Heavy Industries and Public Enterprises Boards / Undertakings / PSU Closing in 0 days TDR #29514921

1 Picking 50Mm To 100Mm Old Metaled Picking 50Mm To 100Mm Old Metaled / Tarred Surface And Sectioning Including All Labour, Charges, Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification. 2 2 Scooping, Collecting, And Conveyi

Issued by Boards / Undertakings / PSU · , Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
29 Oct 2021
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
→ Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

1 Picking 50Mm To 100Mm Old Metaled Picking 50Mm To 100Mm Old Metaled / Tarred Surface And Sectioning Including All Labour, Charges, Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification. 2 2 Scooping, Collecting, And Conveying Spillages Scooping, Collecting, And Conveying Spillages Earth From The Road Surface And Dumping The Same Within Initial Lead Of 50M As Directed By The Company Authorities Including Sectioning All Labour Charges Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification. 3 3 Supplying Best Quality Wet Mix Macadam Supplying Best Quality Wet Mix Macadam ( Wmm ) From The Approved Crusher And Stacking At The Places As Directed By The Company Officials For Maintenance And Repairs Of Damaged Portion Of The Road From Main Gate Towards South Up To Nh Puthenthura Including All Cost & Conveyance Of Materials , Labour Charges For Heaping , Loading , Unloading Charges Etc. Complete As Per Standard Specification. 4 4 Labour Charges For Spreading Wet Mix Macadam Labour Charges For Spreading Departmental Wet Mix Macadam ( Wmm ) In Layers Using Man Power & Mechanical Devices With Minimum Thickness Of 15Cm, Including Leveling To Required Camber & Gradient, Watering If Required, Consolidating With Power Roller, All Labour Charges, Hire And Other Expenses For 10 Ton Road Roller, Hire Charges For Tools & Plants Etc. Complete As Per Standard Specification 5 5 Providing Bitumen Premix 80 Mm Thick Layers Providing Bitumen Premix 80 Mm Thick Layers For Pot Holes, Cross Cuttings Etc. Using Departmental Materials Viz. 54 Kg / M2 ( 48 Kg / M3 Of Broken Stone ) And 36 Mm Broken Stone 1.125 M2 Including Hire For Mixing, Wheel Barrows, Roller, Cost Of Fuel And Oil, Hire For Wire Brushes, Bass Brooms, Lighting, Watching And Other Sundry Stores Etc. Complete As Per Standard Specification. 6 6 Providing 25Mm Thick Bitumen With 6Mm Providing 25Mm Thick Bitumen Concrete Surfacing With 6Mm Flushing Seal Coat, Using Departmental Materials Viz. 18Mm Broken Stone 0.15M3 And 12 / 9Mm Broken Stone 0.18 M3 6Mm Broken Stone0.15M3 Premixed With Hot Bitumen ( 48Kg / M3 Of Brocken Stone And 112Kg / M3 Of 6Mm Broken Stone ) 36.72Kg / 10M2 Including A Tack Coat Of 5Kg Per 10M2 ( 48Kgper M3 Of Stone, 112Kg Per M3 Of 6Mm Chips ) Hire For Boiler, Sprayer, Roller, Drum Mixers, Wire Brushes, Bass Brooms, Cost Of Fuel And Oils, Lighting, Watching And Other Sundry Stores Etc. Complete As Per Standard Specification. 7 7 Supplying And Stacking 36Mm Blue Granite Stone Supplying And Stacking 36Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 8 8 Supplying And Stacking 18 Mm Blue Granite Stone Supplying And Stacking 18 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc Complete As Per Standard Specification 9 9 Supplying And Stacking 12 / 9 Mm Blue Granite Stone Supplying And Stacking 12 / 9 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 10 10 Supplying And Stacking 6 Mm Blue Granite Stone Supplying And Stacking 6 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 11 11 Supplying And Applying Medium Setting Bitumen Emulsion Supplying And Stacking And Applying Track Coat Using Bitumen Emulsion Conforming To Is 8887, Using Emulsion Pressure Distributer Including Preparing The Surface And Cleaning With Mechanical Broom For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification ( Medium Setting Bitumen Emulsion Ss-1 0.4 Kg / Sqm ) 12 12 Supplying And Applying Rapid Setting Bitumen Emulsion Supplying And Stacking And Applying Track Coat Using Bitumen Emulsion Conforming To Is 8887, Using Emulsion Pressure Distributer Including Preparing The Surface And Cleaning With Mechanical Broom For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification ( Rapid Setting Bitumen Emulsion Rs-1 0.4 Kg / Sqm ) 13 13 Supplying Bitumen Good Condition Vg- 30 Supplying And Stacking Approved Quality Bitumen In Steel Sealed Containers Of Good Condition ( Vg-30 ) For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification

AI Tender Summary

OUR REF NO 29514921
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 29-10-2021
Authority
Authority Name Indian Rare Earths Limited
Work Description 1 Picking 50Mm To 100Mm Old Metaled Picking 50Mm To 100Mm Old Metaled / Tarred Surface And Sectioning Including All Labour, Charges, Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification. 2 2 Scooping, Collecting, And Conveying Spillages Scooping, Collecting, And Conveying Spillages Earth From The Road Surface And Dumping The Same Within Initial Lead Of 50M As Directed By The Company Authorities Including Sectioning All Labour Charges Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification. 3 3 Supplying Best Quality Wet Mix Macadam Supplying Best Quality Wet Mix Macadam ( Wmm ) From The Approved Crusher And Stacking At The Places As Directed By The Company Officials For Maintenance And Repairs Of Damaged Portion Of The Road From Main Gate Towards South Up To Nh Puthenthura Including All Cost & Conveyance Of Materials , Labour Charges For Heaping , Loading , Unloading Charges Etc. Complete As Per Standard Specification. 4 4 Labour Charges For Spreading Wet Mix Macadam Labour Charges For Spreading Departmental Wet Mix Macadam ( Wmm ) In Layers Using Man Power & Mechanical Devices With Minimum Thickness Of 15Cm, Including Leveling To Required Camber & Gradient, Watering If Required, Consolidating With Power Roller, All Labour Charges, Hire And Other Expenses For 10 Ton Road Roller, Hire Charges For Tools & Plants Etc. Complete As Per Standard Specification 5 5 Providing Bitumen Premix 80 Mm Thick Layers Providing Bitumen Premix 80 Mm Thick Layers For Pot Holes, Cross Cuttings Etc. Using Departmental Materials Viz. 54 Kg / M2 ( 48 Kg / M3 Of Broken Stone ) And 36 Mm Broken Stone 1.125 M2 Including Hire For Mixing, Wheel Barrows, Roller, Cost Of Fuel And Oil, Hire For Wire Brushes, Bass Brooms, Lighting, Watching And Other Sundry Stores Etc. Complete As Per Standard Specification. 6 6 Providing 25Mm Thick Bitumen With 6Mm Providing 25Mm Thick Bitumen Concrete Surfacing With 6Mm Flushing Seal Coat, Using Departmental Materials Viz. 18Mm Broken Stone 0.15M3 And 12 / 9Mm Broken Stone 0.18 M3 6Mm Broken Stone0.15M3 Premixed With Hot Bitumen ( 48Kg / M3 Of Brocken Stone And 112Kg / M3 Of 6Mm Broken Stone ) 36.72Kg / 10M2 Including A Tack Coat Of 5Kg Per 10M2 ( 48Kgper M3 Of Stone, 112Kg Per M3 Of 6Mm Chips ) Hire For Boiler, Sprayer, Roller, Drum Mixers, Wire Brushes, Bass Brooms, Cost Of Fuel And Oils, Lighting, Watching And Other Sundry Stores Etc. Complete As Per Standard Specification. 7 7 Supplying And Stacking 36Mm Blue Granite Stone Supplying And Stacking 36Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 8 8 Supplying And Stacking 18 Mm Blue Granite Stone Supplying And Stacking 18 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc Complete As Per Standard Specification 9 9 Supplying And Stacking 12 / 9 Mm Blue Granite Stone Supplying And Stacking 12 / 9 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 10 10 Supplying And Stacking 6 Mm Blue Granite Stone Supplying And Stacking 6 Mm Nominal Size Blue Granite Stone In Standard Heaps For Measurements Including All Cost And Conveyance Of Materials And Labour Charges For Heaping Etc. Complete As Per Standard Specification 11 11 Supplying And Applying Medium Setting Bitumen Emulsion Supplying And Stacking And Applying Track Coat Using Bitumen Emulsion Conforming To Is 8887, Using Emulsion Pressure Distributer Including Preparing The Surface And Cleaning With Mechanical Broom For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification ( Medium Setting Bitumen Emulsion Ss-1 0.4 Kg / Sqm ) 12 12 Supplying And Applying Rapid Setting Bitumen Emulsion Supplying And Stacking And Applying Track Coat Using Bitumen Emulsion Conforming To Is 8887, Using Emulsion Pressure Distributer Including Preparing The Surface And Cleaning With Mechanical Broom For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification ( Rapid Setting Bitumen Emulsion Rs-1 0.4 Kg / Sqm ) 13 13 Supplying Bitumen Good Condition Vg- 30 Supplying And Stacking Approved Quality Bitumen In Steel Sealed Containers Of Good Condition ( Vg-30 ) For The Work Including All Cost And Conveyance Of Materials And Labour Charges For Stacking, Loading - Unloading Charges Etc. Complete As Per Standard Specification
Basic Detail
Tender No IREL/Chavara/21-22/ET/52
Bidding Type Tender
Location
City
State Kerala
Key Dates
Publish Date 11 Oct 2021
Submission Date 29 Oct 2021
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
a042dedf-06f8-4e13-a72a-2727363e7d2f.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 01, 1900
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 29, 2021
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
html

a042dedf-06f8-4e13-a72a-2727363e7d2f.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders