| 2300 | TRAINING HOSTEL |
| 2301 | Supply and laying of6sq mm 4core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2302 | R.M OFFICE, DAITARI |
| 2303 | GUEST HOUSE |
| 2304 | SCHOOL BLOCK |
| 2305 | STAFF HOSTEL |
| 2306 | OFFICERS HOSTEL & CLUB |
| 2307 | EXTERNAL LIGHTING |
| 2308 | Supply and laying of10sq mm 4core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2309 | R.M OFFICE, DAITARI |
| 2310 | GUEST HOUSE |
| 2311 | SCHOOL BLOCK |
| 2312 | 3BHK BLOCK |
| 2313 | 2BHK BLOCK |
| 2314 | TRAINING HOSTEL |
| 2315 | STAFF HOSTEL |
| 2316 | OFFICERS HOSTEL & CLUB |
| 2317 | EXTERNAL LIGHTING |
| 2318 | Supply and laying of 16sq mm4 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2319 | R.M OFFICE, DAITARI |
| 2320 | GUEST HOUSE |
| 2321 | SCHOOL BLOCK |
| 2322 | TRAINING HOSTEL |
| 2323 | STAFF HOSTEL |
| 2324 | OFFICERS HOSTEL & CLUB |
| 2325 | Supply and laying of 25 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2326 | R.M OFFICE, DAITARI |
| 2327 | GUEST HOUSE |
| 2328 | 3BHK BLOCK |
| 2329 | 2BHK FLATS BLOCK |
| 2330 | STAFF HOSTEL |
| 2331 | Supply and laying of 35 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2332 | SCHOOL BLOCK |
| 2333 | Supply and laying of 50 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2334 | R.M OFFICE, DAITARI |
| 2335 | SCHOOL BLOCK |
| 2336 | 3BHK BLOCK |
| 2337 | 2BHK FLATS BLOCK |
| 2338 | STAFF HOSTEL |
| 2339 | OFFICERS HOSTEL & CLUB |
| 2340 | Supply and laying of 70 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2341 | R.M OFFICE, DAITARI |
| 2342 | GUEST HOUSE |
| 2343 | SCHOOL BLOCK |
| 2344 | TRAINING HOSTEL |
| 2345 | Supply and laying of 95 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2346 | TRAININGHOSTEL |
| 2347 | Supply and laying of 120 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2348 | 3BHK BLOCK |
| 2349 | Supply and laying of 150 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2350 | R.M OFFICE, DAITARI |
| 2351 | TRAINING HOSTEL |
| 2352 | OFFICERS HOSTEL & CLUB |
| 2353 | Supply and laying of 240 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2354 | GUEST HOUSE |
| 2355 | STAFF HOSTEL |
| 2356 | Supply and laying of 300 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2357 | R.M OFFICE, DAITARI |
| 2358 | SCHOOL BLOCK |
| 2359 | 3 BHK BLOCK |
| 2360 | STAFF HOSTEL |
| 2361 | Supply and laying of 400 sq mm 3.5 core aluminium conductor PVC insulated armoured served sheathed cables 1100 Volts grade ISI marked at Surface, in Existing Pipes, Loose in Trench, Direct Buried in Ground in a depth of 750 mm below ground level over a cushion of 75 mm. thick sand all around and protected with burnt bricks on sides and on top. On surface the cable run shall be fixed on M.S. clamps etc. of suitable size or as directed by the Engineer-Incharge, complete in all respect. The armouring of the cable shall be properly connected with the earth conductor by clamps etc complete the work in all respect as per direction of EIC. |
| 2362 | R.M OFFICE, DAITARI |
| 2363 | Supplying and making end termination with brass compression gland and aluminum lugs for 2 x 6 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2364 | R.M OFFICE, DAITARI |
| 2365 | GUEST HOUSE |
| 2366 | SCHOOL BLOCK |
| 2367 | 3BHK BLOCK |
| 2368 | 2BHK FLATS BLOCK |
| 2369 | TRAINING HOSTEL |
| 2370 | STAFF HOSTEL |
| 2371 | OFFICERS HOSTEL & CLUB |
| 2372 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x25 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2373 | R.M OFFICE, DAITARI |
| 2374 | GUEST HOUSE |
| 2375 | 3BHK BLOCK |
| 2376 | 2BHK FLATS BLOCK |
| 2377 | STAFF HOSTEL |
| 2378 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x 35 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2379 | SCHOOL BLOCK |
| 2380 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x50 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2381 | R.M OFFICE, DAITARI |
| 2382 | SCHOOL BLOCK |
| 2383 | 3BHK FLATS BLOCK |
| 2384 | 2BHK FLATS BLOCK |
| 2385 | STAFF HOSTEL |
| 2386 | OFFICERS HOSTEL & CLUB |
| 2387 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x70 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2388 | R.M OFFICE, DAITARI |
| 2389 | GUEST HOUSE |
| 2390 | SCHOOL BLOCK |
| 2391 | TRAINING HOSTEL |
| 2392 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x95sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2393 | TRAINING HOSTEL |
| 2394 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x120 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2395 | 3BHK FLATS BLOCK |
| 2396 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x150 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2397 | R.M OFFICE, DAITARI |
| 2398 | OFFICERS HOSTEL & CLUB |
| 2399 | TRAINING HOSTEL |
| 2400 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x240sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2401 | STAFF HOSTEL |
| 2402 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x300sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2403 | R.M OFFICE, DAITARI |
| 2404 | SCHOOL BLOCK |
| 2405 | 3BHK FLATS BLOCK |
| 2406 | STAFF HOSTEL |
| 2407 | Supplying and making end termination with brass compression gland and aluminum lugs for 3.5 x400sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2408 | R.M OFFICE, DAITARI |
| 2409 | Supplying and making end termination with brass compression gland and aluminum lugs for 4 x 4/6/10 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2410 | R.M OFFICE, DAITARI |
| 2411 | GUEST HOUSE |
| 2412 | SCHOOL BLOCK |
| 2413 | 3BHK FLATS BLOCK |
| 2414 | 2BHK FLATS BLOCK |
| 2415 | TRAINING HOSTEL |
| 2416 | STAFF HOSTEL |
| 2417 | OFFICERS HOSTEL & CLUB |
| 2418 | EXTERNAL LIGHTING |
| 2419 | Supplying and making end termination with brass compression gland and aluminum lugs for 4 x 16 sq.mm size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required etc complete the work in all respect as per direction of EIC. |
| 2420 | R.M OFFICE, DAITARI |
| 2421 | GUEST HOUSE |
| 2422 | SCHOOL BLOCK |
| 2423 | TRAINING HOSTEL |
| 2424 | STAFF HOSTEL |
| 2425 | OFFICERS HOSTEL & CLUB |
| 2426 | CABLE TRAYS & RACEWAYSSupplying and installing ::300 mm width X 50 mm depth X 2.0 mm thickness thickness size of perforated pre-painted M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended From the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc as required etc complete the work in all respect as per direction of EIC. |
| 2427 | R.M OFFICE, DAITARI |
| 2428 | SCHOOL BLOCK |
| 2429 | 3BHK FLATS BLOCK |
| 2430 | 2BHK FLATS BLOCK |
| 2431 | TRAINING HOSTEL |
| 2432 | STAFF HOSTEL |
| 2433 | OFFICERS HOSTEL & CLUB |
| 2434 | CABLE TRAYS & RACEWAYSSupplying and installing ::450 mm width X 50 mm depth X 2.0 mm thickness thickness size of perforated pre-painted M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended From the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc as required etc complete the work in all respect as per direction of EIC. |
| 2435 | R.M OFFICE, DAITARI |
| 2436 | GUEST HOUSE |
| 2437 | SCHOOL BLOCK |
| 2438 | 3BHK FLATS BLOCK |
| 2439 | 2BHK FLATS BLOCK |
| 2440 | TRAINING HOSTEL |
| 2441 | STAFF HOSTEL |
| 2442 | OFFICERS HOSTEL & CLUB |
| 2443 | CABLE TRAYS & RACEWAYSSupplying and installing ::600mm width X 50 mm depth X 2.0 mm thickness thickness size of perforated pre-painted M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended From the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc as required etc complete the work in all respect as per direction of EIC. |
| 2444 | R.M OFFICE, DAITARI |
| 2445 | GUEST HOUSE |
| 2446 | SCHOOL BLOCK |
| 2447 | 3BHK FLATS BLOCK |
| 2448 | 2BHK FLATS BLOCK |
| 2449 | TRAINING HOSTEL |
| 2450 | STAFF HOSTEL |
| 2451 | OFFICERS HOSTEL & CLUB |
| 2452 | Supply and fixing of Raceway / Underfloor Trunking with 2mm Thick Lid and Base 1.6mm, Std Length 2.5M, with fixing raceways bracket on the floor, including cutting on the floor for laying complete in all recpects of150x38x1.6 (Two Compartments) sizes etc complete the work in all respect as per direction of EIC. |
| 2453 | RM OFFICE |
| 2454 | Supply and fixing of Raceway / Underfloor Trunking with 2mm Thick Lid and Base 1.6mm, Std Length 2.5M, with fixing raceways bracket on the floor, including cutting on the floor for laying complete in all recpects of300x38x1.6 (Three Compartments) sizes etc complete the work in all respect as per direction of EIC. |
| 2455 | RM OFFICE |
| 2456 | Supply and fixing of Access Outlet / Junction Box with Cover Plate suitable for item 8.3 a & b, 1 compartments of 2mm thick complete in all aspects of 150 x 150 x 50 - 75 mm Junction Box sizes etc complete the work in all respect as per direction of EIC. |
| 2457 | RM OFFICE |
| 2458 | Supply and fixing of Access Outlet / Junction Box with Cover Plate suitable for item 8.3 a & b, 1 compartments of 2mm thick complete in all aspects of300 x 300 x 50 - 75 mm Junction BoxJunction Box sizes etc complete the work in all respect as per direction of EIC. - |
| 2459 | RM OFFICE |
| 2460 | Supply and fixing of Access Outlet / Junction Box with Cover Plate suitable for item 8.3 a & b, 1 compartments of 2mm thick complete in all aspects of 150 x 150 x 50 - 75 mm 3 Comp Cross OverJunction Box sizes etc complete the work in all respect as per direction of EIC. |
| 2461 | RM OFFICE |
| 2462 | Supply and fixing of Access Outlet / Junction Box with Cover Plate suitable for item 8.3 a & b, 1 compartments of 2mm thick complete in all aspects of : 300 x 300 x 50 - 75 mm 3 Comp Cross Over etc complete the work in all respect as per direction of EIC. |
| 2463 | RM OFFICE |
| 2464 | Supplying and laying of 63 mm dia (OD-63 mm & ID-51 mm nominal) size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc complete the work in all respect as per direction of EIC. |
| 2465 | R.M OFFICE, DAITARI |
| 2466 | GUEST HOUSE |
| 2467 | SCHOOL BLOCK |
| 2468 | 3BHK FLATS BLOCK |
| 2469 | 2BHK FLATS BLOCK |
| 2470 | TRAINING HOSTEL |
| 2471 | STAFF HOSTEL |
| 2472 | OFFICERS HOSTEL & CLUB |
| 2473 | EXTERNAL LIGHTING |
| 2474 | Supplying and laying of 120 mm dia (OD-120 mm & ID-103 mm nominal)size DWC HDPE pipe ISI marked along with all accessories like socket, bend, couplers etc. conforming to IS 14930, Part II complete with fitting and cutting, jointing etc.direct in ground (75 cm below ground level) including excavation and refilling the trench but excluding sand cushioning and protective covering etc complete the work in all respect as per direction of EIC. |
| 2475 | R.M OFFICE, DAITARI |
| 2476 | GUEST HOUSE |
| 2477 | SCHOOL BLOCK |
| 2478 | 3BHK FLATS BLOCK |
| 2479 | 2BHK FLATS BLOCK |
| 2480 | TRAINING HOSTEL |
| 2481 | STAFF HOSTEL |
| 2482 | OFFICERS HOSTEL & CLUB |
| 2483 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired etc complete the work in all respect as per direction of EIC. |
| 2484 | R.M OFFICE, DAITARI |
| 2485 | GUEST HOUSE |
| 2486 | SCHOOL BLOCK |
| 2487 | 3BHK FLATS BLOCK |
| 2488 | 2BHK FLATS BLOCK |
| 2489 | TRAINING HOSTEL |
| 2490 | STAFF HOSTEL |
| 2491 | OFFICERS HOSTEL & CLUB |
| 2492 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC.Group-A (3Mtr) |
| 2493 | R.M OFFICE, DAITARI |
| 2494 | GUEST HOUSE |
| 2495 | SCHOOL BLOCK |
| 2496 | 3BHK FLATS BLOCK |
| 2497 | 2BHK FLATS BLOCK |
| 2498 | TRAINING HOSTEL |
| 2499 | STAFF HOSTEL |
| 2500 | OFFICERS HOSTEL & CLUB |
| 2501 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. GR-B ( 4 Mtr) |
| 2502 | R.M OFFICE, DAITARI |
| 2503 | GUEST HOUSE |
| 2504 | SCHOOL BLOCK |
| 2505 | 3BHK FLATS BLOCK |
| 2506 | 2BHK FLATS BLOCK |
| 2507 | TRAINING HOSTEL |
| 2508 | STAFF HOSTEL |
| 2509 | OFFICERS HOSTEL & CLUB |
| 2510 | Recessed wiring to submain in 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. GR-C( 5 Mtr) |
| 2511 | R.M OFFICE, DAITARI |
| 2512 | GUEST HOUSE |
| 2513 | SCHOOL BLOCK |
| 2514 | 3BHK FLATS BLOCK |
| 2515 | 2BHK FLATS BLOCK |
| 2516 | TRAINING HOSTEL |
| 2517 | STAFF HOSTEL |
| 2518 | OFFICERS HOSTEL & CLUB |
| 2519 | Recessed wiring to submain in 2 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2520 | R.M OFFICE, DAITARI |
| 2521 | GUEST HOUSE |
| 2522 | SCHOOL BLOCK |
| 2523 | 3BHK FLATS BLOCK |
| 2524 | 2BHK FLATS BLOCK |
| 2525 | TRAINING HOSTEL |
| 2526 | STAFF HOSTEL |
| 2527 | OFFICERS HOSTEL & CLUB |
| 2528 | Wiring for twin control light point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked in recess PVC conduit with 2 way modular type switch with ISI marked, phenolic laminated sheet suitable size ISI marked G.I. box(18 SWG) and earthing point with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor for loop earthing etc as required etc complete the work in all respect as per direction of EIC. |
| 2529 | R.M OFFICE, DAITARI |
| 2530 | GUEST HOUSE |
| 2531 | SCHOOL BLOCK |
| 2532 | 3BHK FLATS BLOCK |
| 2533 | 2BHK FLATS BLOCK |
| 2534 | TRAINING HOSTEL |
| 2535 | STAFF HOSTEL |
| 2536 | OFFICERS HOSTEL & CLUB |
| 2537 | Supply,Installation, Testing and Commissioning of Electronic type ceiling fan regulator, in existing switch box including connection with 1.5 sq.mm FR PVC insulated single core multistrand copper conductor, earthing the regulator as required etc complete the work in all respect as per direction of EIC. |
| 2538 | R.M OFFICE, DAITARI |
| 2539 | GUEST HOUSE |
| 2540 | SCHOOL BLOCK |
| 2541 | 3BHK FLATS BLOCK |
| 2542 | 2BHK FLATS BLOCK |
| 2543 | TRAINING HOSTEL |
| 2544 | STAFF HOSTEL |
| 2545 | OFFICERS HOSTEL & CLUB |
| 2546 | Installation, Testing and Commissioning of ceiling fan, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq.mm FR PVC insulated single core multiatrand copper conductor including providing and fixing phenolic laminated sheet steet cover on the fan box etc as required.etc. as required etc complete the work in all respect as per direction of EIC. |
| 2547 | R.M OFFICE, DAITARI |
| 2548 | GUEST HOUSE |
| 2549 | SCHOOL BLOCK |
| 2550 | 3BHK FLATS BLOCK |
| 2551 | 2BHK FLATS BLOCK |
| 2552 | TRAINING HOSTEL |
| 2553 | STAFF HOSTEL |
| 2554 | OFFICERS HOSTEL & CLUB |
| 2555 | Supply,Installation, testing and commissioning of exhaust fan up to 450 mm sweep in the opening, including making the hole to suit the size of the above fan, making good the damage complete, connection, etc as required etc complete the work in all respect as per direction of EIC. |
| 2556 | R.M OFFICE, DAITARI |
| 2557 | GUEST HOUSE |
| 2558 | SCHOOL BLOCK |
| 2559 | 3BHK FLATS BLOCK |
| 2560 | 2BHK FLATS BLOCK |
| 2561 | TRAINING HOSTEL |
| 2562 | STAFF HOSTEL |
| 2563 | OFFICERS HOSTEL & CLUB |
| 2564 | Recessed wiring to submain in 2 x 4 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2565 | R.M OFFICE, DAITARI |
| 2566 | GUEST HOUSE |
| 2567 | SCHOOL BLOCK |
| 2568 | 3BHK FLATS BLOCK |
| 2569 | 2BHK FLATS BLOCK |
| 2570 | TRAINING HOSTEL |
| 2571 | STAFF HOSTEL |
| 2572 | OFFICERS HOSTEL & CLUB |
| 2573 | Supplying and fixing of metal box of 150 mm x 75 mm x 60 mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 10 amps socket outlet and 10 ampsmodular type switch, connection, painting etc as required etc complete the work in all respect as per direction of EIC.(For light plugs to be used in non residential buildings) |
| 2574 | R.M OFFICE, DAITARI |
| 2575 | GUEST HOUSE |
| 2576 | SCHOOL BLOCK |
| 2577 | 3BHK FLATS BLOCK |
| 2578 | 2BHK FLATS BLOCK |
| 2579 | TRAINING HOSTEL |
| 2580 | STAFF HOSTEL |
| 2581 | OFFICERS HOSTEL & CLUB |
| 2582 | Supplying and fixing of metal box of 180 mm x 100 mm x 60 mm deep (nominal size) on surface or in recess with suitable size of phenolic laminated sheet cover in front including providing and fixing 3 pin 15 / 16 amps socket outlet and 15 / 16 ampsmodular type switch, connection, painting etc as required etc complete the work in all respect as per direction of EIC. (For light plugs to be used in non residential buildings) |
| 2583 | R.M OFFICE, DAITARI |
| 2584 | GUEST HOUSE |
| 2585 | SCHOOL BLOCK |
| 2586 | 3BHK FLATS BLOCK |
| 2587 | 2BHK FLATS BLOCK |
| 2588 | TRAINING HOSTEL |
| 2589 | STAFF HOSTEL |
| 2590 | OFFICERS HOSTEL & CLUB |
| 2591 | Supplying and fixing of TV antenna socket outlet etc complete the work in all respect as per direction of EIC. |
| 2592 | RM OFFICE |
| 2593 | GUEST HOUSE |
| 2594 | SCHOOL BLOCK |
| 2595 | 3BHK FLATS BLOCK |
| 2596 | 2BHK FLATS BLOCK |
| 2597 | TRAINING HOSTEL |
| 2598 | STAFF HOSTEL |
| 2599 | OFFICERS HOSTEL & CLUB |
| 2600 | SITC of CAT6A UTP RJ45 socket for Data/Lan.etc complete the work in all respect as per direction of EIC. |
| 2601 | R.M OFFICE, DAITARI |
| 2602 | GUEST HOUSE |
| 2603 | SCHOOL BLOCK |
| 2604 | TRAINING HOSTEL |
| 2605 | STAFF HOSTEL |
| 2606 | OFFICERS HOSTEL & CLUB |
| 2607 | Supplying and fixing of Telephone socket outlet etc complete the work in all respect as per direction of EIC. |
| 2608 | R.M OFFICE, DAITARI |
| 2609 | GUEST HOUSE |
| 2610 | SCHOOL BLOCK |
| 2611 | 3BHK FLATS BLOCK |
| 2612 | 2BHK FLATS BLOCK |
| 2613 | TRAINING HOSTEL |
| 2614 | STAFF HOSTEL |
| 2615 | OFFICERS HOSTEL & CLUB |
| 2616 | Supplying and fixing of following sizes of Metal Box & Cover Plate (1M & 2M) along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. : 75 mm x 75 mm x 60 mm deep |
| 2617 | R.M OFFICE, DAITARI |
| 2618 | GUEST HOUSE |
| 2619 | SCHOOL BLOCK |
| 2620 | 3BHK FLATS BLOCK |
| 2621 | 2BHK FLATS BLOCK |
| 2622 | TRAINING HOSTEL |
| 2623 | STAFF HOSTEL |
| 2624 | OFFICERS HOSTEL & CLUB |
| 2625 | Supplying and drawing of UTP 4 pair CAT 6 LAN Cable in the existing surface/ recessed Steel/ PVC conduit as required etc complete the work in all respect as per direction of EIC.(for Data and Telephone both) |
| 2626 | R.M OFFICE, DAITARI |
| 2627 | SCHOOL BLOCK |
| 2628 | TRAINING HOSTEL |
| 2629 | STAFF HOSTEL |
| 2630 | Supplying and drawing following pair, 0.5 sq.mm FR PVC insulated coper conductor, unarmoured telephone cable in existing surface / recessed steel / PVC conduit as required etc complete the work in all respect as per direction of EIC. : 2 Pair |
| 2631 | R.M OFFICE, DAITARI |
| 2632 | SCHOOL BLOCK |
| 2633 | TRAINING HOSTEL |
| 2634 | STAFF HOSTEL |
| 2635 | Recessed wiring to submain in 2 x 6 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2636 | R.M OFFICE, DAITARI |
| 2637 | GUEST HOUSE |
| 2638 | SCHOOL BLOCK |
| 2639 | 3BHK FLATS BLOCK |
| 2640 | 2BHK FLATS BLOCK |
| 2641 | TRAINING HOSTEL |
| 2642 | STAFF HOSTEL |
| 2643 | OFFICERS HOSTEL & CLUB |
| 2644 | Recessed wiring to submain in 2 x 10 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 1 x 4 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2645 | R.M OFFICE, DAITARI |
| 2646 | GUEST HOUSE |
| 2647 | SCHOOL BLOCK |
| 2648 | 3BHK FLATS BLOCK |
| 2649 | 2BHK FLATS BLOCK |
| 2650 | TRAINING HOSTEL |
| 2651 | STAFF HOSTEL |
| 2652 | OFFICERS HOSTEL & CLUB |
| 2653 | Recessed wiring to submain in 4 x 6 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 32 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2654 | R.M OFFICE, DAITARI |
| 2655 | GUEST HOUSE |
| 2656 | SCHOOL BLOCK |
| 2657 | 3BHK FLATS BLOCK |
| 2658 | 2BHK FLATS BLOCK |
| 2659 | TRAINING HOSTEL |
| 2660 | STAFF HOSTEL |
| 2661 | OFFICERS HOSTEL & CLUB |
| 2662 | Recessed wiring to submain in 4 x 10 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 32 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 2 x 4 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2663 | R.M OFFICE, DAITARI |
| 2664 | GUEST HOUSE |
| 2665 | SCHOOL BLOCK |
| 2666 | 3BHK FLATS BLOCK |
| 2667 | 2BHK FLATS BLOCK |
| 2668 | TRAINING HOSTEL |
| 2669 | STAFF HOSTEL |
| 2670 | OFFICERS HOSTEL & CLUB |
| 2671 | Recessed wiring to submain in 4 x 16 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 32 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 2 x 4 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required etc complete the work in all respect as per direction of EIC. |
| 2672 | R.M OFFICE, DAITARI |
| 2673 | GUEST HOUSE |
| 2674 | SCHOOL BLOCK |
| 2675 | 3BHK FLATS BLOCK |
| 2676 | 2BHK FLATS BLOCK |
| 2677 | TRAINING HOSTEL |
| 2678 | STAFF HOSTEL |
| 2679 | OFFICERS HOSTEL & CLUB |
| 2680 | Supply and drawing of 2 x 1.5 sq.mm sizes FR PVC insulated single core multistrand copper conductor in existing surface / recessed STEEL/PVC conduit as required etc complete the work in all respect as per direction of EIC. |
| 2681 | R.M OFFICE, DAITARI |
| 2682 | GUEST HOUSE |
| 2683 | SCHOOL BLOCK |
| 2684 | 3BHK FLATS BLOCK |
| 2685 | 2BHK FLATS BLOCK |
| 2686 | TRAINING HOSTEL |
| 2687 | STAFF HOSTEL |
| 2688 | OFFICERS HOSTEL & CLUB |
| 2689 | Supply and drawing of 2 x 2.5 sq.mm sizes FR PVC insulated single core multistrand copper conductor in existing surface / recessed STEEL/PVC conduit as required etc complete the work in all respect as per direction of EIC. |
| 2690 | R.M OFFICE, DAITARI |
| 2691 | GUEST HOUSE |
| 2692 | SCHOOL BLOCK |
| 2693 | 3BHK FLATS BLOCK |
| 2694 | 2BHK FLATS BLOCK |
| 2695 | TRAINING HOSTEL |
| 2696 | STAFF HOSTEL |
| 2697 | OFFICERS HOSTEL & CLUB |
| 2698 | EXTERNAL LIGHTING |
| 2699 | Supplying and fixing of 20MM sizes of PVC conduit of 1.6mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2700 | R.M OFFICE, DAITARI |
| 2701 | GUEST HOUSE |
| 2702 | SCHOOL BLOCK |
| 2703 | 3BHK FLATS BLOCK |
| 2704 | 2BHK FLATS BLOCK |
| 2705 | TRAINING HOSTEL |
| 2706 | STAFF HOSTEL |
| 2707 | OFFICERS HOSTEL & CLUB |
| 2708 | Supplying and fixing of 25MM sizes of PVC conduitof 1.6mm thickalong with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2709 | R.M OFFICE, DAITARI |
| 2710 | GUEST HOUSE |
| 2711 | SCHOOL BLOCK |
| 2712 | 3BHK FLATS BLOCK |
| 2713 | 2BHK FLATS BLOCK |
| 2714 | TRAINING HOSTEL |
| 2715 | STAFF HOSTEL |
| 2716 | OFFICERS HOSTEL & CLUB |
| 2717 | Supplying and fixing of 32MM sizes of PVC conduitof 1.6mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2718 | R.M OFFICE, DAITARI |
| 2719 | GUEST HOUSE |
| 2720 | SCHOOL BLOCK |
| 2721 | 3BHK FLATS BLOCK |
| 2722 | 2BHK FLATS BLOCK |
| 2723 | TRAINING HOSTEL |
| 2724 | STAFF HOSTEL |
| 2725 | OFFICERS HOSTEL & CLUB |
| 2726 | Supplying and fixing of 40MM sizes of PVC conduitof 2mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2727 | R.M OFFICE, DAITARI |
| 2728 | GUEST HOUSE |
| 2729 | SCHOOL BLOCK |
| 2730 | 3BHK FLATS BLOCK |
| 2731 | 2BHK FLATS BLOCK |
| 2732 | TRAINING HOSTEL |
| 2733 | STAFF HOSTEL |
| 2734 | OFFICERS HOSTEL & CLUB |
| 2735 | Supplying and fixing of 50MM sizes of PVC conduitof 2mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2736 | R.M OFFICE, DAITARI |
| 2737 | GUEST HOUSE |
| 2738 | SCHOOL BLOCK |
| 2739 | 3BHK FLATS BLOCK |
| 2740 | 2BHK FLATS BLOCK |
| 2741 | TRAINING HOSTEL |
| 2742 | STAFF HOSTEL |
| 2743 | OFFICERS HOSTEL & CLUB |
| 2744 | Supplying and fixing of 20MM sizes of Steel conduitof 1.6mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2745 | R.M OFFICE, DAITARI |
| 2746 | GUEST HOUSE |
| 2747 | SCHOOL BLOCK |
| 2748 | 3BHK FLATS BLOCK |
| 2749 | 2BHK FLATS BLOCK |
| 2750 | TRAINING HOSTEL |
| 2751 | STAFF HOSTEL |
| 2752 | OFFICERS HOSTEL & CLUB |
| 2753 | Supplying and fixing of 25MM sizes of Steel conduitof 1.6mm thick along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2754 | R.M OFFICE, DAITARI |
| 2755 | GUEST HOUSE |
| 2756 | SCHOOL BLOCK |
| 2757 | 3BHK FLATS BLOCK |
| 2758 | 2BHK FLATS BLOCK |
| 2759 | TRAINING HOSTEL |
| 2760 | STAFF HOSTEL |
| 2761 | OFFICERS HOSTEL & CLUB |
| 2762 | Supplying and fixing of 3 Module Skirting Light with Metal Box along with accessories in recessed wiring including Wiring & cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. |
| 2763 | GUEST HOUSE |
| 2764 | 3BHK FLATS BLOCK |
| 2765 | 2BHK FLATS BLOCK |
| 2766 | TRAINING HOSTEL |
| 2767 | STAFF HOSTEL |
| 2768 | OFFICERS HOSTEL & CLUB |
| 2769 | Supplying and fixing of Call Bell / Buzzer ISI marked suitable for DC /AC single phase 230 volts complete as required etc complete the work in all respect as per direction of EIC. |
| 2770 | RM OFFICE |
| 2771 | GUEST HOUSE |
| 2772 | SCHOOL BLOCK |
| 2773 | 3BHK FLATS BLOCK |
| 2774 | 2BHK FLATS BLOCK |
| 2775 | OFFICERS HOSTEL & CLUB |
| 2776 | Supply and installation of earthing system by providing masonary with cover plate having loccking arrangement and watering pipe etc (But wih outEarthing with G.I. earth plate 600 mm x 600mm x 6 mm thick ISI marked including accessories and charcoal and salt) as required etc complete the work in all respect as per direction of EIC. |
| 2777 | R.M OFFICE, DAITARI |
| 2778 | GUEST HOUSE |
| 2779 | SCHOOL BLOCK |
| 2780 | 3BHK FLATS BLOCK |
| 2781 | 2BHK FLATS BLOCK |
| 2782 | TRAINING HOSTEL |
| 2783 | STAFF HOSTEL |
| 2784 | OFFICERS HOSTEL & CLUB |
| 2785 | EXTERNAL LIGHTING |
| 2786 | Earthing with copper earth plate 600 mm x 600mm x 3.15 mm thick ISI marked including accessories and providing masonary with cover plate having loccking arrangement and watering pipe etc (But wihout charcoal and salt) as required etc complete the work in all respect as per direction of EIC. |
| 2787 | R.M OFFICE, DAITARI |
| 2788 | SCHOOL BLOCK |
| 2789 | Extra for using salt and charcoal for G.I or copper plate earth as required etc complete the work in all respect as per direction of EIC. |
| 2790 | R.M OFFICE, DAITARI |
| 2791 | GUEST HOUSE |
| 2792 | SCHOOL BLOCK |
| 2793 | 3BHK FLATS BLOCK |
| 2794 | 2BHK FLATS BLOCK |
| 2795 | TRAINING HOSTEL |
| 2796 | STAFF HOSTEL |
| 2797 | OFFICERS HOSTEL & CLUB |
| 2798 | EXTERNAL LIGHTING |
| 2799 | Supplying and laying 25 mm x 5mm G.I. strip on surface or in recess for connection etc as required etc complete the work in all respect as per direction of EIC. |
| 2800 | R.M OFFICE, DAITARI |
| 2801 | GUEST HOUSE |
| 2802 | SCHOOL BLOCK |
| 2803 | 3BHK FLATS BLOCK |
| 2804 | 2BHK FLATS BLOCK |
| 2805 | TRAINING HOSTEL |
| 2806 | STAFF HOSTEL |
| 2807 | OFFICERS HOSTEL & CLUB |
| 2808 | EXTERNAL LIGHTING |
| 2809 | Supplying and laying 25 mm x 5 mm copper strip on surface or in recess for connection etc complete the work in all respect as per direction of EIC. |
| 2810 | R.M OFFICE, DAITARI |
| 2811 | SCHOOL BLOCK |
| 2812 | Providing and fixing 6 SWG G.I. wire on surface or in recess for loop earthing along with existing surface / recessed conduit / submain wiring / cable as required etc complete the work in all respect as per direction of EIC. |
| 2813 | R.M OFFICE, DAITARI |
| 2814 | GUEST HOUSE |
| 2815 | SCHOOL BLOCK |
| 2816 | 3BHK FLATS BLOCK |
| 2817 | 2BHK FLATS BLOCK |
| 2818 | TRAINING HOSTEL |
| 2819 | STAFF HOSTEL |
| 2820 | OFFICERS HOSTEL & CLUB |
| 2821 | EXTERNAL LIGHTING |
| 2822 | Providing and fixing 8 SWG ( 4 mm) dia copper wire on surface or in recess for loop earthing along with existing surface / recessed conduit / submain wiring / cable as required etc complete the work in all respect as per direction of EIC. |
| 2823 | R.M OFFICE, DAITARI |
| 2824 | SCHOOL BLOCK |
| 2825 | EXTERNAL LIGHTING |
| 2826 | Providing and fixing of G.I. tape 20 mm x 3 mm thick on parapet or surface of wall for lightning conductor complete as required etc complete the work in all respect as per direction of EIC. (For horizontal run) |
| 2827 | R.M OFFICE, DAITARI |
| 2828 | GUEST HOUSE |
| 2829 | SCHOOL BLOCK |
| 2830 | 3BHK FLATS BLOCK |
| 2831 | 2BHK FLATS BLOCK |
| 2832 | TRAINING HOSTEL |
| 2833 | STAFF HOSTEL |
| 2834 | OFFICERS HOSTEL & CLUB |
| 2835 | Providing and fixing of G.I. tape 20 mm x 3 mm thick on parapet or surface of wall for lightning conductor complete as required etc complete the work in all respect as per direction of EIC.(For vertical run) |
| 2836 | R.M OFFICE, DAITARI |
| 2837 | GUEST HOUSE |
| 2838 | SCHOOL BLOCK |
| 2839 | 3BHK FLATS BLOCK |
| 2840 | 2BHK FLATS BLOCK |
| 2841 | TRAINING HOSTEL |
| 2842 | STAFF HOSTEL |
| 2843 | OFFICERS HOSTEL & CLUB |
| 2844 | Providing and fixing of testing joint, made of 20 mm x 3 mm thick G.I. strip, 125mm long with 4 nos of G.I. bolts, check nuts and spring washer etc complete as required etc complete the work in all respect as per direction of EIC. |
| 2845 | R.M OFFICE, DAITARI |
| 2846 | GUEST HOUSE |
| 2847 | SCHOOL BLOCK |
| 2848 | 3BHK FLATS BLOCK |
| 2849 | 2BHK FLATS BLOCK |
| 2850 | TRAINING HOSTEL |
| 2851 | STAFF HOSTEL |
| 2852 | OFFICERS HOSTEL & CLUB |
| 2853 | Providing and fixing of lightning conductor finial made of 25 mm dia 300 mm long, G.I. tube, having single prong at top, with 85 mm dia 6 mm thick G.I. base plate including holes etc. complete as required etc complete the work in all respect as per direction of EIC. |
| 2854 | R.M OFFICE, DAITARI |
| 2855 | GUEST HOUSE |
| 2856 | SCHOOL BLOCK |
| 2857 | 3BHK FLATS BLOCK |
| 2858 | 2BHK FLATS BLOCK |
| 2859 | TRAINING HOSTEL |
| 2860 | STAFF HOSTEL |
| 2861 | OFFICERS HOSTEL & CLUB |
| 2862 | Reveting, sweating and soldering of copper / G.I. tape ( with another copper / G.I. tape, base of the finial or any other metallic object) as required etc complete the work in all respect as per direction of EIC. |
| 2863 | R.M OFFICE, DAITARI |
| 2864 | GUEST HOUSE |
| 2865 | SCHOOL BLOCK |
| 2866 | 3BHK FLATS BLOCK |
| 2867 | 2BHK FLATS BLOCK |
| 2868 | TRAINING HOSTEL |
| 2869 | STAFF HOSTEL |
| 2870 | OFFICERS HOSTEL & CLUB |
| 2871 | SITC of on parapet & vertical on wall Conductor holder for holding strips/ conductor. The conductor holder should be installed at every 1.0 Mtr. The conductor holder shall be made with SS clamp mounted on plastic base support & shall be tested as per IEC 62561 etc complete the work in all respect as per direction of EIC. |
| 2872 | R.M OFFICE, DAITARI |
| 2873 | GUEST HOUSE |
| 2874 | SCHOOL BLOCK |
| 2875 | 3BHK FLATS BLOCK |
| 2876 | 2BHK FLATS BLOCK |
| 2877 | TRAINING HOSTEL |
| 2878 | STAFF HOSTEL |
| 2879 | OFFICERS HOSTEL & CLUB |
| 2880 | SITC of Exhaust fan complete with base plate as follows:250mm diameter etc complete the work in all respect as per direction of EIC. |
| 2881 | R.M OFFICE, DAITARI |
| 2882 | GUEST HOUSE |
| 2883 | SCHOOL BLOCK |
| 2884 | 3BHK FLATS BLOCK |
| 2885 | 2BHK FLATS BLOCK |
| 2886 | TRAINING HOSTEL |
| 2887 | STAFF HOSTEL |
| 2888 | OFFICERS HOSTEL & CLUB |
| 2889 | SITC of Ceiling fan complete with starting and p f improvement capacitors, suspension rod (extendable as required at site), Caps as follows ::1200 mm sweep etc complete the work in all respect as per direction of EIC. |
| 2890 | R.M OFFICE, DAITARI |
| 2891 | GUEST HOUSE |
| 2892 | SCHOOL BLOCK |
| 2893 | 3BHK FLATS BLOCK |
| 2894 | 2BHK FLATS BLOCK |
| 2895 | TRAINING HOSTEL |
| 2896 | STAFF HOSTEL |
| 2897 | OFFICERS HOSTEL & CLUB |
| 2898 | SITC of450 mm Wall Fan.complete with starting and p f improvement capacitors, suspension rod (extendable as required at site), etc complete the work in all respect as per direction of EIC. |
| 2899 | GUEST HOUSE |
| 2900 | SITC of Surface / Ceiling Mounted luminaire with LED (Light Emitting Diode) system power: approx. 12 W, Luminous flux of luminaire 1300 lm, Colour temperature of 4000 K, Neutral white, CRI > 80, 230 V constant current driver, 70% of luminous flux after 50,000 operating hours; Energy efficient LEDs, Direct light emission, Luminaire housing in Pressure die-cast aluminium, Polyester powder white coloured coat applied over a 5- stage pre-treatment, Opal diffuser for a homogenous light distribution, , Electronic control gear, Protection class I , IP 20,McAdam < 7, T.H.D = 10%, driver efficiency = 85%, surge protection of 3 kV, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2901 | R.M OFFICE, DAITARI |
| 2902 | GUEST HOUSE |
| 2903 | SCHOOL BLOCK |
| 2904 | 3BHK FLATS BLOCK |
| 2905 | 2BHK FLATS BLOCK |
| 2906 | TRAINING HOSTEL |
| 2907 | STAFF HOSTEL |
| 2908 | OFFICERS HOSTEL & CLUB |
| 2909 | SITC of Surface / Ceiling Mounted downlight luminaire with LED (Light Emitting Diode) system power: approx. 18W, Luminous flux of luminaire 1900 lm, Colour temperature of 4000 K, Neutral white, CRI > 80, 230 V constant current driver, 70% of luminous flux after 50,000 operating hours; Energy efficient LEDs, Direct light emission, Luminaire housing in Pressure die-cast aluminium, Powder Coated white coloured coat applied over a 5- stage pre-treatment, Opal diffuser for a homogenous light distribution, , Electronic control gear, Protection class I , IP 20, EMI EMC Compliance, Surge Protection 3KV,LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2910 | R.M OFFICE, DAITARI |
| 2911 | GUEST HOUSE |
| 2912 | SCHOOL BLOCK |
| 2913 | 3BHK FLATS BLOCK |
| 2914 | 2BHK FLATS BLOCK |
| 2915 | TRAINING HOSTEL |
| 2916 | STAFF HOSTEL |
| 2917 | OFFICERS HOSTEL & CLUB |
| 2918 | SITC of Recessed downlight luminaire with HPE (High Performance Efficiency) LED (Light Emitting Diode) system power: approx. 12 W, Luminous flux of luminaire 1700 lm, Colour temperature of 5700 K, Cool white, SDCM <7, CRI > 80, 230 V constant current driver, 70% of luminous flux after 50,000 operating hours; Energy efficient LEDs,Direct light emission, Luminaire housingin Pressure Die Cast aluminium, Powder Coated white coloured ,applied over a 5- stage pre-treatment, Opal diffuser for a homogenous light distribution, Electroniccontrol gear, Protection class I, IP 20 McAdam <7, T.H.D = 10%, driver efficiency = 88%, surge protection of 3 kV, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2919 | R.M OFFICE, DAITARI |
| 2920 | GUEST HOUSE |
| 2921 | SCHOOL BLOCK |
| 2922 | 3BHK FLATS BLOCK |
| 2923 | 2BHK FLATS BLOCK |
| 2924 | TRAINING HOSTEL |
| 2925 | STAFF HOSTEL |
| 2926 | OFFICERS HOSTEL & CLUB |
| 2927 | SITC of Recessed directional downlight with HPE (High-Performance Efficiency) with LED (Light Emitting Diode), system power: 18 W, Luminous flux of luminaire 2100 lm, Colour temperature of 4000 K, Neutral white, CRI > 80, 230V constant current driver, 70% of luminous flux after 50,000 operating hours; energy-efficient LEDs, direct light emission, housing in Pressure Die castaluminium, Powder Coated white coloured applied over a 5-stage pre-treatment trim, Opal diffuser for homogenous light distribution, electronic control gear, Protection class II, IP 20, McAdam 3, T.H.D = 10%, driver efficiency = 88%, EMI/EMC Compliance, surge protection of 3 kV, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2928 | R.M OFFICE, DAITARI |
| 2929 | GUEST HOUSE |
| 2930 | SCHOOL BLOCK |
| 2931 | 3BHK FLATS BLOCK |
| 2932 | 2BHK FLATS BLOCK |
| 2933 | TRAINING HOSTEL |
| 2934 | STAFF HOSTEL |
| 2935 | OFFICERS HOSTEL & CLUB |
| 2936 | SITC of 600x600 LED recessed luminaire withsystem power: 28W, colour temperature of 4000K, neutral white,230V constant current driver, 70% of luminous flux after 50,000operating hours, energy efficient LEDs, CRI>80, lumen efficacy of >110 lm/W Electronic Driver,direct light emission, CRCA body,white powder coat applied over a 5-stage pre-treatment,Protection class I, IP20, Mac Adam <7, T.H.D= 10%, driver efficiency = 88%, surge protection of 3 kV, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2937 | R.M OFFICE, DAITARI |
| 2938 | SCHOOL BLOCK |
| 2939 | SITC of Linear pendant luminaire with HPE (High Performance Efficiency) LED (Light Emitting Diode) system power: 36 W, Luminous flux of luminaire 3795 lm, Colour temperature of 4000 K, Neutral white, CRI > 80, 230 V constant currentdriver,70% of luminous flux after 50,000 operating hours, Energy efficient LEDs, Direct/ indirect light emission (37 % up, 63 % Dn), Luminaire profile in anodised aluminium, prismatic diffuser for a homogenous light distribution, Electronic control gear, Sliding fixing wire suspension, Protection class I, IP 20,MacAdam < 7, T.H.D = 10%, driver efficiency = 88%, surge protection of 3 kV, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2940 | R.M OFFICE, DAITARI |
| 2941 | GUEST HOUSE |
| 2942 | SCHOOL BLOCK |
| 2943 | SITC of Low-bay luminaire with LED (Light Emitting Diode), system power: 60W, luminous flux of luminaire approx. 8100 lm, colour temperature of 5700K, cool white, CRI >80, 230V constant current driver, 70% of luminous flux after 50,000 operating hours, energy efficient LEDs, direct light emission, with lens for 90° beam angle, housing in die-cast aluminium, Powder coated white applied over a 5-stage pre-treatment, electronic Potted control gear, P.F>0.95, T.H.D<10%, efficiency>88%, Surge Protection 4 KV, CISPR Compliance,Protection class I, IP54, LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 2944 | R.M OFFICE, DAITARI |
| 2945 | GUEST HOUSE |
| 2946 | SCHOOL BLOCK |
| 2947 | TRAINING HOSTEL |
| 2948 | STAFF HOSTEL |
| 2949 | OFFICERS HOSTEL & CLUB |
| 2950 | SITC of approx 20~22Watt Led Wall Mounted Light, 4ft, with diffuser, driver etc. all, 6k etc complete the work in all respect as per direction of EIC. |
| 2951 | R.M OFFICE, DAITARI |
| 2952 | GUEST HOUSE |
| 2953 | SCHOOL BLOCK |
| 2954 | 3BHK FLATS BLOCK |
| 2955 | 2BHK FLATS BLOCK |
| 2956 | TRAINING HOSTEL |
| 2957 | STAFF HOSTEL |
| 2958 | OFFICERS HOSTEL & CLUB |
| 2959 | SITC of approx 12Watt Led Wall Mounted Light, 2ft, with diffuser, driver etc. all, 6k etc complete the work in all respect as per direction of EIC. |
| 2960 | GUEST HOUSE |
| 2961 | 3BHK FLATS BLOCK |
| 2962 | 2BHK FLATS BLOCK |
| 2963 | TRAINING HOSTEL |
| 2964 | STAFF HOSTEL |
| 2965 | OFFICERS HOSTEL & CLUB |
| 2966 | SITC of Surface / Wall mounted emergency exit sign luminaire Window SAVE LED with LED(Light Emitting Diode), system power: 3W~6W, 230 V, direct light emission, 1 integral control gear, for central battery, housing in aluminum, polyester powder coated grey applied over a 5 stage pre-treatment. Protection class I, IP40, approx.- L = 246 mm, B = 45 mm, H = 195 mm.: : Exit Sign Double sided / single sided (Left / Right / up / down / staircase or as required as per actual), LED Based EXIT Signage voltage 180-270 V AC, IP -40, 2-3 hours battery back-up, as per std. norms. Including battery, mounting accessories etc complete the work in all respect as per direction of EIC. |
| 2967 | R.M OFFICE, DAITARI |
| 2968 | GUEST HOUSE |
| 2969 | SCHOOL BLOCK |
| 2970 | 3BHK FLATS BLOCK |
| 2971 | 2BHK FLATS BLOCK |
| 2972 | TRAINING HOSTEL |
| 2973 | STAFF HOSTEL |
| 2974 | OFFICERS HOSTEL & CLUB |
| 2975 | Supply and fixing of Foam type 5 Ltr. Fire Extinguisher, complete with wall bracket, along with supply of all materials and labour for proper completion of work etc complete the work in all respect as per direction of EIC. |
| 2976 | R.M OFFICE, DAITARI |
| 2977 | GUEST HOUSE |
| 2978 | SCHOOL BLOCK |
| 2979 | 3BHK FLATS BLOCK |
| 2980 | 2BHK FLATS BLOCK |
| 2981 | TRAINING HOSTEL |
| 2982 | STAFF HOSTEL |
| 2983 | OFFICERS HOSTEL & CLUB |
| 2984 | Supply and fixing of Co2 Type 4.5 kg. Fire Extinguisher, complete with wall bracket, along with supply of all materials and labour for proper completion of work etc complete the work in all respect as per direction of EIC. |
| 2985 | R.M OFFICE, DAITARI |
| 2986 | GUEST HOUSE |
| 2987 | SCHOOL BLOCK |
| 2988 | 3BHK FLATS BLOCK |
| 2989 | 2BHK FLATS BLOCK |
| 2990 | TRAINING HOSTEL |
| 2991 | STAFF HOSTEL |
| 2992 | OFFICERS HOSTEL & CLUB |
| 2993 | Supply and fixing of Dry Powder Type 5 kg. Fire Extinguisher, complete with wall bracket, along with supply of all materials and labour for proper completion of work etc complete the work in all respect as per direction of EIC. |
| 2994 | R.M OFFICE, DAITARI |
| 2995 | GUEST HOUSE |
| 2996 | SCHOOL BLOCK |
| 2997 | 3BHK FLATS BLOCK |
| 2998 | 2BHK FLATS BLOCK |
| 2999 | TRAINING HOSTEL |
| 3000 | STAFF HOSTEL |
| 3001 | OFFICERS HOSTEL & CLUB |
| 3002 | Supply and laying of 1M x 2M rubber mat of tested quality etc complete the work in all respect as per direction of EIC. |
| 3003 | R.M OFFICE, DAITARI |
| 3004 | GUEST HOUSE |
| 3005 | SCHOOL BLOCK |
| 3006 | 3BHK FLATS BLOCK |
| 3007 | 2BHK FLATS BLOCK |
| 3008 | TRAINING HOSTEL |
| 3009 | STAFF HOSTEL |
| 3010 | OFFICERS HOSTEL & CLUB |
| 3011 | Supply and fixing of Shock Treatment Chart(To be written in both English & Odiya) etc complete the work in all respect as per direction of EIC. |
| 3012 | R.M OFFICE, DAITARI |
| 3013 | GUEST HOUSE |
| 3014 | SCHOOL BLOCK |
| 3015 | 3BHK FLATS BLOCK |
| 3016 | 2BHK FLATS BLOCK |
| 3017 | TRAINING HOSTEL |
| 3018 | STAFF HOSTEL |
| 3019 | OFFICERS HOSTEL & CLUB |
| 3020 | Supply and fixing of 200 x 200mm M.V. Danger Notice Plate(To be written in both English & Odiya) etc complete the work in all respect as per direction of EIC. |
| 3021 | R.M OFFICE, DAITARI |
| 3022 | GUEST HOUSE |
| 3023 | SCHOOL BLOCK |
| 3024 | 3BHK FLATS BLOCK |
| 3025 | 2BHK FLATS BLOCK |
| 3026 | TRAINING HOSTEL |
| 3027 | STAFF HOSTEL |
| 3028 | OFFICERS HOSTEL & CLUB |
| 3029 | SITC of 40 Watt Led Street Lighting Fixture mounted on Coloumn / Wall luminaire high pressure die cast aluminium body with a flat toughened glass protector (IK07), with a Top Opening aluminium die cast control gear cover, top cover designed for tool free opening and closing,separate optical and control gear compartments (IP66), suitable for both horizontal and vertical mounting for 60mm dia pipe with an adjustable bracket (in step of 2.5 degree) from-20degree to +15degree, automatic electrical disconnection on opening of control gear compartment, a spirit level indicator with respect to the horizontal plane, a vent pressure equalization unit and pre-cabled, overall system efficiency of110lm/W at CCT 5700K, CRI > 70, L70 50000 hrs, Electrical Class 1, rated voltage 240Vac, THD<10%, Potted Driver, Top Opening, Power Factor > 0.95 with BIS certified potted driver having internal surge protection of 4/4 kV and an additional surge protection device of 10/10 kV.LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 3030 | R.M OFFICE, DAITARI |
| 3031 | GUEST HOUSE |
| 3032 | SITC of 60Watt Led Street Lighting Fixture mounted on Coloumn / Wall luminaire high pressure die cast aluminium body with a flat toughened glass protector (IK07), with a Top Opening aluminium die cast control gear cover, top cover designed for tool free opening and closing,separate optical and control gear compartments (IP66), suitable for both horizontal and vertical mounting for 60mm dia pipe with an adjustable bracket (in step of 2.5 degree) from-20degree to +15degree, automatic electrical disconnection on opening of control gear compartment, a spirit level indicator with respect to the horizontal plane, a vent pressure equalization unit and pre-cabled, overall system efficiency of110lm/W at CCT 5700K, CRI > 70, L70 50000 hrs, Electrical Class 1, rated voltage 240Vac, THD<10%, Potted Driver, Top Opening, Power Factor > 0.95 with BIS certified potted driver having internal surge protection of 4/4 kV and an additional surge protection device of 10/10 kV.LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 3033 | R.M OFFICE, DAITARI |
| 3034 | GUEST HOUSE |
| 3035 | SCHOOL BLOCK |
| 3036 | 3BHK FLATS BLOCK |
| 3037 | TRAINING HOSTEL |
| 3038 | EXTERNAL LIGHTING |
| 3039 | SITC of 120Watt Led Street Lighting Fixture mounted on Coloumn / Wall luminaire high pressure die cast aluminium body with a flat toughened glass protector (IK07), with a Top Opening aluminium die cast control gear cover, top cover designed for tool free opening and closing,separate optical and control gear compartments (IP66), suitable for both horizontal and vertical mounting for 60mm dia pipe with an adjustable bracket (in step of 2.5 degree) from-20degree to +15degree, automatic electrical disconnection on opening of control gear compartment, a spirit level indicator with respect to the horizontal plane, a vent pressure equalization unit and pre-cabled, overall system efficiency of110lm/W at CCT 5700K, CRI > 70, L70 50000 hrs, Electrical Class 1, rated voltage 240Vac, THD<10%, Potted Driver, Top Opening, Power Factor > 0.95 with BIS certified potted driver having internal surge protection of 4/4 kV and an additional surge protection device of 10/10 kV.LM 79 LM80, BIS R Number and reports to be submitted etc complete the work in all respect as per direction of EIC. |
| 3040 | EXTERNAL LIGHTING |
| 3041 | SITC of 6m GI conical tapered pole with 300mm long arm, no tilt as per following specs1) Design Standard EN402) Basic Wind Speed: 169 kmph & Topography is considered as flat.3) Materials.3.1) Pole shaft and base plate: A36/A572-50 or equivalent3.2) Base plate: 225x225x14mm4) Hot dip galvanised to ASTM A123, with minimum average GIcoating of 65µm.5) PU(Polyurethane) painted with avg. DFT of 70µm, using veryhigh quality paint & primer.6) Dia of bottom 136mm and top 76mm7) Standared Pole Foundation with bots and all required accessories etc complete the work in all respect as per direction of EIC. |
| 3042 | R.M OFFICE, DAITARI |
| 3043 | GUEST HOUSE |
| 3044 | SCHOOL BLOCK |
| 3045 | 3BHK FLATS BLOCK |
| 3046 | TRAINING HOSTEL |
| 3047 | EXTERNAL LIGHTING |
| 3048 | SITC of 8m GI conical tapered pole with 300mm long arm, no tilt as per following specs1) Design Standard EN402) Basic Wind Speed: 169 kmph & Topography is considered as flat.3) Materials.3.1) Pole shaft and base plate: A36/A572-50 or equivalent3.2) Base plate: 225x225x14mm4) Hot dip galvanised to ASTM A123, with minimum average GIcoating of 65µm.5) PU(Polyurethane) painted with avg. DFT of 70µm, using veryhigh quality paint & primer.6) Dia of bottom 136mm and top 76mm7) Standared Pole Foundation with bots and all required accessories etc complete the work in all respect as per direction of EIC. |
| 3049 | EXTERNAL LIGHTING |
| 3050 | Supply, installation, testing and commissioning of outdoor type feeder pillar (Double door type IP 65) of suitable size not less than 30 cm and up to 45 cm deep made out of 16 SWG thick steel sheet duly compartmentalised having 4 strip busbar of 100 amp capacity, double door with spring loaded allen key type locking arrangement for inner compartment and seperate coupboard type concealed locking arrangement for outer door. (Panel will have separate compartment for electric supply co.) duly rain and dust protected. The panel shall be fixed on M S angle iron frame work of size 50mmX50mmX6mm (NS) 90 cm long legs out of which 45 cm duly grouted in cement concrete 1:2:4 (1 cement, 2 sand and 4 stone aggrigate 20 cm) and having following accessories mounted inside the cubicle panel i/c connections, inter connections, earth studs, painting etc. as reqd. 415 V, 63 Amps, 4P, MCCB : 1 Nos.: 415 V, 63 Amps TP + N + E Al. Busbar (10 KA): 1 Set: Voltmeter 0-500 Volt 96 Sqmm flush type with selector switch : 1 Each: Ammeter, 96 Sqmm flush type with selector switch & 250/ 5 Amp CTs : 1 Set: Indicating lamps (RYB) with control MCB. : 1 Set: 25 Amp. 4 pole, 10 KA, 415V, 50 Hz MCB: 06 Nos. |
| 3051 | : Power contractor 4 pole, 25 Amp., 415V, 50 Hz. :06 Nos.: Contact multiplier : 6A, NO/NC as required : 2 No: Selector / Test switches as required in control circuitSurge arrestor : B/C type : Danger notice plate.Note: The contactors shall be controlled by a Time switch / Digital with adjustable time of switching \"ON\" and \"Off\" the lamps throughout the year; mounted inside the Feeder pillar.etc complete the work in all respect as per direction of EIC. |
| 3052 | EXTERNAL LIGHTING |
| 3053 | FIRE DETECTION WORKS |
| 3054 | Supplying, installation, testing & commissioning of intelligent analog addressable Multi Criteria / photothermal detector complete with mounting base etc complete the work in all respect as per direction of EIC. |
| 3055 | R.M OFFICE, DAITARI |
| 3056 | TRAINING HOSTEL |
| 3057 | Supplying, installation, testing & commissioning of intelligent addressable thermal detector with rate of rise cum fixed tempreature thermistor complete with base as required etc complete the work in all respect as per direction of EIC. |
| 3058 | R.M OFFICE, DAITARI |
| 3059 | TRAINING HOSTEL |
| 3060 | Supplying, installation, testing & commissioning of addressable manual call point complete as required etc complete the work in all respect as per direction of EIC. |
| 3061 | R.M OFFICE, DAITARI |
| 3062 | TRAINING HOSTEL |
| 3063 | Supplying, installation, testing & commissioning of addressable horn cum strobe complete as required etc complete the work in all respect as per direction of EIC. |
| 3064 | R.M OFFICE, DAITARI |
| 3065 | TRAINING HOSTEL |
| 3066 | Supplying, installation, testing & commissioning of addressable fire control module complete as required etc complete the work in all respect as per direction of EIC. |
| 3067 | R.M OFFICE, DAITARI |
| 3068 | TRAINING HOSTEL |
| 3069 | Supplying, installation, testing & commissioning of response indicator on surface/recessed MS Box having two LED, metallic cover complete with all connections etc as required etc complete the work in all respect as per direction of EIC. |
| 3070 | R.M OFFICE, DAITARI |
| 3071 | TRAINING HOSTEL |
| 3072 | Supplying, installation, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the following loop modules and capable of supporting not less than 240 devices (including detectors) and minimum 120 detectors per loop and loop length up to 2 km, network communication card, minimum 320 character graphics/ LCD display with touch screen or other keypad and minimum 4000 events history log in the non volatile memory (EPROM), power supply unit (230 ± 5% V, 50 hz), 48 hrs back-up with 24 volt sealed maintenance free batteries with automatic charger. The panel shall have facility to connect printer to printout log and facility to have seamless integration with analog/digital voice evacuation system (which is part of the schedule of work under SH: PA System) and shall be complete with all accessories . The panel shall be compatible for IBMS system with open protocol BACnet/ Modbus over IP complete as per specifications etc complete the work in all respect as per direction of EIC. : Two Loop Panel. |
| 3073 | R.M OFFICE, DAITARI |
| 3074 | TRAINING HOSTEL |
| 3075 | Supply and drawing of following sizes FR PVC insulated single core multistrand copper conductor in existing surface / recessed STEEL/PVC conduit as required etc complete the work in all respect as per direction of EIC. : 2 x 1.5 sq.mm |
| 3076 | R.M OFFICE, DAITARI |
| 3077 | TRAINING HOSTEL |
| 3078 | Supplying and fixing of following sizes of Steel conduit along with accessories in recessed wiring including cutting the wall and making good the same in case of recessed conduit as required etc complete the work in all respect as per direction of EIC. : 25mm |
| 3079 | R.M OFFICE, DAITARI |
| 3080 | TRAINING HOSTEL |
| 3081 | HVAC SYSTEM |
| 3082 | Supply, Installation, testing & commissioning of Variable Refrigerant Flow / volumemodulartypeair conditioning systemwith stepless modulation with energy efficient scroll compressor having more than 4 pole motor,complete with indoorand outdoor units,individual remotecontroller & centralized controller, interconnected refrigerant piping , full charge of refrigerant gas & oil, MS stand, control cabling etc. as per detail given in specifications & having followingitems:. Supply Installation, testing & commissioning of Modular type outdoorunits capable of varying the refrigerant temperature as per inside load condition (Refrigerant R-410 type) equipped with highly efficient scroll compressorswith invertertype compressor (s) , specialheat exchanger,lownoise condenserfan , auto checkfunction for connection error, auto address Setting with refrigerant cooled PCB system and capacity as mentioned below.etc complete the work in all respect as per direction of EIC. |
| 3083 | 48 HP(RM OFFICE-DAITARI) |
| 3084 | 44 HP(RM OFFICE-DAITARI) |
| 3085 | 20 HP (RM OFFICE-DAITARI) |
| 3086 | 18 HP (RM OFFICE-DAITARI) |
| 3087 | 8 HP (RM OFFICE-DAITARI) |
| 3088 | 46 HP (OFFICERS\" CLUB & HOSTEL) |
| 3089 | 10 HP (OFFICERS\" CLUB & HOSTEL) |
| 3090 | Indoor Unit Ductable TypeSupply, Installation, Testing & Commissioning of following minimum capacity and external static pressure VRF/VRV ceiling mounted ductable type indoor unit equipped with washable synthetic media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, corded remote control, outer cabinet, vibration isolators, drain pan, other necessary supports etc., suitable for operation on single phase AC supply 230 V + 10%, 50Hz, complete as required. The unit shall have automatic force shut down provision in case of fire on receiving signal from BMS system or fire panel of the building. The cooling capacity of indoor unit will be at air inlet conditions of 27 Degree C DB and 19 Degree C WB temperature. etc complete the work in all respect as per direction of EIC. |
| 3091 | Ceiling Suspended Ductable Unit:7.95 Tons(RM OFFICE-DAITARI) |
| 3092 | Ceiling Suspended Ductable Unit:7.95 Tons(OFFICERS\" CLUB & HOSTEL) |
| 3093 | Ceiling Suspended Ductable Unit:6.36 Tons(RM OFFICE-DAITARI) |
| 3094 | Ceiling Suspended Ductable Unit:6.36 Tons(OFFICERS\" CLUB & HOSTEL) |
| 3095 | Ceiling Suspended Ductable Unit:4.55 Tons(RM OFFICE-DAITARI) |
| 3096 | Ceiling Suspended Ductable Unit:4.55 Tons(OFFICERS\" CLUB & HOSTEL) |
| 3097 | Ceiling Suspended Ductable Unit:3.98 Tons(RM OFFICE-DAITARI) |
| 3098 | Ceiling Suspended Ductable Unit:2.56 Tons(RM OFFICE-DAITARI) |
| 3099 | Indoor Unit CasSette TypeSupply, installation, testing and commissioning of following minimum capacity 4-way flow VRV/VRF CasSette Type Indoor ceiling mounted unit equipped with synthetic washable media pre-filter, fan section with low noise fan/dynamically balanced blower, multi speed motor, coil section with DX Copper coil, electronic expansion valve, outer cabinet, drain pump, grill, necessary supports, vibration isolation, cordless remote control etc., suitable for operationon single phase 230V±10%,50 Hz AC supply,complete,as required.The unit shall have automatic force shut down provision in case of fire on receiving signal from BMS System or fire panel of the building.The cooling capacity of indoor unit will be at air inlet conditions of 27 Degree CDB and 19 Degree CWBtemperature. etc complete the work in all respect as per direction of EIC. |
| 3100 | Ceiling Suspended 4 Way CasSette Unit:3.98 Tons(RM OFFICE-DAITARI) |
| 3101 | Ceiling Suspended 4 Way CasSette Unit:3.18 Tons(RM OFFICE-DAITARI) |
| 3102 | Ceiling Suspended 4 Way CasSette Unit:3.18 Tons(OFFICERS\" CLUB & HOSTEL) |
| 3103 | Ceiling Suspended 4 Way CasSette Unit:1.59 Tons(RM OFFICE-DAITARI) |
| 3104 | Ceiling Suspended 4 Way CasSette Unit:1.28 Tons(RM OFFICE-DAITARI) |
| 3105 | Ceiling Suspended 4 Way CasSette Unit:1.02 Tons(RM OFFICE-DAITARI) |
| 3106 | Ductable Split UnitSupply, installation,testing & commissioning of ductable type split unit air-conditioners with evaporator with coil, fan and fan motor, aircooled condenser with hermatically sealed scroll compressor, condenser coil, propeller fans controls, mounting stand for ODU, control panel, corded remote, canvass connection as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3107 | 8.5 Tons GUEST HOUSE |
| 3108 | 8.5 Tons SCHOOL BLOCK |
| 3109 | 5.5 Tons SCHOOL BLOCK |
| 3110 | 3.0Tons GUEST HOUSE |
| 3111 | CasSette Type Split UnitSupply, Installation,testing and commissioning of casSette split unit airconditioners with evaporator with fan & motor, cooling coil, filter, decorative ceiling grill/panel condenser with hermatically sealed scroll / rotary compressor, condenser coil, propeller fan with motor, M.S. frame for mounting ODU, control panel corded remote control, filterscomplete as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3112 | 3.0Tons GUEST HOUSE |
| 3113 | 4 .0Tons SCHOOL BLOCK |
| 3114 | Wall Mounted Split UnitSupply, installation, testing & commissioning of 5 star rated wall mounted split unit airconditioners with evaporator with fan with motor, cooling coil, filter, all enclosed in decorative plastic casing, condenser with hermatically sealed inverter compressor, condenser coil, propeller fan with motor, cordless remote control, voltage stabilizer alongwith all accessories complete as required etc complete the work in all respect as per direction of EIC.(2.0 Tons). |
| 3115 | 2.0Tons RM OFFICE-DAITARI |
| 3116 | 2.0Tons GUEST HOUSE |
| 3117 | 2.0Tons SCHOOL BLOCK |
| 3118 | 1.5 TonsGUEST HOUSE |
| 3119 | 1.5Tons SCHOOL BLOCK |
| 3120 | Supply, Installation, Testing & Commissioning of following minimum capacity VRV/VRF high wall type indoor unit equipped with washable synthetic media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, coil section with DX copper coil, electronic expansion valve, outer cabinet, cord less remote control, drain pan, necessary accesssories etc., suitable for operation on 230 V + 10%, 50 Hz, single phase AC supply, complete as required. The unit shall have automatic force shut down provision in case of fire on receiving signal from BMS system or fire panel of the building. The cooling capacity of indoor unit will be at air inlet conditions of 27 Degree C DB and 19 Degree C WB temperature. Wall Mounted Unit:2.02 Tonsetc complete the work in all respect as per direction of EIC. |
| 3121 | (OFFICERS\" CLUB & HOSTEL) |
| 3122 | Supply Installation, testing & commissioningof Y-joints for various size of Refrigerant pipe including insulation of same thickness of refrigerant pipe dia. etc complete the work in all respect as per direction of EIC. (RM OFFICE-DAITARI) |
| 3123 | RM OFFICE-DAITARI |
| 3124 | OFFICERS CLUB & HOSTEL |
| 3125 | Centralized controllerSupply Installation, testing & commissioningofMainIntelligenttouch screen centralcontroller system suitable for web connectivityincluding all the accessoriessuitableto operate, monitor, on/off, temperature Setting of all the indoor units individually complete as required and as specified etc complete the work in all respect as per direction of EIC. |
| 3126 | RM OFFICE-DAITARI |
| 3127 | OFFICERS CLUB & HOSTEL |
| 3128 | Refrigerant Piping Supply & Fixing of Interconnecting copper refrigerant pipe work of following sizes insulated with(class O)25mm / 19 mmthickElastomeric Nitrile Rubber between indoor and outdoor units i/c refrigerant as per specifications. Pipes shall be fixed with suitable size of clamp / MS hanger / MS support /MS angle as per site requirement etc complete the work in all respect as per direction of EIC. |
| 3129 | 41.3 mm O.D. Pipe Size with insulation of 25 mm thick(RM OFFICE-DAITARI) |
| 3130 | 41.3 mm O.D. Pipe Size with insulation of 25 mm thick(OFFICERS CLUB & HOSTEL) |
| 3131 | 34.9 mm O.D. Pipe Size with insulation of 25 mm thick(RM OFFICE-DAITARI) |
| 3132 | 34.9 mm O.D. Pipe Size with insulation of 25 mm thick(OFFICERS CLUB & HOSTEL) |
| 3133 | 28.6 mm O.D. Pipe Size with insulation of 25 mm thick(RM OFFICE-DAITARI) |
| 3134 | 28.6 mm O.D. Pipe Size with insulation of 25 mm thick(OFFICERS CLUB & HOSTEL) |
| 3135 | 22.2 mm O.D. Pipe Size with insulation of 25 mm thick(RM OFFICE-DAITARI) |
| 3136 | 22.2 mm O.D. Pipe Size with insulation of 25 mm thick(OFFICERS CLUB & HOSTEL) |
| 3137 | 19.1 mm O.D. Pipe Size with insulation of 25 mm thick(RM OFFICE-DAITARI) |
| 3138 | 19.1 mm O.D. Pipe Size with insulation of 25 mm thick(OFFICERS CLUB & HOSTEL) |
| 3139 | 15.9 mm O.D. Pipe Size with insulation of 19 mm thick(RM OFFICE-DAITARI) |
| 3140 | 15.9 mm O.D. Pipe Size with insulation of 19 mm thick(OFFICERS CLUB & HOSTEL) |
| 3141 | 12.7 mm O.D. Pipe Size with insulation of 19 mm thick(RM OFFICE-DAITARI) |
| 3142 | 12.7 mm O.D. Pipe Size with insulation of 19 mm thick(OFFICERS CLUB & HOSTEL) |
| 3143 | 9.5 mm O.D. Pipe Size with insulation of 19 mm thick (RM OFFICE-DAITARI) |
| 3144 | 9.5 mm O.D. Pipe Size with insulation of 19 mm thick(OFFICERS CLUB & HOSTEL)) |
| 3145 | 6.4 mm O.D. Pipe Size with insulation of 19 mm thick (RM OFFICE-DAITARI) |
| 3146 | Refrigerant Piping (For Split)Supply & installation copper soft/hard refrigerant piping along (Circuit length) with control cabling and earthing should be insulated with 9 mm thick pipe section of nitrile rubber etc complete the work in all respect as per direction of EIC. |
| 3147 | 8.5 Tons Ductable Split Unit(SCHOOL) |
| 3148 | 8.5 Tons Ductable Split Unit(GUEST HOUSE) |
| 3149 | 5.5 Tons Ductable Split Unit(SCHOOL) |
| 3150 | 4.0 Tons Ductable Split Unit(SCHOOL) |
| 3151 | 3.0 Tons Ductable Split Unit(GUEST HOUSE) |
| 3152 | 3.0 Tons CasSette Split Unit(GUEST HOUSE) |
| 3153 | 2.0 Tons Wall Mounted Split Unit(SCHOOL) |
| 3154 | 2.0 Tons Wall Mounted Split Unit(GUEST HOUSE) |
| 3155 | 1.5 Tons Wall Mounted Split Unit(SCHOOL) |
| 3156 | 1.5 Tons Wall Mounted Split Unit(GUEST HOUSE) |
| 3157 | Drain Pipe(50 mm dia)Supply, installation, testing and commissioning of UPVC drain piping complete with fittings, U-trap, supports valves and insulate with 9 mm thick Nitrile rubber insulation complete as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3158 | R.M OFFICE, DAITARI |
| 3159 | GUEST HOUSE |
| 3160 | SCHOOL BLOCK |
| 3161 | OFFICERS HOSTEL & CLUB |
| 3162 | Drain Pipe(40 mm dia)Supply, installation, testing and commissioning of UPVC drain piping complete with fittings, U-trap, supports valves and insulate with 9 mm thick Nitrile rubber insulation complete as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3163 | R.M OFFICE, DAITARI |
| 3164 | GUEST HOUSE |
| 3165 | SCHOOL BLOCK |
| 3166 | 2BHK FLATS BLOCK |
| 3167 | Drain Pipe(32 mm dia)Supply, installation, testing and commissioning of UPVC drain piping complete with fittings, U-trap, supports valves and insulate with 9 mm thick Nitrile rubber insulation complete as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3168 | R.M OFFICE, DAITARI |
| 3169 | GUEST HOUSE |
| 3170 | SCHOOL BLOCK |
| 3171 | 3BHK FLATS BLOCK |
| 3172 | TRAINING HOSTEL |
| 3173 | STAFF HOSTEL |
| 3174 | OFFICERS HOSTEL & CLUB |
| 3175 | Drain Pipe(25 mm dia)Supply, installation, testing and commissioning of UPVC drain piping complete with fittings, U-trap, supports valves and insulate with 9 mm thick Nitrile rubber insulation complete as per standards, requirement and drawings etc complete the work in all respect as per direction of EIC. |
| 3176 | R.M OFFICE, DAITARI |
| 3177 | GUEST HOUSE |
| 3178 | SCHOOL BLOCK |
| 3179 | 3BHK FLATS BLOCK |
| 3180 | 2BHK FLATS BLOCK |
| 3181 | TRAINING HOSTEL |
| 3182 | STAFF HOSTEL |
| 3183 | OFFICERS HOSTEL & CLUB |
| 3184 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. .Air Quantity : 1450 CFM, Static Pressure : 15 mm wg |
| 3185 | OFFICERS HOSTEL & CLUB |
| 3186 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC.Air Quantity : 950 CFM, Static Pressure : 15 mm wg |
| 3187 | R.M OFFICE, DAITARI |
| 3188 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC.Air Quantity :750 CFM, Static Pressure : 15 mm wg |
| 3189 | GUEST HOUSE |
| 3190 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :700 CFM, Static Pressure : 15 mm wg |
| 3191 | (R.M OFFICE, DAITARI) |
| 3192 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :550 CFM, Static Pressure : 15 mm wg |
| 3193 | (OFFICERS CLUB & HOSTEL) |
| 3194 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :500 CFM, Static Pressure : 15 mm wg |
| 3195 | STAFF HOSTEL |
| 3196 | TRAINING HOSTEL |
| 3197 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :450 CFM, Static Pressure : 15 mm wg |
| 3198 | (RM OFFICE) |
| 3199 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC.Air Quantity :400 CFM, Static Pressure : 15 mm wg |
| 3200 | (SCHOOL ) |
| 3201 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :300 CFM, Static Pressure : 10 mm wg |
| 3202 | (RM OFFICE) |
| 3203 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC. Air Quantity :250 CFM, Static Pressure : 10 mm wg |
| 3204 | (SCHOOL) |
| 3205 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC.Air Quantity :200 CFM, Static Pressure : 10 mm wg |
| 3206 | R.M OFFICE, DAITARI |
| 3207 | GUEST HOUSE |
| 3208 | Inline Fan Circular / Rectangular typeSupply, installation, testing and commissioning of circular/rectangular INLINE FANS suitable for installing in any position in vertical or horizontal ducts. The casing shall be double skin, internally acoustically lined and constructed of galvanised steel. The fan shall be DIDW/SISW with forward / backward curve impeller fitted with maintenance free external rotor motor. The motor shall be suitable for 220±10% / 415±10% volt single/three phase 50 cycles AC supply. Quoted price shall be inclusive of starter panel with cabling between starter panel and fan, complete as per standards and requirement etc complete the work in all respect as per direction of EIC.Air Quantity :150 CFM, Static Pressure : 10 mm w(gR.M OFFICE, DAITARI) |
| 3209 | R.M OFFICE, DAITARI |
| 3210 | Propeller FanSupply, installation, testing and commissioning of propeller fans for exhaust air as shown on drawings. Each fan shall be complete with permanenet split capacitor, mounting plate and accessories like wire guard, bird screen for weather protection as required, complete MCB panel and cabling, earthing as per specifications and drawings etc complete the work in all respect as per direction of EIC.(200 mm dia) |
| 3211 | R.M OFFICE, DAITARI |
| 3212 | GUEST HOUSE |
| 3213 | SCHOOL BLOCK |
| 3214 | 3BHK FLATS BLOCK |
| 3215 | 2BHK FLATS BLOCK |
| 3216 | TRAINING HOSTEL |
| 3217 | STAFF HOSTEL |
| 3218 | OFFICERS HOSTEL & CLUB |
| 3219 | Control & Transmission WiringSupplying & fixing control cum transmission wiring of copper in Heavy Duty conduits PVC conduits between indoorand out door unit.(2 core x 1.5 Sqmm) etc complete the work in all respect as per direction of EIC. |
| 3220 | R.M OFFICE, DAITARI |
| 3221 | OFFICERS HOSTEL & CLUB |
| 3222 | DuctingSupply, installation, balancing and commissioning of factory fabricatedGSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required etc complete the work in all respect as per direction of EIC. G.I. Sheet Metal Ducting (Rectangular) Thickness 0.63 mm sheet (750 mm & below) |
| 3223 | R.M OFFICE, DAITARI |
| 3224 | GUEST HOUSE |
| 3225 | SCHOOL BLOCK |
| 3226 | TRAINING HOSTEL |
| 3227 | STAFF HOSTEL |
| 3228 | OFFICERS HOSTEL & CLUB |
| 3229 | DuctingSupply, installation, balancing and commissioning of factory fabricatedGSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required etc complete the work in all respect as per direction of EIC.G.I. Sheet Metal Ducting (Rectangular) Thickness 0.80 mm sheet (751 mm - 1500 mm) |
| 3230 | R.M OFFICE, DAITARI |
| 3231 | GUEST HOUSE |
| 3232 | SCHOOL BLOCK |
| 3233 | OFFICERS HOSTEL & CLUB |
| 3234 | DuctingSupply, installation, balancing and commissioning of factory fabricatedGSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required etc complete the work in all respect as per direction of EIC. G.I. Sheet Metal Ducting (Rectangular) Thickness 1.00 mm sheet(1501 mm - 2250 mm) |
| 3235 | R.M OFFICE, DAITARI |
| 3236 | DuctingSupply, installation, balancing and commissioning of factory fabricatedGSS sheet metal rectangular ducting complete with neoprene rubber gaskets, elbows, splitter dampers, vanes, hangers, supports etc. as per approved drawings and specifications of following sheet thickness complete as required etc complete the work in all respect as per direction of EIC.G.I. Sheet Metal Ducting (Rectangular) Thickness 1.25 mm sheet (2251 mm & above) |
| 3237 | R.M OFFICE, DAITARI |
| 3238 | InsulationSupplying and fixing of 19 mm thick thickness duly laminated aluminum foilof mat finish closed cell Nitrile rubber (class \"O\") insulation on duct after applying suitable adhesive for nitrile rubber . The joints shall sealed with 50 mm wide and 3 mm thick self adhesive nitrile rubber tape insulation complete as per specifications and as required etc complete the work in all respect as per direction of EIC. |
| 3239 | R.M OFFICE, DAITARI |
| 3240 | GUEST HOUSE |
| 3241 | SCHOOL BLOCK |
| 3242 | OFFICERS HOSTEL & CLUB |
| 3243 | Duct Acoustic LiningSupply and fixing of accoustic lining of supply air duct and plenum with 25 mm thick resin bonded glass wool having density of 32 kg/m3, with 25 mm x 25 mm GI section of 1.25 mm thick, at 600 mm centre to centre covered with Reinforced Plastic tissue paper and 0.5 mm thick perforated aluminium sheet fixed to inside surface of ducts with cadmium plated nuts, bolts, stick pins, CPRX compound etc. complete as required and as per specifications.(25 mm thick, 32 kg/m3 density) |
| 3244 | R.M OFFICE, DAITARI |
| 3245 | GUEST HOUSE |
| 3246 | SCHOOL BLOCK |
| 3247 | OFFICERS HOSTEL & CLUB |
| 3248 | Grilles/Diffusers Supply, installation, testing and commissioning of Aluminium extruted powder coated supplyand returnairgrilles/ diffusers as per specifications and drawings (Approval of colour shall be taken from Architects/Consultants).(powder coated extruded aluminium Supply Air Grills with aluminium volume control dampers as per specifications etc complete the work in all respect as per direction of EIC. |
| 3249 | R.M OFFICE, DAITARI |
| 3250 | GUEST HOUSE |
| 3251 | SCHOOL BLOCK |
| 3252 | OFFICERS HOSTEL & CLUB |
| 3253 | Grilles/Diffusers Supply, installation, testing and commissioning of Aluminium extruted powder coated supplyand returnairgrilles/ diffusers as per specifications and drawings (Approval of colour shall be taken from Architects/Consultants).( powder coated extruded aluminium Return Air Grills with louvers butwithout volume control dampers complete as required etc complete the work in all respect as per direction of EIC. |
| 3254 | R.M OFFICE, DAITARI |
| 3255 | GUEST HOUSE |
| 3256 | SCHOOL BLOCK |
| 3257 | TRAINING HOSTEL |
| 3258 | OFFICERS HOSTEL & CLUB |
| 3259 | Grilles/Diffusers Supply, installation, testing and commissioning of Aluminium extruted powder coated supplyand returnairgrilles/ diffusers as per specifications and drawings (Approval of colour shall be taken from Architects/Consultants).etc complete the work in all respect as per direction of EIC. (supply air diffusers of powder coated aluminium with aluminium volume control dampers with anti smudge ring & removable core.) |
| 3260 | R.M OFFICE, DAITARI |
| 3261 | OFFICERS HOSTEL & CLUB |
| 3262 | Grilles/Diffusers Supply, installation, testing and commissioning of Aluminium extruted powder coated supplyand returnairgrilles/ diffusers as per specifications and drawings (Approval of colour shall be taken from Architects/Consultants).etc complete the work in all respect as per direction of EIC. (return air diffusers of powder coated aluminium without aluminium volume control dampers with anti smudge ring & removable core.) |
| 3263 | R.M OFFICE, DAITARI |
| 3264 | GUEST HOUSE |
| 3265 | SCHOOL BLOCK |
| 3266 | Supply, installation, testing and commissioning ofpowder coated extruded aluminium supply air jet diffusers of 400mm sizes with removable core and volume control dampers and complete as per specifications etc complete the work in all respect as per direction of EIC. |
| 3267 | SCHOOL BLCOK |
| 3268 | LouversSupply and fixing of Fresh / Exhaust air Aluminium extruded with bird screen, damper adjustable louvers as per specifications and drawings etc complete the work in all respect as per direction of EIC. |
| 3269 | R.M OFFICE, DAITARI |
| 3270 | GUEST HOUSE |
| 3271 | OFFICERS HOSTEL & CLUB |
| 3272 | SCHOOL BLCOK |
| 3273 | TRAINING HOSTEL |
| 3274 | STAFF HOSTEL |
| 3275 | Volume Control DamperSupply, installation,testing & commissioning of GI volume control duct damper complete with neoprene rubber gaskets, nuts, bolts, screws linkages, flanges etc, as per specifications etc complete the work in all respect as per direction of EIC. |
| 3276 | R.M OFFICE, DAITARI |
| 3277 | GUEST HOUSE |
| 3278 | ELCBSITC of Weather proof enclosure made out of Glass Fibre Reinforced Polyester (GRP) with IP 55 protection with FP ELCB of following rating near the outdoor units etc complete the work in all respect as per direction of EIC. |
| 3279 | 48 HP (R.M OFFICE, DAITARI) |
| 3280 | 46 HP (OFFICERS CLUB) |
| 3281 | 44 HP(R.M OFFICE, DAITARI) |
| 3282 | 20 HP(R.M OFFICE, DAITARI) |
| 3283 | 18 HP(R.M OFFICE, DAITARI) |
| 3284 | 10 HP (OFFICERS CLUB) |
| 3285 | 8 HP(R.M OFFICE, DAITARI) |
| 3286 | Sub Panel - 1 For Outdoor Unit Supply, installation,testing & commissioning of sub panel board cubical compartmentalised, weather proof Floor/ Wall mounted made of 2.0 mm thick steel sheet duly painted complete with voltmeter, ammeter, indicating lights for selector switch, incoming/outgoing feeders,NO/NC contactors, CTS contactors complete as per specifications and requirement etc complete the work in all respect as per direction of EIC. 1 No. 250 Amps TPN incoming MCCB 1 Set 400 Amps TPN Aluminium conductor bus bar duly sleeved.5 Nos. 40A. 415 volts 4P, RCBO - (300 mAsensitivity) (1 No.Spare).3 Nos. 32A. 415 volts 4P, RCBO - (300 mAsensitivity) (1 No.Spare). |
| 3287 | (R.M OFFICE, DAITARI) |
| 3288 | Supply, installation,testing & commissioning of sub panel board cubical compartmentalised, weather proof Floor/ Wall mounted made of 2.0 mm thick steel sheet duly painted complete with voltmeter, ammeter, indicating lights for selector switch, incoming/outgoing feeders,NO/NC contactors, CTS contactors complete as per specifications and requirement etc complete the work in all respect as per direction of EIC. 1 No. 250 Amps TPN incoming MCCB 1 Set 400 Amps TPN Aluminium conductor bus bar duly sleeved.4 Nos. 63A. 415 volts 4P, RCBO - (300 mAsensitivity) (1 No.Spare).2 Nos. 42A. 415 volts 4P, RCBO - (300 mAsensitivity) (1 No.Spare). |
| 3289 | OFFICERS CLUB & HOSTEL |
| 3290 | Power CablingSupplying, laying & fixing of XLPE insulated armouredCopper cables for various equipments as per specifications and drawings etc complete the work in all respect as per direction of EIC. |
| 3291 | 4C - 16 Sqmm (Copper) (RM OFFICE) |
| 3292 | 4C - 16 Sqmm (Copper) (OFFCIERS CLUB) |
| 3293 | 4C - 10 Sqmm (Copper) (RM OFFICE) |
| 3294 | 4C - 10 Sqmm (Copper) (OFFCIERS CLUB) |
| 3295 | 4C - 4 Sqmm (Aluminium)(RM OFFICE) |
| 3296 | 3C - 2.5 Sqmm (Aluminium)(RM OFFICE) |
| 3297 | Cable TraySupplying and installation of following size of perforated painted with powder coating M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with M.S. suspenders including bolts & nuts, painting suspenders etc. as required etc complete the work in all respect as per direction of EIC. |
| 3298 | 450 mm width X 50 mm depth X 2.0 mm thickness(RM OFFICE) |
| 3299 | 300 mm width X 50 mm depth X 2.. mm thickness(RM OFFICE) |
| 3300 | 300 mm width X 50 mm depth X 2.0 mm thickness(OFFCIERS CLUB) |
| 3301 | 150 mm width X 50 mm depth X 2.0 mm thicknessRM OFFICE) |
| 3302 | 150 mm width X 50 mm depth X 2.0 mm thickness(OFFCIERS CLUB) |
| 3303 | EarthingSupply and laying of double earthing by25 mm X 5 mm G.I. strip on surface or in recessfor continuity ofconductors between panel boards and equipments as drawings etc complete the work in all respect as per direction of EIC. |
| 3304 | RM OFFICE |
| 3305 | OFFICERS CLUB & HOSTEL |
| 3306 | EarthingSupply and laying of double earthing byproviding and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required etc complete the work in all respect as per direction of EIC. |
| 3307 | RM OFFICE |
| 3308 | OFFICERS CLUB & HOSTEL |
| 3309 | Refrigerant Piping (For Split)Supply & installation copper soft/hard refrigerant piping along (Circuit length) with control cabling and earthing should be insulated with 9 mm thick pipe section of nitrile rubber etc complete the work in all respect as per direction of EIC. |
| 3310 | 2.0 Tons Wall Mounted Split Unit Ground Floor Server Room(RM OFFICE) |
| 3311 | Sequence ControllerSupply and fixing microprocessor based control panel cum seqence operation controller for high wall type unit in server roomincluding wiring etc. The controller shall perform mainly the following function.etc complete the work in all respect as per direction of EIC. |
| 3312 | (RM OFFICE) |
| 3313 | FIRE FIGHTING & HYDRANT SYSTEM |
| 3314 | Providinglaying,testing&commissioningof\"C\"class heavydutyMSPipeconformingtoIS1239/3589i/c fittingslikeelbows,tees,flanges,tapers,nutsbolts, gasketsetc.ingroundincludingwelding,excavation& providingcementconcreteblocksassupports,anticorrosivetreatmentwithcoaltar/asphalttapeasper IS10221,refillingthetrenchetc.offollowingsizes complete as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3315 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 65 mm dia |
| 3316 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 80 mm dia |
| 3317 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 100 mm dia |
| 3318 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3319 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 200 mm dia (wall thickness 6.3 mm) |
| 3320 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/gunmetal seat duly ISI markedcompletewithnuts,bolts,washers,gaskets conforming to IS 13095 of following sizes as required etc complete the work in all respect as per direction of EIC. 80 mm dia |
| 3321 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/gunmetal seat duly ISI markedcompletewithnuts,bolts,washers,gaskets conforming to IS 13095 of following sizes as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3322 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/gunmetal seat duly ISI markedcompletewithnuts,bolts,washers,gaskets conforming to IS 13095 of following sizes as required etc complete the work in all respect as per direction of EIC. 200mm dia |
| 3323 | Supplying, fixing, testing & commissioning of double flanged sluice valve of rating PN 1.6 with non rising spindle, bronze/gun metal seat, ISI marked complete with nuts, bolts, washers, gaskets and conforming to IS 780 of following sizes as required etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3324 | Providing, installation, testing and commissioning of stainless steel Y-strainer fabricated out of 1.6 mm thick stainless steel, Grade 304, sheet with 3 mm dia holes with stainless steel flange etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3325 | Providing,installation,testingandcommissioningof non-returnvalveoffollowingsizesconfirmingtoIS:5312 complete with rubber,gasket,GI bolts,nuts, washers etc.as required etc complete the work in all respect as per direction of EIC. 80mm dia |
| 3326 | Providing,installation,testingandcommissioningof non-returnvalveoffollowingsizesconfirmingtoIS:5312 complete with rubber,gasket,GI bolts,nuts, washers etc.as required etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3327 | Providing,installation,testingandcommissioningof non-returnvalveoffollowingsizesconfirmingtoIS:5312 complete with rubber,gasket,GI bolts,nuts, washers etc.as required etc complete the work in all respect as per direction of EIC. 200mm dia |
| 3328 | Supplyingandfixingoffirebrigadeconnectionof cast iron body with gun metal male instantaneous inlet couplingscompletewithcapandchainasreqd.for suitabledia MS pipe connectionconforming to IS 904 as required etc complete the work in all respect as per direction of EIC. 4 way - 150 mm dia M.S. Pipe |
| 3329 | Supplying and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200 mm in height with air release valve on top and flanged connection to riser, drain arrangement with 25 mm dia gun metal wheel valve with required accessories, pressure gauge and paintingwith synthetic enamel paint of approved shade as required etc complete the work in all respect as per direction of EIC. |
| 3330 | Providing & fixing of pressure switch in M.S. pipe line including connection etc. as required etc complete the work in all respect as per direction of EIC. |
| 3331 | Providing & fixing dial type (100 mm) pressure gauge with isolation ball valve suitable for working pressure of 250 PSI, short pieces, nipples, elbows, stainless steel \"U\" tube & ball valve, etc as required as per specifications etc complete the work in all respect as per direction of EIC. |
| 3332 | Providing, fixing, testing and commissioning of CO2 type Fire Extinguisher of capacity 22.5 kg filled with Co2 Gas as per IS 15222 with controll discharge mechanism fitted with Hose, Horn & TROLLEYconfirms to IS 2878 bearing ISI mark. Co2 Cylinder as per IS 7285 etc complete the work in all respect as per direction of EIC. |
| 3333 | Providing & fixing double flanged flexicon rubber expansion joint (suitable for system test pressure) of standard length as per specs including rubber gaskets, flanges, nuts, bolts and washers complete as required as per specifications etc complete the work in all respect as per direction of EIC. 100 mm dia |
| 3334 | Providing & fixing double flanged flexicon rubber expansion joint (suitable for system test pressure) of standard length as per specs including rubber gaskets, flanges, nuts, bolts and washers complete as required as per specifications etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3335 | Providing, fixing, testing and commissioning gun metal suction coupling for fire brigade draw out of water from fire tank with 100 mm dia pipe with companion flange as per table \"E\", Cast Iron foot valve including nuts, bolts, gasket etc complete the work in all respect as per direction of EIC.Two way |
| 3336 | Supplying, installation, testing and commissioning of Electric driven Main Fire Pump suitable for automatic operation and consisting of following, complete in all respects, as required :Horizontal type, single stage, centrifugal, split casing pump of cast iron body & bronze impeller with stainless steel shaft, mechanical seal conforming to IS 1520.Suitable HP Squirrel cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation on 415 volts, 3 phase 50 Hz, AC supply with IP 55 protection for enclosure, horizontal foot mounted type with Class-\"F\" insulation, conforming to IS-325.M.S. fabricated Common base plate, coupling, coupling guard, foundation bolts etc. as required.Suitable cement concrete foundation duly plastered with anti vibration pads.1620 lpm at 70 m HeadNote: *The head of the pump is selected in a manner so as to give a minimum 3.5kgf/cm2 pressure at the highest/farthest point. etc complete the work in all respect as per direction of EIC. |
| 3337 | Supplying, installation, testing and commissioning of diesel engine driven main fire pump suitable for automatic operation and consisting of following, complete in all respects, as required : (Diesel Driven Pump)Horizontal type, single stage, centrifugal pump of cast of iron body and bronze impeller with stainless steel shaft, mechanical seal conforming to IS 1520.Suitable HP, 1500 RPM water cooled with radiator, diesel engine conforming to relevant IS standard complete with auto starting mechanism, 12 /24 voltselectric starting equipment, diesel tank, exhaust pipe extended upto 10 m outside pump house duly insulated with 50 mm thick glass wool with 1.0 mm thick aluminium sheet cladding, residential silencer, instruments and protection as per standard specification, stop solenoid for auto stop in the event of fault with audio indications, painted with post office red colour etc. as required.M.S fabricated, common base plate, coupling, coupling guard, foundation bolts etc. as required.Suitable cement concrete foundation duly plastered and with anti vibration pads.1620 lpm at 70 m HeadNote: *The head of the pump is selected in a manner so as to give a minimum 3.5kgf/cm2 pressure at the highest/farthest point etc complete the work in all respect as per direction of EIC. |
| 3338 | Supplying, installation, testing and commissioning of electric driven pressurisation pump suitable for automatic operation and consisting of following,complete in all respects, as required : (Jockey Pump)Horizontal type, single stage, centrifugal pump of cast iron body and bronze impeller with stainless steel shaft, mechanical seal conforming to IS : 1520.Suitable HP squirell cage induction motor TEFC type suitable for operation on 415 volts, 3 phase 50 Hz AC supply with IP 55 class of protection for enclosure,horizontal foot mounted type with Class-\"F\" insulation, conforming to IS : 325.M.S.fabricated Common base plate, coupling, couplingguard, foundation bolts etc. as required.Suitable cement concrete foundation duly plasteredand with anti vibration pads.180 lpm at 70 m Headetc complete the work in all respect as per direction of EIC. |
| 3339 | CONTROL PANELS Incomings630A, 50kA 4 Pole MCCB, Ics=100% Icu rating Digital VoltMtr 0-500V with selector switch AmMtr (0-630 A) with selector swtich & CTs etc.LED type RYB phase indicating lamps, ON, OFF, trip indicating lampsEach of Copper Bus Bar 800AmpsOutgoings( Note : All outgoing feeders for pumps should have digital AmMtr with selector switches, and LED type ON, OFF, trip indicating lamps)Main Fire Pump250 A, 50kA TPN MCCB, Ics=100% Icu, with fully automatic Star/Delta starter suitable for 100 hp pump with overload protection, current sensing type single phase preventor complete with all acceessories and internal wiring required for automatic operation, selector switch for local/remote, auto/manual/OFF operation.Jockey Pump125 A, 50kA TPN MCCB, Ics=100% Icu, with Suitable HP fully automatic Star/Delta starter with overload protection, current sensing type single phase preventorcomplete with all acceessories and internal wiring required for automatic operation, selector switch for local/remote, auto/manual/OFF operation.etc complete the work in all respect as per direction of EIC. |
| 3340 | Providinglaying,testing&commissioningof\"C\"class heavydutyMSPipeconformingtoIS1239/3589i/c fittingslikeelbows,tees,flanges,tapers,nutsbolts, gasketsetc.ingroundincludingwelding,excavation& providingcementconcreteblocksassupports,anticorrosivetreatmentwithcoaltar/asphalttapeasper IS10221,refillingthetrenchetc.offollowingsizes complete as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3341 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 25 mm dia |
| 3342 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 80 mm dia |
| 3343 | Providing,laying,testing&commissioningof \"C\"class heavydutyMSpipeconformingtoIS3589/IS1239 includingWelding,fittingslikeelbows,tees,flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3344 | Supplyingandfixingsingleheadedinternalhydrant valve with instantaneous Gunmetal/Stainless Steel coupling of 63 mm dia with cast iron wheelISI marked conformingtoIS5290(Type-A)withblank. Gunmetal / Stainless Steel cap and chain as required etc complete the work in all respect as per direction of EIC. Single headed Gunmetal |
| 3345 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/gunmetal seat duly ISI markedcompletewithnuts,bolts,washers,gaskets conforming to IS 13095 of following sizes as required etc complete the work in all respect as per direction of EIC.80 mm dia |
| 3346 | Supplying, fixing, testing and commissioning of butterfly valve of PN 1.6 rating with bronze/gunmetal seat duly ISI markedcompletewithnuts,bolts,washers,gaskets conforming to IS 13095 of following sizes as required etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3347 | Supplying, fixing, testing & commissioning of double flanged sluice valve of rating PN 1.6 with non rising spindle, bronze/gun metal seat, ISI marked complete with nuts, bolts, washers, gaskets and conforming to IS 780 of following sizes as required etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3348 | Providing, installation, testing and commissioning of stainless steel Y-strainer fabricated out of 1.6 mm thick stainless steel, Grade 304, sheet with 3 mm dia holes with stainless steel flange etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3349 | Providing,installation,testingandcommissioningof non-returnvalveoffollowingsizesconfirmingtoIS:5312 complete with rubber,gasket,GI bolts,nuts, washers etc.as required etc complete the work in all respect as per direction of EIC. 150mm dia |
| 3350 | Supplying and fixing 63 mm dia, 15 m long RRL hose pipewith63mmdiamaleandfemalecouplingsduly boundwithGIwire,rivetsetc.conformingtoIS636 (type-A) as required etc complete the work in all respect as per direction of EIC.Gun Metal |
| 3351 | Supplying andfixing first-aidHoseReelwithMS constructionspraypaintedinpostofficered,conformingtoIS884completewiththefollowingas required.20mmnominalinternaldiawaterhosethermoplastic (Textile reinforced) type -2 as per IS: 12585.20mmnominalinternaldiagunmetalglobevalve& nozzle.Drum and brackets for fixing the equipmets on wall.Connections from riser with 25 mm dia stop gun metal valve & M.S. Pipe and socket.30 m etc complete the work in all respect as per direction of EIC. |
| 3352 | Supplying & fixing 63 mm dia gun metal short branch pipe with 20 mm nominal internal diaMtr sizenozzle conforming to IS 903 suitable for instantaneous connection to interconnect hose pipe coupling as required etc complete the work in all respect as per direction of EIC. Gun Metal |
| 3353 | Supplyingandfixingoffirebrigadeconnectionof cast iron body with gun metal male instantaneous inlet couplingscompletewithcapandchainasreqd.for suitabledia MS pipe connectionconforming to IS 904 as required etc complete the work in all respect as per direction of EIC. 2 way-100 mm dia M.S. Pipe |
| 3354 | Supplying and fixing air vessel made of 250 mm dia, 8 mm thick MS sheet, 1200 mm in height with air release valve on top and flanged connection to riser, drain arrangement with 25 mm dia gun metal wheel valve with required accessories, pressure gauge and paintingwith synthetic enamel paint of approved shade as required etc complete the work in all respect as per direction of EIC. |
| 3355 | Providing & fixing of pressure switch in M.S. pipe line including connection etc. as required etc complete the work in all respect as per direction of EIC. |
| 3356 | Supplying and fixing orifice plate made out of 6 mm thick stainless steel (Grade 304) with orifice of required size to be fitted between flange & landing valve of external and internal hydrants to reduce pressure at the outlet to the level of 3.5 kg/cm2 complete as required etc complete the work in all respect as per direction of EIC. |
| 3357 | Providing & fixing dial type (100 mm) pressure gauge with isolation ball valve suitable for working pressure of 250 PSI, short pieces, nipples, elbows, stainless steel \"U\" tube & ball valve, etc as required as per specifications etc complete the work in all respect as per direction of EIC. |
| 3358 | Supply, installation, testing and commissioning ISI marked (IS:2878) Fire Extinguisher, Carbon-di-oxide type capacity 4.5 Kg. Flat base including valve, discharge hose of not less than 10 mm dia, 1M long and complete in all respects including initial fill with CO2 gas conforming to IS:307-1966 and walll suspension braket as required as per specifications etc complete the work in all respect as per direction of EIC. |
| 3359 | Supply, installation, testing and commissioning of 4kg ABC (Powder Type) Fire Extinguisher. Mild Steel Cylinders ISI marked TAC approved fitted with pressure indicating gauge, internal tube, squeeze lever type valve fully charged with ABC powder (Mono Ammonium Phosphate) pressured by Nitrogen complete in all respects including wall suspension bracket and conforming to IS:13849-1993 as required as per specifications etc complete the work in all respect as per direction of EIC. |
| 3360 | Supply, installation, testing and commissioning Clean Agent type capacity 5 Kgfire extinguisher filled with HFC 236 FA clean Agent Gas. Complete with squeeze grip release valve, locking arrangement, pressure gauge,operation manual and bracket etc complete the work in all respect as per direction of EIC. |
| 3361 | Providing and fixing fire hose cabinet door fabricated from 16 gauge M.S. Sheet with single or double glazed front door (with 4 mm thick glass) and locking arrangement, painted fire red with stove enamelled paint \"FIRE HOSE\" written on front including necessary supports approximate size.2100x1200 mm (IFH) (Door ) etc complete the work in all respect as per direction of EIC. |
| 3362 | Providing & fixing double flanged flexicon rubber expansion joint (suitable for system test pressure) of standard length as per specs including rubber gaskets, flanges, nuts, bolts and washers etc complete the work in all respect as per direction of EIC. 100 mm dia |
| 3363 | Providing & fixing double flanged flexicon rubber expansion joint (suitable for system test pressure) of standard length as per specs including rubber gaskets, flanges, nuts, bolts and washers etc complete the work in all respect as per direction of EIC. 150 mm dia |
| 3364 | Providing and fixing standard fireman\"s axe with heavy insulated rubber handle conforming to IS: 926 etc complete the work in all respect as per direction of EIC. |
| 3365 | Supplying, installation, testing and commissioning of Electric driven Main Fire Pump suitable for automatic operation and consisting of following, complete in all respects, as required : (Terrace Pump)Horizontal type, single stage, centrifugal, split casing pump of cast iron body & bronze impeller with stainless steel shaft, mechanical seal conforming to IS 1520.Suitable HP Squirrel cage induction motor, TEFC, synchronous speed 1500 RPM, suitable for operation on 415 volts, 3 phase 50 Hz, AC supply with IP 55 protection for enclosure, horizontal foot mounted type with Class-\"F\" insulation, conforming to IS-325.M.S. fabricated Common base plate, coupling, coupling guard, foundation bolts etc. as required.Suitable cement concrete foundation duly plastered with anti vibration pads.450 lpm at 35 m Head etc complete the work in all respect as per direction of EIC. |
AI Tender Summary
Tender Timeline
Oct 11, 2021
11:30 IST
Tender Published
Tender notice published.
CompletedNov 08, 2021
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedNov 09, 2021
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender