Water Supply And Sanitation Department-WSSD has published ) To Design And Build All Components Of The Drinking Water Supply Systems Includingwater Treatment Plant Atpatre Wala Of 68 Mld Capacity Storage Tanks, Raw Water And Clear Water Pumping Stations Along With Pumping Electro Mechanical Machinery, Clear W. Submission Date for this Tender is 22-12-2021. Electromechanical Machinery Tenders in Patre Wala (Abohar) Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Oct-2021 | Pre bid meeting online link | Other | 18-11-2021 |
2 | 27-Oct-2021 | Corrigendum2 | Fee | 18-11-2021 |
3 | 29-Oct-2021 | Corrigendum for Bank Account No | Other | 18-11-2021 |
4 | 02-Nov-2021 | Corrigendum for time extension | Date | 29-11-2021 |
5 | 17-Nov-2021 | Form of Bid Security Bank Gurantee | Other | 29-11-2021 |
6 | 17-Nov-2021 | PRE-BID Queries | Other | 29-11-2021 |
7 | 27-Nov-2021 | Corrigendum | Date | 06-12-2021 |
8 | 03-Dec-2021 | CORRIGENDUM | Date | 17-12-2021 |
9 | 03-Dec-2021 | CORRIGENDUM | Other | 17-12-2021 |
10 | 17-Dec-2021 | Corrigendum date extend | Date | 21-12-2021 |
11 | 17-Dec-2021 | Corrigendum for taxes | Other | 21-12-2021 |
12 | 21-Dec-2021 | Corrigendum for extend | Date | 22-12-2021 |
Sl. No. | Item Description |
1 | Activity:- 1- Design Services |
2 | GPS ground control survey for verifying the authenticity of AutoCAD based maps / information provided by DWSS, sub-soil investigations for design and estimation and chemical testing of raw water quality |
3 | WTP Patrewala |
4 | Preparation of design report for all works specified for the complete Water Supply System |
5 | WTP Patrewala |
6 | Preparation of detailed design and drawings including technical specification of all works according to approved design |
7 | WTP Patrewala |
8 | Provisional sum for establishment of Project Office of Contractor at WTP with complete office amenities to support project execution, drinking water and sanitation facilities,material stacking area, equipment holding area, vehicle parking lot, repair shed for entire duration of contract as per specifications of Labour Department and ESMP. The locations and design shall be submitted to and approved by Employer"s Representative. |
9 | WTP Patrewala |
10 | Provisional sum for establishment of Labour Camp for scheme (with each location having separate camps for male and female labour) with living arrangement, drinking water facilities, cooking arrangement, mosquito net, waste bin etc., for entire duration of construction period as per specifications of Labour Department and ESMP. Each camp shall have separate provisions for male and female labour. The locations and design shall be submitted to and approved by the Employer"s Representative |
11 | WTP Patrewala |
12 | Provisional sum for establishment of temporary labour camps along transmission linenetwork, with living arrangement, drinking water and sanitation facilities, cooking arrangement, mosquito net, waste bin, material stacking, etc., for duration of work at respective sites as per specifications of Labour Department and ESMP. Each camp shall have separate provisions for male and female labour. The locations and design shall be submitted to and approved by Employer"s Representative |
13 | WTP Patrewala |
14 | Provisional sum for implementation and updation of EIA, ESHS-MSIP and development and implementation of Communication Plan for IEC of communities affected due to project activities (construction, disruption of services, traffic regulations, etc.) in accordance with Code of Conduct as submitted to and approved by the Employer"s Representative |
15 | WTP Patrewala |
16 | Establish baseline for Ambient Air Quality Monitoring for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP. Air Quality monitoring at each WTP/Head work (2 locations i.e. at windward side and leeward side), raw water tapping point (1 nos. each Cluster), transmission line (2 nos each Cluster, locations mutually agreed by contractor and Employer"s Representative). Monitoring is to be done as per CPCB guidelines and from CPCB accredited labs. The locations and design shall be submitted to and approved by the Employer"s Representative. |
17 | WTP Patrewala |
18 | Establish baseline for Noise Quality Monitoring at each WTP/Head works (1 no.), raw water each tapping point (1 nos.), transmission line (2 nos each cluster, locations mutually agreed by contractor and Employer"s Representative). Monitoring done as per CPCB guidelines and from CPCB accredited labs. The locations and design shall be submitted to and approved by the Employer"s Representative. |
19 | WTP Patrewala |
20 | Provisional sumfor payment towards which areto be taken by contractor Statutory permits/clearances as per Section VII- ESHS-MSIP |
21 | WTP Patrewala |
22 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
23 | WTP Patrewala |
24 | Activity H2 -RAW WATER SYSTEM: Construction and commissioning of Raw Water intake Systems, including lifting of water from canal by suitable action ,Raw Water pumping station,Rising Main upto WTP from source. Construction of S&S Tank and RCC Sump at WTP etc for Raw Water at WTP, Gravity main for S&S Tank. |
25 | Construction of Storage & Sedimentation Tank (S/S Tank)in conformity with relevant BIS Code of Practices with latest amendments,Raw water Rising main of required size from Canal to S/S Tank complete in all respect, inconformity withrelevant BISCode of Practices withlatestamendments ¤tatthetimeof execution and following the norms etc. as prescribed by theDepartment of Water Resources,Punjab/CompetentAuthority,all complete. |
26 | WTP PATREWALA (Capacity 136000 cum) |
27 | Construction of Raw Water Pumping Stations RCC framed suitable sizes minimum 70 Sqm area including accessaries complete in all respect, including lifting of water from canal by suitable action as prescribed by theDepartment of Water Resources,Punjab/CompetentAuthority,all complete.and Providing Raw water pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable typewith matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for raw water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution.at Canal. |
28 | WTP Patrewala |
29 | Providing Raw water pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable type with matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for raw clear water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution at WTP site. |
30 | WTP Patrewala |
31 | Construction of RCC Sump for Raw Water at WTPappropriate capacity including all necessary earth work in conformity with relevant BIS Code of Practiceswith latest amendments& current at the timeof execution complete in all respects. |
32 | WTP Patrewala |
33 | Supplying, laying, jointing, testing and completion ofDI pipeline of appropriate size and length (as per all relevantBIS specification) for raw water pumping main including allnecessary earthwork, valves&specials, valve chamber, supporting structures, crossing of canals/drains, anchor / thrust block etc. compete in all respect including dismantling, restoration/ reconditioning of all kinds of roads, road berms, culverts, or any other structure to be dismantled during laying of pipe line (as per norms of the concerned department) to its original condition. (S&S Tank to Raw Water Sumpto WTP) |
34 | WTP Patrewala |
35 | Provisional sum for MS Barricading along construction site, of at least 3.05 m. height where deep excavation is required and at least 1.52 m. height other wise, 3 m in front to fully secure the construction site and restricting entry of unauthorized personnel. Barricading to be retained till completion of activity 6. |
36 | WTP Patrewala |
37 | Provisional Sum for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment and to be retained till completion of activity 6. |
38 | WTP Patrewala |
39 | Dust suppression measures by water spraying 3 times site a day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements. Activity to be carried out till completion of activity 6. |
40 | WTP Patrewala |
41 | Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme andECoPs ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation. to be retained till completion of activity 6. |
42 | WTP Patrewala |
43 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
44 | WTP Patrewala |
45 | Activity H3:-WATER TREATMENT SYSTEM: WATER TREATMENT SYSTEM: WATER TREATMENT SYSTEM: Construction and commissioning of WTP using best suitable technology; probably compact in nature |
46 | Construction of Complete Water Treatment Plants based on usage of surface water supply of minimum output capacity of Patrewala 68 MLD with suitable designs in conformity with the relevant BIS Code of practices with latest amendments,having filtration rate not less than 4.8m/hr, provision for disinfection, including all necessary Mechanical and Electrical Installation Works suitable for automated operation of the plant, Provision for Laboratory Facility, sludge management system, all internal connections & by-pass piping system, including provision of minimum 50 sqmt area at ground floor and 1stfloor each, for Office, Chemical Storage, blowers and chlorination etc. All internal and external electrification work for compound lighting etc., Electrical control panels for connecting & hooking up of the electrical switch gears of various drive motors of the Treatment Plant units etc. including 3 months trial run period., for Water Treatment Plant, the Bidder can use best, latest and proven technologies so as to have a compact system to save space and ease of management. All the valves and other controls should be DI; instruments should be of best quality; and no leakages are allowed in WTP premises. |
47 | WTP Patrewala (68 MLD) |
48 | Provisional Sum for M.S Barricading along construction site, including WTP, clear water tank and other structure at water works, of at least 10 ft height where deep excavation is required and at least 5 ft height other wise, 3 m in front to fully secure the construction site and restricting entry of unauthorized personnel Barricading to be retained till completion of activity 9. |
49 | WTP Patrewala |
50 | Provisional Sum for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment. To be provided till completion of activity 9. |
51 | WTP Patrewala |
52 | Dust suppression measures by water spraying 3 times each WTP a day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements. To be continued till completion of activity 9. |
53 | WTP Patrewala |
54 | Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme and ECoPs ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer. All waste to be disposed within 3 days of generation. To be continued till completion of Activity 9. |
55 | WTP Patrewala |
56 | Air quality monitoring beyond establishing baseline during design build period done every 6 months at each WTP for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP at 2 locationsWTP/Head work (windward and leeward). Monitoring done as per CPCB guidelines and from CPCB accredited labs. |
57 | WTP Patrewala |
58 | Noise quality monitoring beyond establishing baseline during design build period done every 6 months done at each WTP/Head Work as per CPCB guidelines and from CPCB accredited labs at construction site and heavy equipment/material stacking site. |
59 | WTP Patrewala |
60 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
61 | WTP Patrewala |
62 | Activity:- 4-CLEAR WATER SYSTEM: Construction of Clear Water Reservoir including pump room, machinery, Clear Water Sump at WTP for Clear Water and IPS if any. |
63 | Construction of minimum 9.30Million ltrs. Capacity RCC Under Ground Treated Water Sump in 2 (two) compartments and with a suction wells for suction of clear water machinery, having provision for all inlet, outlet & overflow arrangements; calibrated water level indicators; Air Vent Pipes; Man Holes with Covers; PVC Lugs inside the sump etc. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item |
64 | WTP Patrewala (9.30 Million Liter) |
65 | Clear Water Pumping Station with RCC framed structure having minimum 6 meter clear height from floor to bottom of slab, near to clear water suction well of suitable size with all necessary electrical fittings & fixtures viz. light / fan / power socket etc., arrangement of proper ventilation, firefighting, disposal of over flow water from pump sets and necessary plinth protection work. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item |
66 | WTP Patrewala |
67 | Construction of RCC Sump for clear water at WTPappropriate capacity including all necessary earthwork in conformity with relevant BIS Code of Practiceswith latest amendments& current at the timeof execution complete in all respects. |
68 | WTP Patrewala |
69 | Providing and installation of clear water/ IPS pumping machinery with Variable frequency drive panel of appropriate capacity horizontal split casing type electrically operated centrifugal pump set or any other suitable type with matching drive motor,ofreputed makeand conforming to BIS specification & other regulatory norms, ( with minimum 50% machinery as standby extra than required capacity) with variable frequency drive where required, for clear water pumping including foundation works, electrical and other installation works, providing all necessary suction/delivery piping arrangement with control valves & specials, arrangement for priming pumps with standby provision, priming water tank with staging & required Pipes & specials etc.(common priming arrangement for all the pumps for different route). Furnishing the Manufacturer"s test certificate & characteristic performance curve of the pumps, all complete, All pumps, electrical drive motors & other appurtenances shall be of reputed make & conforming to BIS Specification and other regulatory norms, current at the time of design and execution. In case, intermediate pumping systems are proposed by the bidder at locations outside WTP site, then the rate for that should be included in this item. |
70 | WTP Patrewala |
71 | Provisional Sum for payment towards for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment. To be continued till completion of Activity 9. |
72 | WTP Patrewala |
73 | Dust suppression measures by water spraying 3 times at eachWTP a day throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirement. To be continued till completion of Activity 9. |
74 | WTP Patrewala |
75 | Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme and ECoPs ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation. To be continued till completion of Activity 9. |
76 | WTP Patrewala |
77 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
78 | WTP Patrewala |
79 | Activity:- H5-CLEAR WATER TRANSMISSION SYSTEM:Providing, Laying, jointing and testing of Transmission Systems connecting all villages to be covered in the scheme for defined supply conditions |
80 | Supplying, laying, jointing, testing and commissioning of requisite dia. DITransmissionMains (as per all relevantBIS specifications) from proposed Clear Water Reservoir/ (UGSR)to the Existing/ Proposed OHSRs of the Existing/ Proposed village Water supply systems including all necessary earthwork, crossing of drains/ canals/ culverts etc., air valves, flow control valves, pressure regulating valves, necessary Specials, flow meters, valve chambers, supporting structures, anchor/ thrust block etc. including dismantling, restoration/ reconditioning of all kinds of roads, road berms, culverts, or any other structure to be dismantled during laying of pipe line (as per norms of the concerned department) to its original condition. |
81 | WTP Patrewala |
82 | For pipe dia 500 mm and above – Provisional Sum for Installation of a steel (MS) portable barricade with horizontal rail 300 mm wide, 2.5m in length fitted on a frame made with 45x45x5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 Coats) with yellow and white stripes, 150 mm in width at an angle of 450, A frame painted with 2 coats of yellow paint, complete as per IRC: SP: 55-2001 complete as per specifications till the road is made motorable. |
83 | WTP Patrewala |
84 | For Pipes dia less than 500mm Provisional Sum for Installation of barricade made of wooden components, 1.5 m high from road level, fitted with 3 horizontal planks 200 mm wide and 3.66 m long on 100 x 100mm wooden vertical post, painted with yellow and white stirrups, 150 mm in width at an angle of 45 degree, complete as per IRC:SP:55-2001. |
85 | WTP Patrewala |
86 | Provisional Sum for payment towards for Occupational Health and Safety practices including, but not limited to, signage"s at and along construction sites, personal protection equipment |
87 | WTP Patrewala |
88 | Dust suppression measures by water spraying 3 times a day at each Cluster throughout the construction period till completion of works, in and around the works site, uncovered aggregates and loose materials such as stockpiles of the sands, excavated earth etc. daily or as per requirements |
89 | WTP Patrewala |
90 | Provisional Sum for Disposal of waste - silt, C&D, Hazardous waste, vegetation waste as per GoI/ PPCB guidelines and ESIA/ESMP of scheme andECoPs ESMF, including safe handling of waste onsite, hauling to authorised disposal sites, and clearances from PPCB/Employer"s Representative. All waste to be disposed within 3 days of generation. |
91 | WTP Patrewala |
92 | Ambient Air quality monitoring beyond establishing baseline during design build period done every 6 months at each cluster for PM10, PM2.5, NO2, SO2, CO as per the method defined in Section VII – ESHS-MSIP at 2 locations (windward and leeward). Monitoring done as per CPCB guidelines and from CPCB accredited labs. |
93 | WTP Patrewala |
94 | Noise quality monitoring beyond establishing baseline during design build period done every 6 months done at each cluster as per CPCB guidelines and from CPCB accredited labs at construction site and heavy equipment/material stacking site. |
95 | WTP Patrewala |
96 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
97 | WTP Patrewala |
98 | Activity:- H6SITE DEVELOPMENT: Development of Raw Water Pumping Station, WTP Area, clear water system and any intermediate pumping system including Boundary Walls |
99 | Land Development & Security Brick/RCC boundary Wall, designed to withstand all weather conditions, of 1.8 mtr. height around Raw Water systems, Water Treatment plant area (including clear water systems) and any other intermediate pumping systems if any including MS gates finishedwithsuitable paint including 3.50 mtr. wide internal road suitable for appropriate loading,arboriculture,compound illuminationwith sufficientno. of Solar street lights designed for suitable luminosity to cover complete systems built under this includingnecessary labour, materials, paintings, site development for aesthetics, etc complete in all respects. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item. |
100 | WTP Patrewala |
101 | Plantation of trees at each WTP and approach roads. Impacted trees to be identified by Operator in consultation with Forest Department in presence of Employer"s Representative to ensure no endangered species impacted. Locations for plantation of trees to be submitted to and approved by Employer"s Representative. Plant Species to be planted as per the guidance of Forest Department. Tree plantation to be completed during defect liability period and must ensure survival of plants throughout O&M period.. |
102 | WTP Patrewala |
103 | Any additional items of work, goods and services to implement as per the ESHS-MSIP, except the items already covered above. |
104 | WTP Patrewala |
105 | Activity:- H7Providing, Installtion and Commissioning Generator Set and Trasformer |
106 | Providing, Installing and Commissioning ofSub Station system with necessary Transformers, capacitors etc., to meet demand of all electrical systems’ capacity to run Raw Water Pumping Machinery, Water Treatment Plant, Clear Water Pumping Machinery and other electrical accessories within the premises of Raw Water pumping station area and WTP area including meter room as per requirement of PSPCL, connecting electric cables, HT panel etc., suitable protection and all other works contingent there to complete in all respect at Canal & WTP. In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item |
107 | WTP Patrewala |
108 | Providing, Installing and Commissioning low noise (Silent) Generating Set of Suitable capacity to run Raw Water Pumping Machinery, Water Treatment Plant, Clear Water Pumping Machinery and other electrical accessories within the premises of Raw Water pumping station area and WTP area, connecting electric cables, HT panel etc., suitable protection and all other works contingent there to complete in all respect at Canal & WTP.In case, intermediate pumping is proposed by the bidder at other than WTP site, then the rate for that should be included in this item. |
109 | WTP Patrewala |
110 | Activity:- H8Monitoring Systems: Implementation and operation of SCADA includes PLC and other instrumentation |
111 | Supplying, Installing, synchronizing, testing and completion of SCADA systems. as per Section VIII Technical Specification of SCADA . |
112 | WTP Patrewala |
113 | Supplying, installing and testing of Electro Magnetic Flow Meters (AMR)(as per all relevant BIS or ISO specification with latest amendments) of reputed make, along with dismantling joints, at required locations, complete in all respects as per Section VIII Technical Specification of SCADA |
114 | WTP Patrewala |
115 | Activity:- H9Construction of office Building and Staff quarter. |
116 | Building for Official use for DWSS with area 70.00 sqmt having 600 mm. high plinth & 3300 mm. finished clear roof height including toilet block at treatment plant site having aluminium casement window / ventilator, 1st. class local hard Wood door frame, 1st. class local hard Wood panelled shutter (Toilet door shall be of solid moulded PVC frame & 25 mm. thick PVC shutter), internal wall finished with plastic paint & exterior surfaces finished with weather coat cement paint with RCC roof slab including all necessary internal water supply & sanitary installation work, internal electrification (with concealed copper wiring of required Cross Section area) with all necessary electrical fittings & fixturesviz., light / fan / power socket etc., necessary plinth protection work, white ant treatment, compound electrification with LED & Installation of 2 Nos. Air Conditioners of 1.5 ton capacity each. |
117 | WTP Patrewala |
118 | Twin type accommodation at Treatment Plant Location for 1 (one) No. Plant Operator and 1 (one) No. Chowkider having total plinth area of 84.5 sqm (42.25 sqm per dwelling unit) having 600 mm. high plinth & 3300 mm. finished clear roof height comprising of 1 bed room with attached toilet, 1 living room, 1 kitchen & 1 entry veranda having aluminium casement window / ventilator, 1st. class local hard Wood door frame, 1st. class local hard Wood panelled shutter (Toilet door shall be of solid moulded PVC frame & 25 mm. thick PVC shutter), internal wall finished with plastic paint & exterior surfaces finished with weather coat cement paint with RCC roof slab including all necessary internal water supply & sanitary installation work , internal electrification (with concealed copper wiring of required Cross Section area) with all necessary electrical fittings & fixturesviz., light / fan / power socket etc., necessary plinth protection work, white ant treatment, compound electrification with LED. |
119 | WTP Patrewala |
120 | Total price of – Activities carried forward to the Priced Activity Schedule, Page 112 to 133 |
121 | Note:- The estimate with quantities and rates provided in the bid document is for information and internal benchmark purpose and does not affect the quoted price of the bidder. The final amount of contract will be as quoted by the bidder for the quantities submitted according to the designs furnished to cover the scope of work irrespective of variation in the quantities. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail