| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge.All kinds of soil |
| 2 | Providing and laying dry stone solling hand packed including cost of stones |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etc upto floor V level, including curing but excluding the cost of centring, shutteringand finishing with.1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 4 | Centering and shuttering including strutting, propping etc and removal of form work. |
| 5 | Walls any thickness including attached pilasters, buttresses, plinth and string coarses etc. |
| 6 | 12mm thick cement plaster in 1:4 mix (1cement: 4sand) |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded |
| 8 | Providing installation of winch machine of approved quality including gun metal, net greasing, double threaded winch rods including fixing of rain caps of required size all sorts of carriage (Rate to be quoted) |
| 9 | Providing and fixing of rubber seal gates/ sluices for checking of leakages PVC quality with 25*5 mm flat iron strips including cost of nuts and bolts (Rate to be quoted) |
| 10 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc completeOn steel work |
| 11 | Carriage of materials from source to Dumpingsite of work by M. T. including cost of loading, unloading and stacking. |
| 12 | Stone solling average lead 20 Kms |
| 13 | Stone agg. 20 mm aggregate nominal size for avg. lead20 Kms |
| 14 | Sandavg lead 20 kms |
| 15 | Cementand steel for avg. lead 04 kms |
| 16 | Extra Carriage of materials fromDumpingsite to actual site of work by head load including cost of loading, unloading and stacking average lead 400 meters. |
| 17 | Stone solling |
| 18 | Stone agg. 20 mm aggregate nominal size |
| 19 | sand |
| 20 | Cement |
| 21 | Steel |