| 1 | Engaged Honda pump for pumping outwater from wellduring excavation. |
| 2 | Engagedoperator for pumping out water from wellduring excavation. |
| 3 | Demolishing brick work in lime mortar manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge |
| 4 | Earth work in excavation all kinds of soil by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation/bankingexcavated or stacked material : All kinds of soil : |
| 6 | Extrarates for quantities of works executed in or under water and or liquid mud includig pumping out water as required 20 % of the rate of item |
| 7 | Earth work in excavation in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. incl. disposal of surplus excavated earthincl. all leads, lifts & carriage of material by MT / H.L. |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) incl. all leads, lifts & carriage of material by MT/ H.L. |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including all leads, lifts & carriage of material by MT / H.L. |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5coarse sand :3graded stone aggregate 20 mm nominal size) incl. all leads, lifts & carriage of material byMT/ H.L. |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position &binding all complete upto plinth level Cold twisted bars incl. all leads, lifts &carriage of material by M.T/H.L. |
| 12 | Centring and shuttering including strutting propping etc and removal of form workfor |
| 13 | Foundations, footings, bases of columns etc. for mass concrete. |
| 14 | Suspended floors, roofs, landings, balconies and access platforms. |
| 15 | Lintel, beams, plinth beams, girders, bressumers and cantilevers |
| 16 | 12 mm cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand) including all leads, lifts and carriage of material by M.T / H.L. |
| 17 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) including all leads, lifts and carriage of material by M.T / H.L. |
| 18 | Half brick masonry with common burnt clay (non-modular) bricks of class designation7.5 in foundations and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand) including all leads, lifts and carriage of material by M.T / H.L. |
| 19 | Steel work welded in built up sections/framed work, incl. cutting,hoisting, fixing in position & applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates & similar works. |
| 20 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mmangle iron and 3mm M.S. gusset plates at the junctions and corners, allnecessary fittings complete, including applying a priming coat of approvedsteel primer. using flats 30x6mm for diagonal braces and central cross piece |
| 21 | Providing and placing on terrace (at all floor levels) polyethylene waterstorage tank ISI : 12701 marked, with cover & suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank |
| 22 | Providing and fixing G.I. pipes complete with G.I. fittings excludingtrenching and refilling etc. (external work) 32 mm dia. nominal bore medium |
| 23 | Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. complete (new work) 32 mm nominal bore |
| 24 | Providing and fixingtank nipple 15 mm dia |
| 25 | Providing, fixingand installation of 0.5 H.P. motor Pump for boosting of water ofKalsi Brand or Equivalent (complete job) |
| 26 | Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS:15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4 ( 1 cement : 4 coarse sand) including pointing the joints with white cement and matching pigment etc., complete. In all colours, shades, except White, Ivory, Fume Red Brown |
| 27 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes channels, plates etc. including welding ,grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete ,including fixing the railing with necessary accessories and stainless steel dash fasteners, stainless steel bolts etc. of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). |
| 28 | Providing and fixing sign board (Iron Made ) ( sheet size 0.90 mtr x 0.60 mtr) with both legs embedded in cement concrete block incl. painting and writing & all leads, lifts and carriages of material by MT/HL |