Construction Of Cc Road And Drain At Varous Place In Ward No. 9 In Nagar Palika Pushkar Limit Construction Of Cc Road And Drain At Varous Place In Ward No. 9 In Nagar Palika Pushkar Limit
Tender Overview
Project Description
Construction Of Cc Road And Drain At Varous Place In Ward No. 9 In Nagar Palika Pushkar Limit Construction Of Cc Road And Drain At Varous Place In Ward No. 9 In Nagar Palika Pushkar Limit
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-Oct-2021 | correction in condition | Technical Bid | 18-Oct-2021 |
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as morrum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth Upto 1.5m |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking : Earth 05KM |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming toIS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determinedduring trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manualy,compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material,labour, machinery, lighting, guarding and maintenance of diversion. |
| 5 | Centering and shuttering with plywood or steel up to two storey or height uo to 7.5 mtr above plinth level including strutting, proping, etc. and removal formwork for foundation etc. |
| 6 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone gregate 20 mm nominal size) |
| 8 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (Lcement : 5 coarse sand) with joints finished flush white and stone |
| 9 | P/F of Reinforced Ferro Cement Drain cover Designed for class \"AA\" loading duly marked on cover with adequate steel reinforcement having thickness 75 mm to 150 mm anti - corrosive bitumen painted M.S. plate rim and on M.S. lifting hook admixture like plasticizer bonad improving compound abrasion resistant complete per approved design etc.Standard Size 600x800 mm (75mm thick) for span 300 to 450 mm.A-Size 600 x 800 mm |
| 10 | Structural steel work in single section fixed with or without connecting plate including cutting hoisting ,fixing in position and applying a priming coat of approved steel primer all complete. |
| 11 | L-Section |
| 12 | Structural steel work riveted, bolted or welded in built up sections. Trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 13 | Supplying & Fixing 560mm dia SFRC manhole Frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. EHD-35 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender