|
| 1 | Cleaning jungle including uprooting of trunk vegetations grass, bush, wood trees and saplings of girth upto 30 cm measured at a height of 1 meter above ground level & removal of rubbish up to a distance of 50 meters out side the periphery of area cleared. Analysis of rates on the basis of item 41 of CPWD analysis of 1S55 schedule) S.I. No. 259 |
| 2 | Excavationin foundation inordinary soil (loam ,clay or sand) including lift up to 1.50 m.& lead upto 30 m. and including filling, watering and ramming of excavated earth in to the trenches or in to the space between t he build1r1g and the sides of foundation trenche s or into theplinth and remov al and disposal of surplus earth as directed by theEngineer-in -charge up to a distar1ce of30 meter from the foundation trenches. .251 |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniformlayers with motorgraderon preparedsurface, mixing by mixin place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause S.N. No- 401 |
| 4 | Providing laying spreading and compacting stone aggregates of specific sizes to water bound macadam (G-2) specification including spreading in uniform thickness, hand packing rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper gradeand camber,applying andbrooming requisitetypeofscreening/binding • materials to fill-up the interstices of coarse aggregate, watering and compacting to . the required density. |
| 5 | P/L of 80mm thick rubber Moulded Zig-Zag, Reflective interlocking Tiles with sand filling including supply of all materials labour and T&P etc all complete. |
| 6 | Class-150 brick work in 1:4 cement and Coarse -sand mortor in foundation and plinth including supply of all materials.labour and· T&P etc.required for proper completion of the work . S.N. No- 305(b) |
| 7 | PCC work with cement, approved coarse sand and 20mm gauge approved stone ballast in the proportion of 1:2:4 in bed plates excluding the supply of reinforcement and its bending but including its bending supply of all other materials labour and T&P as per SI No. 279 |
| 8 | Supply and fixing of NP-3 350 mm Dia Hume Pipe |
| 9 | Mild steel or iron in plain work such as reinforced concrete or reinfocrd brick work . wrought to required shape as necessary including bending for proper completion of workandincludingsupplyofTor steelitswastagebendhookandauthorised over1apping shall be measured as per SI No. 504 |
| 10 | R.C.C.work with cement ,approved coarse sand and 20 mm (3/4\") gauge approved stone ballastin the proportion of 1:2:4in lintels of doors and windows sunshade and RCC projection excluding supply of reinforcement and its bending the same with 24BG binding wire including supply of all materials, labour and T&P etc. required for proper completion of the work as per SI No. 283 |
| 11 | Supply and fixing of Information /Caution Board / lnaugration Stone,Videography & Photographyatsiteincludingalllabour,material,T&P,requiredforproper completion of work as directed by EIC. |