Brahmapur Development Authority has published Constriction Of Walk-Through Optical Illusion Entertainment ( W-Toie ) At Rock Garden, Ambapua, Brahmapur. Submission Date for this Tender is 27-10-2021. Footpath Work Tenders in BRAHMAPUR Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | CIVIL WORKS |
2 | Gypsum Board false ceiling |
3 | Colouring of Inside wall (Matt Black Colour) |
4 | Vinyl flooring of the room of 125 sqm |
5 | Ceiling light (10 watt - white LED Make-Philips or equivalent) |
6 | Fixing of Two Wooden Door of size( 1200 mm X 2100 mm) outside opening with lock. |
7 | 2 Ton Split AC (Voltas make) alongwith installation charges. |
8 | Stabilizer - (130 Input, Make- V Guard) |
9 | AC Stand |
10 | Electrical wiring of the room with MCB, MCCB, DP switch, required cables etc. |
11 | WALK THROUGH OPTICAL ILLUSION ENTERTAINMENT |
12 | Site Survey, Layout Study, Design and Drawings of the Pogo Penguin’s Ice Age Challenge, Walk-through Optical Illusion Entertainment (W-TOIE). |
13 | Puzzle Elements: These shall be a network of triangular cells with themed decorative and reflective properties. These shall be a network of cells with themed decorative and reflective properties. A cell is a triangular segment.There shall be to a minimum of: 80nos. |
14 | Special Effects A ‘magic’ window which ‘opens’ to show an animated scene/character with sound |
15 | A false exit illusion |
16 | A destination chamber |
17 | Special effects: |
18 | Infinity illusion |
19 | Introduction area with graphics, lights and digital display. |
20 | Selfie photo posing booth. |
21 | Sound system: Suitable sound track playing on a loop and system comprising: min 300w RMSamplifier with digital file input and 10 nos. 6”dia 30w 100v speakers distributed throughout the W-TOIE. |
22 | Lighting LED lights 6w minimum RGB colour changing 80 nos. |
23 | Other light effects as required |
24 | Decorative panels: Forming internal passage ways including at entrance and exit |
25 | Explanatory panel for entrance: |
26 | Facade design in adhesive vinyl flex |
27 | Control panels, Master controller for SFX etc. |
28 | Switch panel for controlling lights. |
29 | Packing & Freight |
30 | Assembling all elements and equipment at the site, installation,Testing & commissioning and Training operators/attendants. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail