}

Refurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi: Scope Of Workrefurbishment Of Rvi Includes Painting Of Acm And Painting Of Painting Of False Ceili-Bihar

Bharat Petroleum Corporation Limited-BPCL has published Refurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi: Scope Of Workrefurbishment Of Rvi Includes Painting Of Acm And Painting Of Painting Of False Ceili. Submission Date for this Tender is 20-10-2021. Coats and Jackets Tenders in Bihar. Bidders can get complete Tender details and download the document.




Tender Notice

29462730
Refurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi: Scope Of Workrefurbishment Of Rvi Includes Painting Of Acm And Painting Of Painting Of False Ceili
Open Tender
Indian
Bihar
20-10-2021

Tender Details

Refurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi As Per Specification Given In Tedner Documentsrefurbishment Of Rvi: Scope Of Workrefurbishment Of Rvi Includes Painting Of Acm And Painting Of Painting Of False Ceiling At Any Retail Outlet. 4-5 Years Old Rvi And False Ceiling Loses Its Lustre With Passage Of Time. We Want To Go For Refurbishment Of Rvi For Increasing Longevity Of Rvi Look And Feel At Retail Outlets. The Scope Of Work Includes Following: 1.Canopy False Ceiling Refurbishment: Cleaning/ Preparing The Existing Surface And Coating Of Cleaned Acm Smooth Finish Required. Cleaning And Painting Two Coats Of White Polyurethane Paint On Existing Canopy False Ceiling Surfaces. Rate Will Includes Scaffolding Cost. 2.Acm Refurbishment:Cleaning/ Preparing The Existing Surface And Coating Of Cleaned Acm Smooth Finish Required. Cleaning And Painting Two Coats Of White Metal Fluorocarbon Polyurethane Paint On Existing Canopy False Ceiling Surfaces. Rate Will Includes Scaffolding Cost. Process And Details Of Metal Fluorocarbon Polyurethane Paint Is Given Below. 1.All Work Shall Be In Accordance With The Scope Of Work. 2.Protect The Surrounding Area Mpd, Sidewalks And Roadways. The Contractor Shall Maintain A Safe Work Area Around The Facility. 3.Contractor Shall Paint All Siding, Columns, And Ceilings. 4.Contractor Shall Clean All Surfaces Prior To Painting As Per Standard Practice And Specification And In Consultation With Engineering In-Charge. 5.Contractor Will Be Responsible For Removal And Disposal Of All Trash And Debris.6.Contractor Shall Provide All Tools And Equipment That Are Necessary To Complete The Project. 7.The Worksite Shall Be Secured And Cleaned Up Daily.8.Contractor Shall Inspect All Surfaces Prior To Applying Paint To Ensure That The Surface Is Suitable For Painting. Any Sub-Standard Surfaces Are To Be Reported To The Site Superintendent Prior To Commencing Work.9.After The First Coat Of Paint, The Surface Shall Be Inspected And Repaired As Necessary By The Contractor Prior To The Application Of The Second Coat Of Paint, Touch Ups Shall Be Completed So As Not To Be Readily Visible. It Is Understood That This May Require Two Coats Of Paint.Metal Fluorocarbon Polyurethane Coatingproduct Formation:Two Component Paint, Group A Is By Senior Acrylic Resin, Pigments, Additives And Solvent, And Isocyanate As Group B.Using:Applicable To Steel Structure Of Bridge, Port Machinery, Engineering Machinery, Containers, Ships, Decorative Sheet, Building Fascia, Outdoor Building Aluminium Sheet And Electricity Station, Substation, Require Long-Term Protection Against Corrosion Decorative Topcoat.Technical Data:Color And Appearance Of Paint Film : Grey Film Formationviscosity (Stormier Viscometer), Ku : ≫60Fineness, Um : ≪40Gloss : High, Mattsolids Content : 55-65Flashing Point : 27Dry Film Thickness, Um : 60Drying Time (25), H : Surface Dry 2Hrs, Hard Dry 24Hrhardness, Class : ≫0.5Adhesion (Zoned Method), Class : ≪1Impact Strength, Kg, Cm : ≫Soflexibility, Mm : ≪1 Alkali Resistance : 48 Hrswater Resistance : 48 Hrs120 Gasoline Resistance : Resistantdouble Coating Interval Time:Temperature:5 Degree, 25 Degree, 40 Degreeshortest Time 12H :6H, 12 Hlongest Time :No Limitedsurface Treatment:All Surfaces Must Be Clean, Dry And Free Of Contamination. Before Painting, Should Be Assessed And Treated In Accordance With Standard Of The Iso8504:2000.Construction Condition:The Temperature Of The Base Floor Is Not Less Than 0, And At Least 3 Than The Air Dew Point Temperature, The Relative Humidity Must Less Than 85% (Should Be Measured Near The Base Material), Fog, Rain, Snow, Wind And Rain Is Strictly Prohibited Construction.Construction Method:Spraying: Non Air Spraying Or Air Spraying. High Pressure Non Gas Spraying.Brush / Roll Coating: Must Achieve The Specified Dry Film Thickness.Process: To Get Start The Coating On Pump, Initially To Clean The Pump Very Minutely With Soft Muslin Cloth And A Liquid Detergent. Additional Footstep Is To Rub The Building Facia, Canopy Facia With Sand Paper. Following Pace Is To Apply Primer Of 2030 Series On Old Surface It Is Used As It Is For The Furtherance And The Paint Will Stay Longer On It. Then Usage Of Metal Fluorocarbon Polyurethane Coating To Bounce The Surface As New As Rvi Sheet And As Per The Same Colour Matching Prescribed By Company.

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail