|
| 1 | Loading of ST Pole 9 Mtr Long |
| 2 | Un-Loading of ST Pole 9 Mtr Long |
| 3 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of ST Pole 9 Mtr Long |
| 4 | Loading of ST Pole 8 Mtr Long |
| 5 | Un-Loading of ST Pole 8 Mtr Long |
| 6 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of ST Pole 8 Mtr Long |
| 7 | Loading of ST Pole 11 Mtr Long |
| 8 | Un-Loading of ST Pole 11 Mtr Long |
| 9 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of ST Pole 11 Mtr Long |
| 10 | Loading of PCC Pole 8 Mtr Long |
| 11 | Un-Loading of PCC Pole 8 Mtr Long |
| 12 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of PCC Pole 8 Mtr Long |
| 13 | Loading of Transformer 16KVA to 100KVA |
| 14 | Un-Loading of Transformer 16KVA to 100KVA |
| 15 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of Transformer 16KVA to 100KVA |
| 16 | Loading of Transformer 100KVA to 300KVA |
| 17 | Un-Loading of Transformer 100KVA to 300KVA |
| 18 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of Transformer 100KVA to 300KVA |
| 19 | Loading of Transformer 300KVA to 630KVA |
| 20 | Un-Loading of Transformer 300KVA to 630KVA |
| 21 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of Transformer 300KVA to 630KVA |
| 22 | Loading of Channel Iron, Angle Iron, Extension top, GI. Wire/ Guy wire |
| 23 | Un-Loading of Channel Iron, Angle Iron, Extension top, GI. Wire/ Guy wire |
| 24 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of Channel Iron, Angle Iron, Extension top, GI. Wire/ Guy wire |
| 25 | Loading of HT Pin insulators & Pins ,LT Shackles & D Clamps, Disc Insulators & Fitting guy insulators, 11KV Link set / GOD Set, DO Set, LA Set, Fuse set & other allied material. |
| 26 | Un-Loading of HT Pin insulators & Pins ,LT Shackles & D Clamps, Disc Insulators & Fitting guy insulators, 11KV Link set / GOD Set, DO Set, LA Set, Fuse set & other allied material. |
| 27 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of HT Pin insulators & Pins ,LT Shackles & D Clamps, Disc Insulators & Fitting guy insulators, 11KV Link set / GOD Set, DO Set, LA Set, Fuse set & other allied material. |
| 28 | Loading of 0.1/0.05/0.03/0.02 ACSR Conductor |
| 29 | Un-Loading of 0.1/0.05/0.03/0.02 ACSR Conductor |
| 30 | Stocking/Stacking/Counting/Weighing/Unwinding/Dragging (Avg 100 meters) of 0.1/0.05/0.03/0.02 ACSR Conductor |
| 31 | Loading of Transformer Oil (Barrels) |
| 32 | Un-Loading of Transformer Oil (Barrels) |
| 33 | Stocking/Stacking/Counting/Weighing/Dragging (Avg 100 meters) of Transformer Oil (Barrels) |